Provides Core Shroud Insp Scope & Schedule for SSES Unit 2 in Response to Requirements of GL 94-03 & as Committed to in Util 941219 Ltr
ML18030A088
Person / Time
Site: Susquehanna, North Anna  Dominion icon.png
Issue date: 05/22/1995
From: Byram R
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-94-03, GL-94-3, PLA-4317, NUDOCS 9505300226
Download: ML18030A088 (8)


Text

RIORITY CCELERATED RIDS Pl(OCESSliG) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9505300226 DOC.DATE: 95/05/22 NOTARIZED: YES DOCKET FACIL:50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION BYRAM,R.G. Pennsylvania Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION P

~

Document Control Branch (Document Control Desk)

SUBJECT:

Provides core shroud insp scope 6 schedule for SSES Unit 2 R in response to requirements of GL 94-03 E as committed to in util 941219 ltr. I DISTRIBUTION CODE: A018D g

COPIES RECEIVED:LTR

' Q ENCL L g SIZE:

0 NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PM' 1 1 PM/CARPENTERPG ~ 1 1 INTERNA . &3m 01 1 1 NRR/DE/EMCB 1 1 NRR/DE/EMEB 1 1 NRR/DOPS/OECB 1 1 NRR/DSSA/SRXB 1 1 EXTERNAL: NRC PDR 1 1 D

C U

VOTE TO ALL"RIDS" RECIPIENT'TS:

PLEASE HELP US TO REDUCE iVKSTE! CONTACT TIIE DOCL'ifEYTCOA'TROL DESk, ROO!1f Pl-37 (EXT. 504-0033 ) TO ELIMINATEYOl'R iAifi DISTRIBUTIOY LIS'I'S I'OR DOCL'8 I Ei'I'S YOL'OY"I'!TED!

P!IOif TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8

Pennsylvania Power & Light Company Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 610/774-5151 Robert G. Byram Senior Vice President Nuclear 610/774-7502 Fax: 610/774-5019 MAY 22 1995 Nuclear Regulatory Commission

'.S.

Attn.: Document Control Desk Mail Station P 1-136 Washington, DC 20555 SUSQUEHANNA STEAM E<LECTRIC STATION UNIT 2 7TH REFUEL AND INSPECTION OUTAGE CORE< SHROUD INSPECTION SCOPE AND SCHEDULE Docket No. 50-388

Reference:

1) PLA-4233 from Mr. RG. Byram to USNRC, "Inlerim Response to Generic Lelter 94-03, "dated December 19, 1995.
2) USNRC Letter porn Mr. C. Poslusny to Mr. RG. Byrarn, Generic Letter 94-03, Generic Letter 94-03, "Intergranular Stress Corrosion Cracking of Core Shrouds in BP'Rs," Pennsylvania Power and Light Company, Susquehanna Steam Electric Station, Units 1 and 2 (TAC ¹s. M90112 and M90113) dated March 23, 1995.

This letter provides PPEcL's core shroud inspection scope and schedule for Susquehanna Steam Electric Station (SSES) Unit 2 in response to the requirements of Generic Letter 94-03 and as committed to in the referenced PLA-4233.

PPEcL commits to perform the scope of inspections as defined in the BWR Core Shroud Inspection and Flaw Evaluation Guidelines prepared by General Electric Nuclear Energy for the BWROG Vessel Internals Inspection Project, GENE-523-113-0S94 for Category B plants. For SSES Unit 2, this inspection will consist of ultrasonic inspection of all accessible areas of welds H3, H4, H5, H6B, and H7. The inspections will be conducted during the Unit 2-7th Refueling and Inspection Outage scheduled to begin in September, 1995.

In the case where no significant cracking (defined as greater than 10% of the weld length) is found in any of the above five welds, PP&L will scan the remaining three welds (H1, H2, and H6A) as permitted by the outage schedule. In the case where significant cracking is found, the 9505300226 950522, PDR ADOCK;,<05000338

'PDR

.. P, ~

P1$

FILE R41-2 PLA-4317 Document Control Desk scope of inspection will be increased to include all accessible areas of welds Hl, H2, and H6A as shown in the Attachment to this PLA.

We plan to use the BWR Core Shroud Distributed Ligament Length Computer Program, as we did for Unit 1, to assess structural integrity ifany cracking is discovered. This program will be used to help determine ifany repairs are necessary to ensure the structural integrity of the Unit 2 shroud. If repairs are necessary, they will be performed in accordance with the BWR Core Shroud Repair Design Criteria and Flaw Evaluation Guidelines prepared by General Electric Nuclear Energy for the BWROG Vessel Internals Project.

We will submit results from the Unit 2 core shroud inspection to the NRC within 30 days following the completion of all inspections accomplished during the Unit 2 outage.

Please call our Mr. James B. Wesner ifyou have any questions.

Very truly yours, R.. am At nt copy: NRC Region I Ms. M. Banerjee NRC Sr. Resident Inspector Mr. C. Poslusny, Jr. NRC Sr. Project Manager

AFFIDAVIT COMMONWEALTHOF PENNSYLVANIA)

SS

)

I, ROBERT C. BYRAM, being duly sworn according to law, state that I am Sr. Vice President-Nuclear of Pennsylvania Power 8r Light Company and that the facts set forth on the attached PLAP317 regarding the Unit 2 7th Refuel and Inspection Outage Core Shroud Inspection Scope and Schedule are true and correct to the best of my knowledge, information and belief.

Ro C. Byram Sr. Vi Pr sident- Nuclear Sworn to and subscribed beor met of ls Q/ ,

ay 1995 Nota Public Notarial Seal Martha C. Sedora, Notary Public Atlontown, Lehioh County My Cornmlsslon Expirea Jan. 16, 1998 Member, P

~ J l/

P J'

I

ATTAOIMENtTO FLAHJI 7 Hl TO OJZDE QPPI&t RDC TYPICAL SAPLING &ALL CPOSS SECTION SUSQUEHANNA SHROUD gQRf,C,SHIT,OO I,lPO. I

CHMENT TO PLA-4317 0-S Hl ANSTEC APERTURE O4 TOP GUIOE SUPPORT RING CARD Atso Available on Aperture Card H4 INSIDE

%SOLE 9p, CORE PLATE SLPPORT RING H6-8 H9 VESSEL ltALL RPV QQOLQ QPPORT CYLINDER SI TYPICAL SHROUO &ALL CROSS SECTION SUSQUEHANNA ~HFPOUD CORE .C,RSOUO 40OI <ANG4A

S g

\

1 N

C.~U 0

I 'I 0

I I

v

(