Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
PLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | 22 October 1999 | Forwards Change J to SSES Security Training & Qualification Plan.Without Encl | |
ML20217K439 | 18 October 1999 | Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl | Safe Shutdown Earthquake Design basis earthquake |
ML20217H330 | 14 October 1999 | Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr | |
ML18152B354 | 12 October 1999 | Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info | VT-2 |
ML20216K168 | 1 October 1999 | Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein | |
ML20212J910 | 1 October 1999 | Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date | VT-2 |
ML18152B339 | 27 September 1999 | Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC | Nondestructive Examination VT-2 |
ML20212G509 | 22 September 1999 | Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) | |
ML18152B333 | 17 September 1999 | Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. | Grace period |
ML18152B667 | 17 September 1999 | Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 | Generic Fundamentals Examination |
ML18152B334 | 16 September 1999 | Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations | Nondestructive Examination VT-2 |
ML18040B295 | 8 September 1999 | Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Annual Radiological Environmental Operating Report Weak link Operability Assessment |
ML20211N253 | 8 September 1999 | Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl | |
ML20211L915 | 1 September 1999 | Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity | |
ML18152B447 | 1 September 1999 | Requests That NRC Remove Listed Labels from Distribution | |
ML20211J221 | 31 August 1999 | Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl | |
ML20211H413 | 27 August 1999 | Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint | |
PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | 24 August 1999 | Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl | |
ML20138B324 | 23 August 1999 | Forwards Draft Response to Question 1 Re NAPS USI A-46 | Earthquake |
ML20211D904 | 20 August 1999 | Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal | High Radiation Area Hydrostatic VT-2 |
ML20211B387 | 17 August 1999 | Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project | |
ML20210T067 | 13 August 1999 | Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation | |
ML20210Q984 | 12 August 1999 | Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 | |
ML20210Q766 | 6 August 1999 | Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas | |
ML18152B408 | 6 August 1999 | Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. | Loop seal Stroke time |
ML18152B409 | 5 August 1999 | Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) | Fitness for Duty |
ML20210N292 | 5 August 1999 | Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits | |
ML20210J886 | 2 August 1999 | Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate | |
ML20210F612 | 28 July 1999 | Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal | |
ML18152B397 | 26 July 1999 | Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 | |
ML20209E762 | 9 July 1999 | Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines | Packing leak Pressure Boundary Leakage |
05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl | 8 July 1999 | Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl | |
ML18040A974 | 8 July 1999 | Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant | |
ML20209E371 | 2 July 1999 | Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations | |
ML18152B440 | 1 July 1999 | Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co | |
ML18152B437 | 24 June 1999 | Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections | High Radiation Area Hydrostatic VT-2 |
ML20196G258 | 23 June 1999 | Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity | |
ML20212J295 | 22 June 1999 | Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS | |
ML20196F115 | 22 June 1999 | Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program | |
ML18152B436 | 22 June 1999 | Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 | Design basis earthquake |
ML20196G221 | 21 June 1999 | Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included | Grab sample |
ML20195J701 | 15 June 1999 | Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP | |
ML20195J139 | 11 June 1999 | Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit | |
ML20207G505 | 7 June 1999 | Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created | Enforcement Discretion |
PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 | 4 June 1999 | Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 | |
ML18152B430 | 3 June 1999 | Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 | |
ML20195C660 | 1 June 1999 | Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 Program | Safe Shutdown Boric Acid High winds Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake |
ML20207C985 | 28 May 1999 | Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted | |
ML18152B426 | 28 May 1999 | Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request | |
ML18152B422 | 27 May 1999 | Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 | Loop seal |