 Issue dateTitleTopic
ML20210P59711 August 1999Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25
ML20210P63010 August 1999Corrected Proposed Tech Specs Re Diesel Generator TestingSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Offsite Circuit
ML20210N5129 August 1999Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630Safe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Anticipated operational occurrence
Time to boil
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Unidentified leakage
ML20195E5178 June 1999Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5
ML20207A39124 May 1999Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15Safe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Offsite Circuit
ML20199D03913 January 1999Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside AtmosphereTime to boil
Fuel cladding
ML20206R28011 January 1999Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 GallonsSafe Shutdown
Anticipated operational occurrence
Operating Basis Earthquake
Earthquake
ML20198L62131 December 1998Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation
ML20198G40022 December 1998Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CEOperating Basis Earthquake
Nondestructive Examination
Earthquake
Pressure Boundary Leakage
ML20196H9324 December 1998Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate
ML20195J90223 November 1998Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating
ML20195J95523 November 1998Proposed Tech Specs Re Turbine Missile ProtectionTurbine Missile
ML20155B87420 October 1998Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal
ML20154J2999 October 1998Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B
ML20153G75122 September 1998Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable
ML20151W68010 September 1998Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7Reactor Vessel Water Level
Post Accident Monitoring
ML20151T6564 September 1998Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint TolerancesCoast down
ML20236S62422 July 1998Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCOOffsite Circuit
ML20249B42919 June 1998Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power LevelsAnticipated operational occurrence
ML20216B62011 May 1998Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option BHigh Radiation Area
ML20216B4147 May 1998Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131
ML20217P8476 April 1998Proposed Tech Specs Revising Containment Isolation Valves Completion TimesHigh Radiation Area
ML20216C0056 March 1998Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1Hot Short
Safe Shutdown
Anticipated operational occurrence
ML20199K6453 February 1998Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program
ML20198H8519 January 1998Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection TrainStroke time
ML20198H6889 January 1998Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks
ML20198H7609 January 1998Proposed Tech Specs 3.8.1 Re Extension of EDG Completion TimeSafe Shutdown
Offsite Circuit
ML20198E6052 January 1998Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing
ML20197C72819 December 1997Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability
ML20199C63914 November 1997Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection BarriersSafe Shutdown
Tornado Missile
Tornado Generated Missile
Tornado Missile Protection
Turbine Missile
ML20148R40530 June 1997Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11Post Accident Monitoring
ML20141B44818 June 1997Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing ConditionsSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Offsite Circuit
ML20198R02830 May 1997Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Tornado Missile
Probabilistic Risk Assessment
Tornado Generated Missile
Design basis earthquake
Earthquake
Pressure Boundary Leakage
Offsite Circuit
Unidentified leakage
ML20137V25015 April 1997Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap TestingSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Offsite Circuit
ML20134P99421 February 1997Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS InstrumentationBoric Acid
ML20138L11518 February 1997Proposed Tech Specs Defering Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3Boric Acid
ML20134M08316 February 1997Proposed Tech Specs Re Requirements of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation
ML20134J6997 February 1997Proposed Tech Specs SR 3.1.5.4, CEA Alignment
ML20134G7916 February 1997Proposed Tech Specs 3.1.5, CEA Alignment
ML20134A99124 January 1997Proposed Tech Specs Revising SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which More Accurately Reflects Safety Analysis ConditionsOffsite Circuit
ML20133G91014 January 1997Proposed Tech Specs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements
ML20133F77413 January 1997Proposed Tech Specs Providing Followup to Request for Discretionary Enforcement from SR 3.0.3 Requirements Delaying Implementation of SR 3.8.1.14 & 3.8.1.15 of TS 3.8.1,until NRC Approves Revs
ML20128P36311 October 1996Proposed Tech Specs Reinstating Provisions of TS Revised as Part of Amends 127 & 116
ML20117K99330 August 1996Proposed Tech Specs,Clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 W/O Initial U-235 Enrichment to Explicity Show That Acceptable Zone of Operation Ends at Maximum of 4.8 W/O
ML20116C68029 July 1996Proposed Tech Specs,Consisting of Change Request 443, Permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Spent Fuel to Be Consolidated After Min Required Time in SFPs
ML20113C25625 June 1996Proposed Tech Specs,Revising TS 3.3.11, Pami, & 5.5.2.13, Diesel Fuel Oil Testing ProgramReactor Vessel Water Level
Post Accident Monitoring
ML20117L06111 June 1996Revised Proposed Tech Specs Re LCO 3.3.11, Post Accident Monitoring Instrumentation (Pami)Post Accident Monitoring
ML20112D4613 June 1996Proposed Tech Specs,Reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116Reactor Vessel Water Level
Post Accident Monitoring
ML20117J83930 May 1996Proposed Tech Specs,Consisting of Change Number 164, Requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App JHigh Radiation Area
ML20112D03529 May 1996Approved Tech Specs,Amends 127 & 116 & Proposed TS for Units 2 & 3