 Issue dateTitleTopic
PLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl22 October 1999Forwards Change J to SSES Security Training & Qualification Plan.Without Encl
ML20217K43918 October 1999Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,enclSafe Shutdown Earthquake
Design basis earthquake
ML20217H33014 October 1999Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr
ML18152B35412 October 1999Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical InfoVT-2
ML20216K1681 October 1999Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein
ML20212J9101 October 1999Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later DateVT-2
ML18152B33927 September 1999Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRCNondestructive Examination
VT-2
ML20212G50922 September 1999Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6)
ML18152B33317 September 1999Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves.Grace period
ML18152B66717 September 1999Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03Generic Fundamentals Examination
ML18152B33416 September 1999Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power StationsNondestructive Examination
VT-2
ML18040B2958 September 1999Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems EarlySafe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Annual Radiological Environmental Operating Report
Weak link
Operability Assessment
ML20211N2538 September 1999Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl
ML20211L9151 September 1999Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity
ML18152B4471 September 1999Requests That NRC Remove Listed Labels from Distribution
ML20211J22131 August 1999Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl
ML20211H41327 August 1999Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint
PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl24 August 1999Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl
ML20138B32423 August 1999Forwards Draft Response to Question 1 Re NAPS USI A-46Earthquake
ML20211D90420 August 1999Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 SubmittalHigh Radiation Area
Hydrostatic
VT-2
ML20211B38717 August 1999Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project
ML20210T06713 August 1999Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation
ML20210Q98412 August 1999Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13
ML20210Q7666 August 1999Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas
ML18152B4086 August 1999Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves.Loop seal
Stroke time
ML18152B4095 August 1999Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d)Fitness for Duty
ML20210N2925 August 1999Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits
ML20210J8862 August 1999Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate
ML20210F61228 July 1999Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal
ML18152B39726 July 1999Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02
ML20209E7629 July 1999Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass LinesPacking leak
Pressure Boundary Leakage
05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl8 July 1999Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl
ML18040A9748 July 1999Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant
ML20209E3712 July 1999Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations
ML18152B4401 July 1999Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co
ML18152B43724 June 1999Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary ConnectionsHigh Radiation Area
Hydrostatic
VT-2
ML20196G25823 June 1999Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity
ML20212J29522 June 1999Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS
ML20196F11522 June 1999Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program
ML18152B43622 June 1999Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06Design basis earthquake
ML20196G22121 June 1999Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,IncludedGrab sample
ML20195J70115 June 1999Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP
ML20195J13911 June 1999Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit
ML20207G5057 June 1999Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management CreatedEnforcement Discretion
PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.214 June 1999Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21
ML18152B4303 June 1999Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002
ML20195C6601 June 1999Forwards Response to NRC 990216 RAI Re Summary Rept of USI A-46 ProgramSafe Shutdown
Boric Acid
High winds
Safe Shutdown Earthquake
Seismically rugged
Design basis earthquake
Earthquake
ML20207C98528 May 1999Requests Regrading of Rt Robinson 990408 Written Exam,Based on Listed Reasons.Answer C for Question 18 Is Requested to Be Reconsidered as Correct or Question Be Deleted
ML18152B42628 May 1999Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request
ML18152B42227 May 1999Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2Loop seal