LER 80-006/03L-0:on 800417,during Analysis of as-built safety-related Piping Sys Per IE Bulletin 79-14,overstressed Condition Discovered in Cooling Sys Piping.Caused by Lack of Support Between Valves Upstream of Juncture
ML19305E821
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19305E818 List:
References
IEB-79-14, LER-80-006-03L, LER-80-6-3L, NUDOCS 8005200474
Download: ML19305E821 (1)


Text

-

N 7.C F OR M 366 U. S. NUCLE AR REGULATORY COMMISSION LICENSEE EVENT REPORT 8 0052 00 g h CONTROL BLOCK: l l

l l l l l 6

lh (PLEASE PR8NT OR TYPE ALL REQUIRED INFORMATION)

$8l@

l0 lil8l 9Wl Il LICENSEE P

P l B CODE l Hl 1 l@l 14 0 l 0 l - l 0 l LICENSE 16 0 l 0 NUM8ER l 0 l 0 l- l 0 l 0 l@l JS 4 l 1LICENSE 26 l 1 l 1TYPE l 1JOl@l$7 CAT l CON'T 10111 7 8 S$R$lLl@l0l5l0l0l0l2l6l6 @l0l4l1l7l8l0l@lJl5l0l5l8l0l@

60 61 DOCK ET NUMBER 68 63 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l0l2] l During seismic analysis of as-built safety related pioina systems in 1

[O l3 i l accordance with IEB 79-14, an overstressed condition in the comoonent l l0 l4 l l cooling system piping was discovered. The hiah stress area was at a l l0 is j l stub end weld which joined the discharge of the two pumps . This iunc- l 1016] I ture has a very large stress inf3pi fication factor which resulted in al 1017l l safe shutdown earthquake condition stress of 45,900 osi. This is l l O la l i greater than the allowable of 27,000 psi but less than the tensile of I ODE CODE S SCO E COMPONENT CODE SU8 CODE SU E B 191 9 9 lW l B l@ W@ l A l@ l P l Il P l E l X l Xl@ l Dl@ l_Z_j @

1 to 18 12 13 18 19 20

,,, SEQUENTI AL OCCUR R Ei4CE REPORT REVfSION LER RO EVENTYEAR REPOR T NO. CODE TYPE NO.

@ , age; 18 l 01 l-l 23 101016 l l-l l0 l3 l lL l l_l [0 J

_ 21 22 24 26 27 28 29 J0 31 32 TA EN A TION ON PLANT V T HOURS SS IT FOR 4 8. SUP LIE MANUFACTURER l3JF lgl34Z lg [36Zl@ l36Zi@

l0l0l0l01 31 40 W@ lNl@

el 42

[,A_J@

43 l44B l l l 3 l 047l@

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l i l o l l A piping support was added between two valves inst uostream of the l li li j l juncture within a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> period af ter discoverv. This supoort reducedI

,si,, l the safe shutdown earthquake stresses to an acceptable value. All I

[t l 3 g l other stresses are also acceptable. This discoverv is reportable oer i g,i4i l the requirements of IEB 79-14 and in accordance with T.S. 15.6.9.2.B.2.1 7 8 9 80 8

STA S 6 POWER OTHER STATUS IS O RY DISCOVERY DESCRIPTION li i s l W@ l 0 [ 7 l9 l@l N/A l l C l@lIE Bulletin 79-14 Inspection l ACTivtTY CO TENT RE u ASEo 0,RELEiSE AMOUNT O, ACT,viTv @l LOCATION OF RELEASE @

L'16J l Z l @ 10l Zl@l N/A l N/A l T 8 9 is 44 45 80

  1. ERSONNEL EXPOSURES NUM8ER TYPE DESCRIPTION y l 0 l 0 l 0 l@l Z l@l N/A i l

PERSO~~ E'L i~;uLS NUMBER oESCRiPTiON@

1 R 8 9 l 0 l 0 l 0 l@l12 N/A l 7 11 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION lil91[.Z_J@lN/A 7 8 9 to l

80 PU8LiciTY NRC USE ONLY

  • tSSUED ,

y l N j@ DESCRIPTION l N/A l lllllllllllllI F 8 9 10 68 69 80 3 NAME OF PREPARER C. W. Fay PHONE:

41 U2 m 2M 1 {