Letter Sequence Request |
|---|
EPID:L-2018-RNW-0023, Regarding Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML18297A045, ML18319A184, ML18319A252, ML18320A236, ML18340A266, ML18340A267, ML18345A244, ML18351A051, ML19015A243, ML19044A556, ML19044A659, ML19046A433, ML19098A810, ML19100A254, ML19106A416, ML19107A021, ML19128A079, ML19140A449, ML19169A329, ML19206A651, ML19248C228, ML19253C753, ML19270E741, ML19316A834, ML19360A020, NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent
|
MONTHYEARML18121A0342018-03-29029 March 2018 Possible Topics for the April 17, 2018 Public Meeting with Dominion on Its Surry SLRA Project stage: Request ML18102A5692018-04-17017 April 2018 Dominions Presentation on Surrys SLRA Safety Meeting-Final (for April 17, 2018) Project stage: Request ML18129A3142018-05-16016 May 2018 Summary of Pre-Application Meeting with Dominion Energy Regarding the Surry, Units 1 and 2, Subsequent License Renewal Application Project stage: Meeting ML18291A8362018-06-30030 June 2018 Enclosure 4, Attachment 1: ANP-3679NP, Revision 0, Topical Report Project stage: Request ML18291A8342018-10-15015 October 2018 Appendix E - Environmental Report Project stage: Request ML18291A8352018-10-15015 October 2018 Submittal of Application for Subsequent Renewed Operating Licenses Project stage: Request ML18297A0932018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) Project stage: Request ML18297A0452018-10-26026 October 2018 Receipt and Availability of the Subsequent License Renewal Application for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18319A2522018-11-16016 November 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18319A1842018-11-26026 November 2018 Plan for the Operating Experience Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RWN-0023 and L-2018-RNW-0024 Project stage: Other ML18320A2352018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing FRN - v2 Project stage: Request ML18320A2362018-12-0303 December 2018 Acceptance Scheduling and Opportunity for Hearing Letter - v3 Project stage: Other 05000280/LER-2018-002, Regarding Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator2018-12-10010 December 2018 Regarding Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator Project stage: Request NRC-2018-0247, Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent2018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Company'S Application for Subsequent Lice Project stage: Other ML18345A2442018-12-12012 December 2018 Federal Register Notice - Surry Power Station, Unit Nos. 1 and 2 - Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Companys Application for Subsequent Licen Project stage: Other ML18340A2652018-12-17017 December 2018, 21 December 2018 Notice of Intent to Prepare an Enviromental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML18340A2672018-12-17017 December 2018 Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML18351A0512018-12-18018 December 2018 Correction and Extension of Date to Request a Hearing and Petition for Leave to Intervene Regarding the Virginia Electric and Power Companys Application for Subsequent License Renewal Project stage: Other ML19046A0092018-12-20020 December 2018 Comment (10) from Bettina Rayfield on Surry Power Station, Unit Nos. 1 and 2 Relicensing Project stage: Request ML18351A2572018-12-20020 December 2018 U.S. Nuclear Regulatory Commission Approval of Virginia Electric and Power Companys Request for Withholding Information from Public Disclosure, Regarding the Application for Subsequent License Renewal of Surry Power Station, Unit Nos. 1 and Project stage: Withholding Request Acceptance ML18340A2662018-12-21021 December 2018 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Surry Power Station, Unit Nos. 1 and 2 Project stage: Other ML19024A1992019-01-0808 January 2019 Subsequent License Renewal Scoping Meeting Surry Power Station Units 1 and 2 Project stage: Meeting ML19016A0932019-01-12012 January 2019 Comment (1) of Erica Gray on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1542019-01-13013 January 2019 Comment (9) of W. Frank Adams on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0962019-01-14014 January 2019 Comment (3) of Kay Patrick on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19016A0942019-01-14014 January 2019 Comment (2) of Scott Burger on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19017A0132019-01-16016 January 2019 Comment (4) of Anonymous Individual on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Units 1 and 2 Project stage: Request ML19025A1462019-01-20020 January 2019 Comment (5) of David Martin on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1492019-01-21021 January 2019 Comment (6) of Glen Besa on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19015A2432019-01-22022 January 2019 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19025A1502019-01-22022 January 2019 Comment (7) of Scott Price on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19025A1522019-01-22022 January 2019 Comment (8) of Randal Owen on Virginia Electric and Power Company; Dominion Energy Virginia: Surry Power Station, Unit Nos. 1 and 2 Project stage: Request ML19042A1372019-01-29029 January 2019 Submittal of Supplement to Subsequent License Renewal Operating Licenses Application for Sufficiency Review Change Notice 1 Project stage: Supplement NRC-2018-0280, Comment (11) of Amy Ewing on Surry Relicensing, Scoping Comments: NRC-2018-0280 (Esslog 38468)2019-02-14014 February 2019 Comment (11) of Amy Ewing on Surry Relicensing, Scoping Comments: NRC-2018-0280 (Esslog 38468) Project stage: Request ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19044A6592019-03-0404 March 2019 License Renewal Severe Accident Mitigation Alternatives Audit Plan Regarding the Surry Power Station, Unit Nos. 1 and 2, Subsequent License Renewal Application Project stage: Other ML19044A5562019-03-0404 March 2019 License Renewal Environmental Site Audit Plan Regarding the Surry Power Station, Units 1 and 2, Subsequent License Renewal Application Project stage: Other ML19095A5972019-04-0202 April 2019 Submittal of Supplement to Subsequent License Renewal Application Change Notice 2 Project stage: Supplement ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement Project stage: Request ML19095A6022019-04-0202 April 2019 Enclosure 2 - SLRA Mark-Ups Change Notice 2 Project stage: Request ML19114A4352019-04-11011 April 2019 RAIs 4-4-19 r3 Project stage: RAI ML19106A4022019-04-11011 April 2019 Request for Additional Information Set 1 - Surry SLRA Environmental Review Project stage: RAI ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet Project stage: Request ML19107A0192019-04-16016 April 2019, 29 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Request ML19098A8102019-04-17017 April 2019 On-Site Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML19106A4162019-04-25025 April 2019 Summary of the Subsequent License Renewal Severe Accident Mitigation Alternatives Audit Project stage: Other ML19100A2542019-04-29029 April 2019 Schedule Revision for the Subsequent License Renewal Application Review Project stage: Other ML19107A0212019-04-29029 April 2019 Summary of the Subsequent License Renewal Environmental Audit Project stage: Other ML19148A4412019-05-10010 May 2019 Response to Requests for Additional Information Set 1 - Regarding Environmental Review Project stage: Request ML19128A0792019-05-30030 May 2019 Report for the in Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024 Project stage: Other 2019-01-13
[Table View] |
Similar Documents at Surry |
|---|
|
text
OEC 1 0 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001
Dear Sir or Madam:
10CFR50.73 Virginia Electric and Power Company Surry Power Station 5570 Hog Island Road Surry, Virginia 23883 Serial No.:
18-421 SPS:
TSC Docket No.: 50-280 License No.: DPR-32 Pursuant to 10CFR50.73, Virginia Electric and Power Company hereby submits the following Licensee Event Report applicable to Surry Power Station Unit 1.
Report No. 50-280 / 2018-002-00 This report has been reviewed by the Station Facility Safety Review Committee and will be forwarded to the Management Safety Review Committee.
Enclosure Commitment contained in this letter: None Very truly yours, F. Mladen Site Vice President Surry Power Station cc:
U.S. Nuclear Regulatory Commission, Region II Marquis One Tower, Suite 1200 245 Peachtree Center Ave., NE Atlanta, GA 30303-1257 NRC Senior Resident Inspector Surry Power Station
NRC. FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0104 EXPIRES: 03/31/2020 (04-2017) httg://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3D the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 3. PAGE Surry Power Station, Unit 1 05000 280 1 OF 3
- 4. TITLE Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED I
SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR MONTH DAY YEAR Surry Power Station, Unit 2
- - NUMBER NO.
05000 281 002 FACILITY NAME
. DOCKET NUMBER 10 11 2018 2018 -
00 12 10 2018 05000
- 9. OPERATING.MODE
- 11. THIS REPORT IS ~UBMITTED _PURSUANT TO THE REQUIREMENTS OF 10 Ci=R §: (Check ail that apply)
CJ 20.220~_(~)(3)(i)
D 50.73(a)(2)(viii)(A) -.
. D 50.73(a)(2)(ii)(B)
D 50.73(a)(2)(viii)(B)
N D 20.2203(a)(1>
D 20.2203(a)<4) _
D 50.13(a>(2>cm>
D 50.73(a)(2)(ix)(A).
D 20.2203(a)(2)
D 50.36(c)(1)(i)(A)
[l] 50.73(~)(?)(iv)(A)_
D 50.73(a)(2)(x):
- 19. POWER L,EVEL
~-... D _20.2203(a)c2)~ii) o* 50.36(f:)(1)(ii)(A)
D 73.11(a)(4)
. D 20.220:3(~)(2)(iii).
D 50.36(c)(2)
. D 50.7,3(a)(2)(v)(B).
_ < D.13.11(a>cs>
_ D 20:22~3(a)(2)(iv) *.
D 5o.46(a><3>(ii)
D ~3.11ca)c1) -
~00
. D 20.2203(a)(2)(v) -
.. D 50.73(a)(2)(i)(A)..
D 50:73(a)(2)(v)(D).
D 13.77(a)(2)(i)
_ D 20.?203~a)(~)(vi).
D 50.73(a)(2)(i)(B)
Q ~0.73(a)(2)(vii) o 73.77(a)(2)(ii)
,D 50-73(a)(2)(i)(C)
OoTHER.. Specify in -'.'bstract b~low Of in,
4.0 IMMEDIATE CORRECTIVE ACTIONS
YEAR 2018
- SEQUENTIAL NUMBER 002 REV NO.
00 Roof repairs were made by removing the damaged liner, replacing the insulation sheets, and installing a new EPDM (ethylene propylene diene n:ionomer) roof membrane liners with new anchoring strips and fasteners. New parapet wall flashing was seamed onto new EPDM liner.
5.0 ADDITIONAL CORRECTIVE ACTIONS
Additional periodic inspections will be performed on the turbine building roof until long term corrective actions are completed.
6.0 ACTIONS TO PREVENT RECURRENCE Long term actions recommended by the ca.u_s~ evaluation will be implemented by the corrective action program.
t
7.0 SIMILAR EVENTS
LER 2013-001-00, Bird Contacting Power Lines Results in Emergency Diesel Generator Auto-Start LER 2006-002-00, Spurious Actuation Results in Unit 2 Trip and Loss of Offsite Power 8.0 MANUFACTURER/MODEL NUMBER D831 Dow Corning (J.P. Stevens) Hypalon roofing
9.0 ADDITIONAL INFORMATION
Unit 2 remained at 100 percent power during this event. While #3 EDG was loaded on the 1 J 4160 V emergency bus, Technical Specification (TS) action statements associated with Unit 2 emergency electrical systems were reviewed, and associated TS clocks were entered. The event did not cause any additional reportable condition. All Unit 2 TS action statements associated with Unit 2 emergency electrical systems were exited when the #3 EDG was returned to normal alignment at 22:05 hours on 10/12/2018.
There were no other structures, systems, or components that were inoperable at the start of the event that contributed to the event. Page 3
of 3
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000280/LER-2018-001, Loss of 4160 Volt Emergency Bus and Start of Emergency Diesel Generator Due to Opening Emergency Bus Potential Transformer Drawer | Loss of 4160 Volt Emergency Bus and Start of Emergency Diesel Generator Due to Opening Emergency Bus Potential Transformer Drawer | 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) | | 05000280/LER-2018-002, Regarding Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator | Regarding Windblown Debris Caused Transformer Fault Resulting in Auto-Start of Emergency Diesel Generator | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) | | 05000280/LER-2018-003, Regarding Auto-Start of Emergency Diesel Generators Due to Pilot Wire Lockout on C Reserve Station Service Transformer | Regarding Auto-Start of Emergency Diesel Generators Due to Pilot Wire Lockout on C Reserve Station Service Transformer | 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(ix)(A), Prevented Safety Function in Multiple System 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
|