Letter: Surry Power Station Unit Nos 1 and 2 - Safety Evaluation Report for the Subsequent License Renewal Application Review
ML19353C658
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/27/2019
From: Anna Bradford
NRC/NRR/DNRL
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Wu A, NRR-DNRL 415-2995
Shared Package
ML19353C656 List:
References
EPID L-2018-RNW-0023, L-2018-RNW-0024
Download: ML19353C658 (3)


Text

December 27, 2019 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 29060

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2 - SAFETY EVALUATION REPORT FOR THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)

Dear Mr. Stoddard:

By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), as supplemented by letters dated January 29, 2019 (ADAMS Accession No. ML19042A137), April 2, 2019 (ADAMS Accession No. ML19095A666), June 10, 2019 (ADAMS Accession No. ML19168A028), October 14, 2019 (ADAMS Accession No. ML19294A044), October 31, 2019 (ADAMS Accession No. ML19310E716), and November 19, 2019 (ADAMS Accession No. ML19329A287), Virginia Electric and Power Company (Dominion or the applicant) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2 (Surry).

Dominion submitted the application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for subsequent license renewal.

The NRC staff determined that the application was complete and acceptable for docketing on December 3, 2018 (ADAMS Accession No. ML18320A188), as corrected by letter dated December 18, 2018 (ADAMS Accession No. ML18351A050).

The NRC staff has reviewed the Surry, Unit Nos. 1 and 2, Subsequent License Renewal Application (SLRA) and has developed the enclosed Safety Evaluation Report Related to the Subsequent License Renewal of Surry Power Station, Units 1 and 2, hereinafter referred to as the Safety Evaluation Report (SER). This SER reflects the status of the NRC staffs safety review of the SLRA, as supplemented, through November 19, 2019. Issuance of the enclosed SER is an important milestone for both the applicant and the NRC staff.

The next milestone for this project is the Advisory Committee on Reactor Safeguards Subcommittee meeting scheduled for February 5, 2020. The final SER is scheduled to be issued in June 2020.

D. Stoddard 2

If you have any questions regarding this matter, please contact the license renewal project managers, Angela Wu, at 301-415-2995 or Angela.Wu@nrc.gov, and Lauren Gibson, at 301-415-1056 or Lauren.Gibson@nrc.gov.

Sincerely, Meena K. Khanna for

/RA/

Anna H. Bradford, Director Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281

Enclosure:

As stated cc w/o encl: Listserv

PKG: ML19353C656 LTR: ML19353C658 SER: ML19360A020

  • via email NRR-106 OFFICE DNLR/NLRP: PM DNLR/NLRP: PM DNLR/NLRP: LA DNLR/NLRP: BC NLO/OGC NAME AWu LGibson SLent EOesterle*

Roth/Gamin*

DATE 12/19/19 12/19/19 12/19/19 12/19/19 12/19/19 OFFICE DEX: DD DSS: D DRA: D DNLR: D NAME EBenner* JMarshall for JDonoghue*

MFranovich JMarshall for ABradford MKhanna for DATE 12/27/19 12/23/19 12/26/2019 12/27/2019