ML20210P597 | 11 August 1999 | Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 | |
ML20210P630 | 10 August 1999 | Corrected Proposed Tech Specs Re Diesel Generator Testing | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
ML20210N512 | 9 August 1999 | Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 | Safe Shutdown Boric Acid Shutdown Margin Stroke time Anticipated operational occurrence Time to boil Fuel cladding Pressure Boundary Leakage Offsite Circuit Unidentified leakage |
ML20195E517 | 8 June 1999 | Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 | |
ML20207A391 | 24 May 1999 | Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
ML20199D039 | 13 January 1999 | Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere | Time to boil Fuel cladding |
ML20206R280 | 11 January 1999 | Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons | Safe Shutdown Anticipated operational occurrence Operating Basis Earthquake Earthquake |
ML20198L621 | 31 December 1998 | Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation | |
ML20198G400 | 22 December 1998 | Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE | Operating Basis Earthquake Nondestructive Examination Earthquake Pressure Boundary Leakage |
ML20196H932 | 4 December 1998 | Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate | |
ML20195J902 | 23 November 1998 | Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating | |
ML20195J955 | 23 November 1998 | Proposed Tech Specs Re Turbine Missile Protection | Turbine Missile |
ML20155B874 | 20 October 1998 | Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal | |
ML20154J299 | 9 October 1998 | Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B | |
ML20153G751 | 22 September 1998 | Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable | |
ML20151W680 | 10 September 1998 | Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 | Reactor Vessel Water Level Post Accident Monitoring |
ML20151T656 | 4 September 1998 | Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances | Coast down |
ML20236S624 | 22 July 1998 | Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO | Offsite Circuit |
ML20249B429 | 19 June 1998 | Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels | Anticipated operational occurrence |
ML20216B620 | 11 May 1998 | Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B | High Radiation Area |
ML20216B414 | 7 May 1998 | Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 | |
ML20217P847 | 6 April 1998 | Proposed Tech Specs Revising Containment Isolation Valves Completion Times | High Radiation Area |
ML20216C005 | 6 March 1998 | Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 | Hot Short Safe Shutdown Anticipated operational occurrence |
ML20199K645 | 3 February 1998 | Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program | |
ML20198H851 | 9 January 1998 | Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train | Stroke time |
ML20198H688 | 9 January 1998 | Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks | |
ML20198H760 | 9 January 1998 | Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time | Safe Shutdown Offsite Circuit |
ML20198E605 | 2 January 1998 | Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing | |
ML20197C728 | 19 December 1997 | Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability | |
ML20199C639 | 14 November 1997 | Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers | Safe Shutdown Tornado Missile Tornado Generated Missile Tornado Missile Protection Turbine Missile |
ML20148R405 | 30 June 1997 | Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 | Post Accident Monitoring |
ML20141B448 | 18 June 1997 | Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
ML20198R028 | 30 May 1997 | Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Tornado Missile Probabilistic Risk Assessment Tornado Generated Missile Design basis earthquake Earthquake Pressure Boundary Leakage Offsite Circuit Unidentified leakage |
ML20137V250 | 15 April 1997 | Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Offsite Circuit |
ML20134P994 | 21 February 1997 | Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation | Boric Acid |
ML20138L115 | 18 February 1997 | Proposed Tech Specs Defering Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 | Boric Acid |
ML20134M083 | 16 February 1997 | Proposed Tech Specs Re Requirements of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation | |
ML20134J699 | 7 February 1997 | Proposed Tech Specs SR 3.1.5.4, CEA Alignment | |
ML20134G791 | 6 February 1997 | Proposed Tech Specs 3.1.5, CEA Alignment | |
ML20134A991 | 24 January 1997 | Proposed Tech Specs Revising SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which More Accurately Reflects Safety Analysis Conditions | Offsite Circuit |
ML20133G910 | 14 January 1997 | Proposed Tech Specs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements | |
ML20133F774 | 13 January 1997 | Proposed Tech Specs Providing Followup to Request for Discretionary Enforcement from SR 3.0.3 Requirements Delaying Implementation of SR 3.8.1.14 & 3.8.1.15 of TS 3.8.1,until NRC Approves Revs | |
ML20128P363 | 11 October 1996 | Proposed Tech Specs Reinstating Provisions of TS Revised as Part of Amends 127 & 116 | |
ML20117K993 | 30 August 1996 | Proposed Tech Specs,Clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 W/O Initial U-235 Enrichment to Explicity Show That Acceptable Zone of Operation Ends at Maximum of 4.8 W/O | |
ML20116C680 | 29 July 1996 | Proposed Tech Specs,Consisting of Change Request 443, Permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Spent Fuel to Be Consolidated After Min Required Time in SFPs | |
ML20113C256 | 25 June 1996 | Proposed Tech Specs,Revising TS 3.3.11, Pami, & 5.5.2.13, Diesel Fuel Oil Testing Program | Reactor Vessel Water Level Post Accident Monitoring |
ML20117L061 | 11 June 1996 | Revised Proposed Tech Specs Re LCO 3.3.11, Post Accident Monitoring Instrumentation (Pami) | Post Accident Monitoring |
ML20112D461 | 3 June 1996 | Proposed Tech Specs,Reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 | Reactor Vessel Water Level Post Accident Monitoring |
ML20117J839 | 30 May 1996 | Proposed Tech Specs,Consisting of Change Number 164, Requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J | High Radiation Area |
ML20112D035 | 29 May 1996 | Approved Tech Specs,Amends 127 & 116 & Proposed TS for Units 2 & 3 |