LER 78-071/03L-0 on 781224:failure of Sample Pump for Radiation Monitor RMA-6.Caused by Worn & Distorted Carbon Vanes in Pump
ML19274D447
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/15/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19274D444 List:
References
LER-78-071-03L, LER-78-71-3L, NUDOCS 7901240139
Download: ML19274D447 (2)


Text

__ _ - - -

4 t

NRC PORM 364 U. S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT EXHIBIT A l

CONTROL SLOCK: j l l l l I (PLEASE PRINT oR TYPE ALL REQUIRED INFORMATIONI t .th I o i lFI Li Q R) Pt3lgl0 .. u 10l-meau. t 0l0l0l0l0l-l0;0lgl4y11l

-..m a :. oc.u.

9 g j 1 gg;_ l _ ;

a e e r ,.

, .. ucasu coa. T,..

CcN*T .

o i " m; LLj@l 0 l Si o l -10 l 3l01 2 qe 11 6. 69 2 EV; 2l4 I 7 l 8i@l 011mE'CmT ENT Q4Tg 7. 75 l 115l QA tt 7 l 980l@

7 8 W .I COCEET Nyvsta EVENT DESCRIPTICN ANO PRCSASLE CONSECLENCES

, At 1300 the cample pump for Rad tiori Mo0itor RMA-6 f ailed, rendering ,

o a Ithe containment atmospheric Iodine and caseous radioactivity monitoring I ,

ITiT1 I system inoperable. This is contrarv to Technical Specification 3.4.6.1. I o 33 ,No effects c public health and safety as a redundant monitoring system ,

o. ;was available and operable. Maintenance restored operability in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. ,

,,, ,Four previous occurrences reported, one previously reported pump failure. ,

I ai4 t SEcE 'c^c'e's' susYeYs coveomawrecce ' sLsSEca sSEEe o ,

l Bl B l@ W@ W@ l PlUl MlP l Xl XI@

9 10 11 12 12 15 Id

]@ @ @ 20 stC1.:tN TI AL OCCU48ENCE mtpont mEvss!O4

_EvfMTvtam mE*CmT No. Oct t go

@ ;de <g; no 71 81 8 u

10 l 7 ; 11 g

21 i i 31 a a yao g

2, g

2 2 2: 2 E's AC CN P NT v7 0 ,eovas sei F0m t sy LE MAN sac agm IAJ@L.B@

u a l nZJ@ LZJ u O a I oIo I oI of.aL.,YJ @ L,Njg y@ lT l 3 l 0l 0 lg

. 2 ,, .,

CAcSE uESCRiertoN ANo CcRREC nVE ACTICNS @

lThe cause of this event is due to a failed sample pump. The carbon vanes ,

o

,had worn and distorted causing the pump to overheat and trip. No correcti3e action required as normal maintenance restored operabilic'r. An engineering

,,, study is underway to evaluate pump failuret . ,

, 4 1 1

, 8 9 90

$T  %*Onta QTwtm sT&TUS is av  : meet CM servat i s J@ l 0 l 9l9 lgl NA l [Ajgl Operator odcovtav CEYon :

aa l

'2 '2

' c'T u r, c bis?

i neuer .vw : .cT,ur, @ " tacificso,meu.s.@

t 6 acuisi@o

[, Zj  :.e[,Z,,J@lNA l l NA l 7 . , ,2 ,, ..

Ptm50%5L En*0$Lats NuwSEm TvFf O t s:m' PT'C4 NA l l Ol 010l@LZ_l@l i

.tp

' ,<.:.3.asel'.w'ies c.s:n.. .cs@

NA l

. i -, J ,o i 0l@l

, i, i:

g,o. cm,c,4yjr;o sacwT g i = NA l

, . G.@) ,2 .o

  • E 'l#

, Ogs;m stics a NA , , , ,,,,,i,, , ,

. d, @l ,2 o .. .2 sA. E C= nmEPARER J. N ~ ,- m-esE _.(904)795-6486 (SEE AACHED SUPPLEMENTARY INFORMATION SHEET)

~

7 901 b 4 0133

. SUPPLEMENTARY INFORMATION

1. Report No.: 50-302/ 78-071/03L-0
2. Facility
  • Crystal River Unit #3
3. Report Date: 15 January 1979
4. Occurrence Date: 24 December 1978
5. Identification of Occurrence:

Inoperability of two of three reactor coolant systems leakage detection systems contrary to Technical Specification 3.4.6.1.

6. Conditions Prior to Occurrence:

Mode 1 power operation (99%).

7. Description of Occurrence:

At 1300 the sample pump for Radiation Monitor RMA-6 failed, rendering the Conta.1-ment atmospheric Iodine and gaseous radioactivity monitoring system inoperable.

The six hour action statement was entered and Work Request 4258 was initiated.

The sample pump was removed and replaced with a spare pump. Radiation Monitor RMA-6 was returned to service and declared operable at 1500, ending the six hour actica statement.

8. Designation of Apparent Cause:

The cause of this event is attributed to the failure of the RMA-6 sample pump.

The carbon vanes had worn and distorted causing the pump to overheat and trip.

9. Analysis of Occurrence:

There was no safety hazard to the plant or general public as redundant monitor-ing system was available.

10. Corrective Action:

No corrective action, as normal maintenance restored operability of the pump.

An engineering study is underway to evaluate RMA-6 pump failures. Results of this evaluation will determine any additional corrective action.

11. Failure Data: -

Four previously reported occurrences, but only one previously reported RMA-6 pump failure.

++.

/rc