LER 80-005/03L-0:on 800417,during Normal Operation,Review of Security Logs Revealed That Designated Fire Brigade Was Below Min Supervision Requirements on Three Occasions.Caused by Operations Personnel Designation Error
ML19310A373
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 06/02/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19310A368 List:
References
LER-80-005-03L, LER-80-5-3L, NUDOCS 8006110161
Download: ML19310A373 (2)


Text

- _ . - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ - - - - - _ _ - _

,ess s unan sne U. S. NUCLEAR CEGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT C6NTROL SLOCK: l l l ] l l lh (PLEASE PRINT C"A TYPE ALL REQUIRED INFO"MATIINI 6

~

l 7

o i 8 9 I w l LtCENsEE I l P lCOoE B lH l 1 l@l14 15 010 l- 10 l 0l 0 l010 l -l 0125Ol@l uCENsE NUMSER 26 4UCENSE l 1l llTYPE ll 1l@l JO l

57 CAT 64 l@

con T -.

1 E

7 8 7RCI 60l L l@l68 0 l 510 l 01 Ol 2161688 @l69 0 l 4 l 1l 7l 810 ]@l75 0l6REPORT 74 10 l oATE2 l 8 l080l@

oOCKET NuMSER EVENT oATE EVE 47 OESCRIPTION AND PROBABLE CONSEQUENCES h

o 2 l On 4-17-80 during normal operation, a review of the security logs I o a i revealed that on three occasions since 02-11-80 the designated fire I o 4 l brigade was below the minimum manning requirements. A Tech. Spec. I io isl l change ef fective on 2-11-80 raised the minimum number of brigade membersi.

o e I For approx. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> on the following three days, 3-14-80, 3-22-80, and I g o l 7 l l 4-13-80 there were only four designated fire brigade members. This is I g l in violation of Technical Specification 15.6 2.2.f.  !

SEE *^E Co sNCEE CoMposENT CooE sues"o'o'E sS$oE lo m 7 8 9 121 zlO 10 LA_l@ LAJ@ I z13 i z i z i z i z i z lO Lz_J@

Il 12 18 19 LZJ 20

@ i

,,, sEcuENTiAL OCCURRENCE REPORT Revision '

LER EVENT YEAR REPORT NO. COoE TYPE No.

@,ag'RO

_ 21 1810l 22 l--J 23 10 10151 24 26 LJ 27 10131 N M LL_J 30 I-I 31 LOJ 32 YA#" 'XTYs o!UST 57EWao*" wouRs @ ^s"#iTTE' ,#0ide. "Tu"At?#- MfN"ifMu"REa LH_j@[H_j@ [zj@

33 34 35

[zj@

36 l0101010I 3'

LIJ@

41 Luj@ LsJ@ l44z 19191947l@

40 42 43 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h i o l The event was caused by Operations personnel failing to designate I y l another fire brigade member when notified by the quard force that thev I

, , Iwere unable to supply a fire brigade member. The quard force normally 1

, 3 l supplies one of the five members. All Operations personnel have been  !

, . l reinstructed to insure proper designation and documentation of the on- I 7 s 9 site tire brigade. so

'sYAE scowER oTwtRsTATus @ "'sEoN8v' oiscovERv oEsCRirTioN @

i s W@ l 0 l 7 l 8 l@l "N/A l l B l@l Review of station logs l

' dTiviTy Co'0 TENT " ** "

AMOUNT OF ACTIVITY LOCATION OF RELEASE i 6 [Z j p;ELEAsE@o oF RELEASE @l N/A l l N/A l

  1. *
  • _PERSONNEL '

ExposuAEs NuMeE R TYRE oEsCRiprioN @

i 7 l01010 l@Lzj@l n/A - I PERscNNEL im;u7its NuMeER oEsCRirTioN@

i a I 7 8 9 l 0 l 0 l 0 l@l12N/Att 30 l

L OF om oAM G TO PActLITY *\a l i 9 [zj@l N/A ~^

30 7 8 9 to  :

PueLiCtTV NRC USE ONLY l 2 o LN,j tssuto@loEsCRiPTION N/A l llllIllIllIlli l 7 8 9 10 68 69 80 5 l 0 '

NAME OF PREPARER C. W. Fav PHONE: 41 d /9 77-9 R11 g 8 0 0 6 1 1:0 /f / , - ~ ~ ~ ~ '~ ~~ ~

j

ATTACHMENT TO LICENSEE EVENT REPORT NO. 80-005/03L-0

  • Wisconsin Electric Power Company Point Beach Nuclear Plant Unit 1 Docket No. 50-266 On April 17, 1980 during normal operation, a review of the site security logs revealed that on three occasions since February 11 the on-site fire brigade was below the minimum manning requirements. A Technical Specification change effective on February 11 raised the minimum number of fire brigade members frca four to five. For approximately eight hours on the following three days, March 14, 22, and April 13, there were only four designated fire brigade members. Although several qualified fire brigade members were on site and in the plant at the time, the failure to designate one such individual specifically for this purpose may be a violation of Technical Specification 15.6.2.2.f.

All three events occurred on day shift and all fell within a time period where there were more than the minimum number of qualified fire brigade members on site.

The event was caused by Operations personnel failing to designate another fire brigade member when notified by the guard force that they were unable to supply a fire brigade member. The guard force normally supplies one of the five fire brigade members. All Operations personnel have been reinstructed to insure proper designation and document of the.on-site fire brigade to prevent future occurrences.