Other: ML19208C975, ML19210C110, ML19224D658, ML19256A851, ML19257A287, ML19274D850, ML19323A194, ML19339A586, ML19343C511, ML19345C480, ML19350B962, ML20028C674, ML20028C678, ML20033C783, ML20033C785, ML20033D092, ML20040C345, ML20040D946, ML20040D951, ML20054K130, ML20065T047, ML20071G018, ML20244A473
|
MONTHYEARML20244A4731978-09-29029 September 1978 Forwards Addl Info in Response to 780718 NRC Ltr Re Site Rev Scheduled on Fire Protec Prog on 781105 Project stage: Other IR 05000334/19780301978-12-0101 December 1978 IE Insp Rept 50-334/78-30 on 781031-1103.No Noncompliance Noted.Major Areas Inspected:Fire Protection Program,Piping Supports & Containment Liner Welds Project stage: Request ML20071G0181978-12-11011 December 1978 Forwards Addl Info Requested in 780718 NRC Ltr Re Fire Protec Prog.Subj Covered Incl:Combined Fire & Security Emergency Personnel,Failure Analysis,Suppl Fire Dept, & in-house Audit Plan Project stage: Other ML19256A8511979-01-11011 January 1979 Responds to Re Plant Fire Protection Program. Includes Implementation Schedule Summary.Activities & Mods Will Be Completed During Refueling Outages of 1981 & 82 Project stage: Other ML19274D8501979-02-21021 February 1979 In Response to ,Forwards Suppl Implementation Schedule for Fire Protection Commitments Re Equipment Installation Project stage: Other ML20244A5661979-03-26026 March 1979 Summarizes 790305 Meeting W/Util on Site to Discuss Fire Protection for Facility.Attendance List & Proposed Mods List Encl Project stage: Meeting ML19224D6581979-06-0606 June 1979 Amend 18 to License DPR-66,revising Tech Specs Re safety-related Snubbers,Fire Protection,Chemical Releases & Environ Considerations Project stage: Other ML19224D6561979-06-0606 June 1979 Forwards Amend 18 to License DPR-66,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19208C9751979-08-24024 August 1979 Urges Util to Improve Schedules for Completion of Fire Protection Mods Prior to Oct 1980.Requests That Any Outstanding Info Re Open Items & Required Design Details Be Submitted on Expedited Basis Project stage: Other ML19210C1101979-11-0505 November 1979 Notifies of Deviation from 790221 Schedule for Implementation of Fire Protection Sys.Installation of Temporary Fire Detectors in Unit 2 Control Room Area Will Be Completed by 791109 Project stage: Other ML19257A2871979-12-27027 December 1979 Advises of Inability to Comply w/790111 & 0221 Commitment Re Fire Protection Sys Implementation Schedule.Engineering Work More Complex than Anticipated Project stage: Other ML19290C8781980-01-26026 January 1980 Request Assistance in Review of Licensees Proposed Mods to Meet Fire Protection Safety Evaluation Commitments.Schedule for Evaluations Should Be Consistent W/Implementing Mods by 801101 Project stage: Approval ML19260D3991980-01-31031 January 1980 Forwards Design Details for NRC 791231 Fire Protection Safety Evaluation Rept,Items 3.19-1 & 3.19-2.Requirement to File Design Prior to Implementation Was Overlooked Project stage: Request ML19323A1941980-04-0404 April 1980 Advises That 800131 Proposed Design Basis Re Addl Smoke Detectors for Control Room & 1-h Fire Rated Barrier Meet Guidelines & Are Acceptable Project stage: Other ML19336A4661980-10-0101 October 1980 Forwards Mods Required to Resolve Open Items Indicated in 790606 Safety Evaluation Re Fire Protection Project stage: Approval ML19339A5861980-10-30030 October 1980 Forwards Addl Info Re Fire Protection Sys Mods,Per NRC 801001 Request.Oversize Drawings Encl Project stage: Other ML19345C4801980-11-17017 November 1980 Informs of Interim 10CFR50.48 Suspending Completion Dates for Previously Approved Fire Protection Mods.Revised 10CFR50.48 Will Contain Schedules for Completion of All Fire Protection Mods Project stage: Other ML20002D0841980-12-23023 December 1980 Notifies That Util 781211 Commitment to Install Addl Hoses & Hose Stations Is Acceptable for Meeting Concerns Re Item 3.3-7 of Safety Evaluation for Amend 18 to OL Project stage: Approval ML19343C5111981-03-18018 March 1981 Requests,Per 10CFR50.12,extension of Specified Schedule Dates of Newly Enacted Fire Protection Regulations in 10CFR50.48.Extension Not Detrimental to Health & Safety.No Urgent Considerations Mandate Use of App R Requirements Project stage: Other ML19350B9621981-03-18018 March 1981 Submits Plans & Schedules for Sections III-G,III-J & III-O of App R to Fire Protection Requirements Project stage: Other ML19347D5481981-03-18018 March 1981 Forwards 810318 Request for Exemption from App R&10CFR50.48 Schedule Requirements Re Fire Protection Per 10CFR50.12(a) Project stage: Request ML20033D0921981-12-0101 December 1981 Requests Exemption from 10CFR50.48 Schedule Requirements Project stage: Other ML20033C7831981-12-0101 December 1981 Requests Extension of Submittal & Implementation Schedule Dates for Newly Enacted Fire Protection Regulations in 10CFR50.48,per 10CFR50.12.Scheduled Extension Relates to Mods Which May Be Required to Satisfy Section Iii.G Project stage: Other ML20033C7851981-12-0101 December 1981 Forwards Update on Status of Fire Protection App R Sections III-G,III-J & III-O Requirements.Installation of Emergency Lighting Completed W/Exception of Control Room.Control Room Lighting Will Be Installed During Jan 1982 Refueling Outage Project stage: Other ML20040C3451982-01-20020 January 1982 Forwards Update Re Status for Sections III-G,III-J & III-O of App R,Fire Protection Project stage: Other ML20040D9511982-01-20020 January 1982 Requests Extension of Schedule Dates in Paragraph (C) of Fire Protection Regulations in 10CFR50.48,per 10CFR50.12 Project stage: Other ML20040D9461982-01-20020 January 1982 Forwards to HR Denton Requesting Exemption from Scheduler Requirements of 10CFR50.48,per 10CFR50.12(a) Project stage: Other ML20051T6321982-05-0404 May 1982 Exemption from 10CFR50.48(c) Fire Protection Schedular Requirements.No Significant Environ Impact Will Result from License Amend.Clarification of Generic Ltr 81-12 & Criteria for Evaluating Exemption Requests Encl Project stage: Approval ML20054K1301982-06-30030 June 1982 Forwards Fire Protection App R Review,Per 10CFR50.48(c)(5) Requirements & Generic Ltr 81-12.App R Objective of Assuring Safe Shutdown Capability in Event of Fire Can Be Met W/O Full Compliance W/Each Provision of App R Project stage: Other ML20065Q1141982-10-22022 October 1982 Forwards Supplemental Info Per 821014 Discussion Clarifying Exemptions Previously Documented in Fire Protection App R Review,Section 11.2, Reactor Containment & Section 11.6, Primary Auxiliary Bldg Project stage: Supplement ML20065T0471982-10-28028 October 1982 Forwards Description of Alternate Shutdown Procedures Which Will Be Revised Per 821014 Discussions.Procedures to Be Completed After NRC Review of App R & Receipt of Safety Evaluation Project stage: Other ML20079H9221982-12-10010 December 1982 Summarizes 821130 Meeting W/Nrc & Documents Understanding Mutually Agreed Upon Re App R Fire Protection Rule.Finalized Responses to 821118 Questions Encl Project stage: Meeting ML20028C6781983-01-0505 January 1983 SER Re App R to 10CFR50,Items Iii.G & Iii.L.Facility Complies W/Requirement to Provide Alternative Safe Shutdown Capability Contingent Upon Granting of Exemption to 72 H Cold Shutdown Requirement Project stage: Other ML20028C6741983-01-0505 January 1983 Advises That Facility Complies W/Requirements of Sections III.G.3 & Iii.L of App R to 10CFR50 Contingent Upon Granting of Exemption to 72 H Cold Shutdown Requirement.Ser Encl Project stage: Other ML20072H0721983-03-14014 March 1983 Exemption from Requirements of App R to 10CFR50 Re Fire Protection Project stage: Approval ML20072H0891983-03-14014 March 1983 Notice of Exemption from App R to 10CFR50 Re Fire Protection Requirements Project stage: Approval 1980-10-30
[Table View] |
Text
-
... o
'Af M
om essooo EM.7 March 18, 1981 15219
^
m t'
/,,
Director of Nuclear Reactor Regulation
[
9 United States Nuclear Regulatory Commission
- 4. lA,)
Attn:
Mr. Steven A. Varga, Chief t
a p
"f 2 31987 m Operating Reactors Branch No. 1 Division of Licensing I " **'
Washington, DC 20555 4
N
,e
Reference:
Paaver Valley Power Station, Unit No. 1 N < " ; --. '
Docket No. 50-334, License No. DPR-66
' *
- l JI b Fire Protection - Appendix R Requirements Gentlemen:
In accordance with your letter of November 24, 1980 and the require-ments of 10 CFR 50.48.C.5, we are providing the plans and schedules for Sections III-G, III-J and III-0 of Appendix R.
III-G Fire Protection of Safe Shutdow.4 Capability:
We are unable to provide the plans and schedules for this item as required. We have filed for an exempticn to the requirements of 10 CFR 50.48.C.5 under a separate letter dated March 18, 1981 to Mr. H. R. Denton, Director of Nuclear Reactor P.egulation.
III-J Emergency Lighting:
We are planning to provide lighting in accordance with the requirements of this paragraph. The lighting that can be installed without a plant shutdown will be installed by November 17, 1981.
Some lighting may be necessary for areas in the reactor containment which will require a plant shutdown for installation. These modi-fications will be completed at the next refueling outage in accord-ance with 10 CFR 50.48.C.3.
III-0 Oil Collection Systems for Reactor Coolant Pump:
We will provide an oil collection system for the reactor coolant pumps capable of withstanding a seismic event in accordance with Section O.
The system will require a plant shutdown for installation and, in accordance with the provisions of 10 CFR g
50.48.C.3, will be installed at the next refueling outage.
8103240500
c.-
Beaver Valley Power Station, Unit No. 1 1 Docket No. 50-334,. License No. DPR-66 Fire Protection - Appendix R Requirements Page 2 If you have any questions concerning this response, please cor. tact my office.
Very truly yours, OS/A C. N. Dunn Vice President, Operations cc:
.D. A.'Beckman, Resident Inspector U.S. Nuclear Regulatory Commission
' Beaver Valley. Power Station Shippingport,-PA 15001-U.S. Nuclear Regulatory Commission
.c/o Document Management Branch
. Washington, DC. 20555 t
5 4'
$ >" ')
T
?
mA