ML20128P363

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Reinstating Provisions of TS Revised as Part of Amends 127 & 116
ML20128P363
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/11/1996
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20128P349 List:
References
NUDOCS 9610170233
Download: ML20128P363 (8)


Text

- _ _ _ _

NPF-10/15-472 ATTACHMENT "A" (Existing Specifications)

Unit 2 1

9610170233 961011 PDR ADOCK 05000361 P

PDR

i Refueling Water Level 3.9.6 3.9 REFUELING OPERATIONS i

3.9.6 Refueling Water Level LC0 3.9.6 Refueling water level 'shall be maintained 2 23 ft above the top of readtar vessel flange.

APPLICABILITY:

During CORE ALTERATIONS, except during latching and l

unlatching of control rod drive shafts, During movement of irradiated fuel assemblies within containment.

j ACTIONS l

I i

CONDITION i

REQUIRED ACTION COMPLETION TIME A.

Refueling water level A.1 Suspend CORE Immediately j

not within limit.

ALTERATIONS.

4 AND

)

4 A.2 Suspend movement of Immediately irradiated fuel 4

assemblies within I

containment.

j i

4 i

SURVEILLANCE REQUIREMENTS I

l i

SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify refdeling water level is 2 23 ft 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> above the top of reactor vessel flange.

3 4

4 i

i i

j SAN ONOFRE--UNIT 2 3.9-10 Amendment No. 127 i

NPF-10/15-472 J

i

,J 4

.4 1

I ATTACHMENT "B" (Existing Specifications) l Unit 3 R

i i

3 s

l l

'1

Refueling Water Level 3.9.6 1

3.9 REFUELING OPERATIONS 3.9.6 Refueling Water Level LC0 3.9.6 Refueling water level shall be maintained 2 23 ft above the top of reactor vessel flange.

APPLICABILITY:

During CORE ALTERATIONS, except during latching and unlatching of control rod drive shafts, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION

=

REQUIRED ACTION COMPLETION TIME A.

Refueling water level A.1 Suspend CORE Immediately not within limit.

ALTERATIONS.

AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify refueling water level is 2 23 ft 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> above the top of reactor vessel flange.

SAN ONOFRE--UNIT 3 3.9-10 Amendment No. 116

NPF-10/15-472 a

d e

4 s

s i

ATTACHMENT "C" (Proposed Specifications)

Unit 2 t

4 d

+

4

+

~

Refueling Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Refueling Water Level LCO 3.9.6 Refueling water level shall be maintained 123 ft above the top of reactor 5 net' El'MYe' d'$.ggsel flange.

~

~

d t313 'lme % imp M i ~ N ~E *.....

M.

, s Jr4 av moup% o9 cv4 es eten s ce he e

e

  • fin APPLICABILITY:

'n F,bb' ' hie I*6 M M ' " " * ~ ' ' E I'l ' l I ' ' 'l c

'~~~~

ia,+:u:__

~ ; E l a 'ZIT,; X ' 4 "_, ' "'" "

-"d.

_r

__ m During mov,ement of irradiated fuel assemblies within containment.

  • %i w.ssel nEm4 et M sasnadel;<$ or CE4,5 wM;%1%.t**'N ACTIONS
      • **W *** 'A ""the. M e arv e.Wt iwig M **
  • M[Al**

iwr

* "**** P N asM W3 W * "" N' CONDITION REQUIRED ACTION COMPLETION TIME A.

Refueling water level A.1 Suspend CORE Immediately not within limit.

ALTERATIONS.

AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

%c SR 3.9.6.1

  • Verify 4 refueling water level a c C G.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

?$5Nbs$5.Yd '$$Wb 'sNAlt ;h

~yaa s<ea.

. n. -~

SAN ONOFRE--UNIT 2 3.9-10 Amendment No. 127 l

NPF-10/15-472 ATTACHMENT "D" (Proposed Specifications)

Unit 3

o Refueling Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Refueling Water Level LCO 3.9.6 Refueling water level shall be maintained 2 23 ft above the

.........-. ~..to.p of reactor vessel l ange..

..........n W l*wl k f*****4. k a W,

u.=

b out nee.pu9 of ces n. W g et & 4.......

23 A f aliew

.4 4 -m+.

. f

,o re, A.y ceAs c

$t[p%Yfn&,Y.Q[?ki weirr*nid*,;.;n', 4,;;, g*,;iain*{ :n

,y c % ++s ot %. m,.;9 nn12+-hing nf -nnt-n1,.nci d ri v, esse +r, During movement of' irradiated fuel assemblies within containment.

Q"n.a osu tekn er-ceAs wi% 6 ***&w kl saumbtas inta ap g Wsten L~

ACTIONS 8M M'

=

CONDITION REQUIRED ACTION COMPLETION TIME 4

A.

Refueling water level A.1 Suspend CORE Immediately

~

not within limit.

ALTERATIONS.

AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY

.I t

T u.

SR 3.9.6.1

/ Wrify4 refueling water level is t 22 #ts 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ab:'.; the Lug vi i e ac i.u r vessei ska n b<. dc4cmW4 i, be n+ imi. 'i$'l ang. 9 m*.am,- e utesa amik.

i SAN ONOFRE--UNIT 3 3.9-10 Amendment No. 116

-