Forwards Requests for Relief Associated W/Inservice Testing Program & Rev 4 to Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves.
ML17349A216
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/14/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17349A217 List:
References
L-92-142, NUDOCS 9205200056
Download: ML17349A216 (6)


Text

L-92-142 Turkey Point Units 3 and 4 Page 1 of 4 RELIEF RE UEST DESCRIPTION AND STATUS

SUMMARY

RELIEF RE(VEST NUMBER DISCUSSION STATUS PR-1 Requests relief to measure Boric Acid Note A applies, however, re-Transfer Pump flow. vised to incorporate minor editorial chan es.

PR-2 Withdrawn PR-3 Testing of EDG Fuel Oil Transfer Pump. Note A applies, however, re-vised to clarify that PR-3 applies only to suction pressure measured prior to um start.

PR-4 Requests relief from bearing temperature Note A applies, however, re-measurements on all centrifugal pumps in vised to incorporate minor IST ro ram. editorial chan es.

PR-5 Requests relief from the instrument range Note A applies, however, re-and accuracy requirements when applied to vised to incorporate minor ortable test instrumentation. editorial chan es.

PR-6 Requests relief to determine ICW pump Note A applies, however, re-inlet pressure per GL 89-04. vised to incorporate minor editorial chan es.

PR-7 Requests relief from measuring static Note A applies, however, re-suction pressure on operating pumps. vised to incorporate minor editorial chan es.

PR-8 Withdrawn PR-9 Requests relief to measure RHR pump flow Note A applies, however, re-and pressure per GL 89-04, position 9. vised to reflect new flow instrumentation.

PR-10 Requests relief from measurement of Char- Note A applies, however, re-ging Pump inlet and differential pres- vised to incorporate minor sure. editorial chan es.

PR-11 Requests relief from instrument range Note A applies, however, re-requirement for RHR pump inlet pressures. vised to incorporate minor editorial changes.

Ml~ k L-92-142 Turkey Point Units 3 and 4 Page 2 of 4 RELIEF RE VEST DESCRIPTION AND STATUS

SUMMARY

PR-12 Requests relief from instrumentation ven- New relief request.

tin re uirements.

PR-13 Withdrawn VR-1 Requests relief from quarterly test fre- Note A applies, however, re-quency for Breathing Air valve. vised to incorporate minor editorial chan es.

VR-2 Requests relief from stroke time correc- Note B applies, however, re-tive action requirements for AFW flow vised to incorporate minor control valves. editorial chan es.

VR-3 Requests relief from quarterly test fre- Note A uency for Nitro en to PRT valve.

VR-4 Requests relief from quarterly test fre- Note A applies, however, re-quency for CVCS supply valve. vised to incorporate minor editorial chan es.

VR-5 Requests relief from quarterly test fre- Note A applies, however, re-quency for CVCS Boron Injection valve. vised to incorporate minor editorial chan es.

VR-6 Requests relief from stroke time correc- Note B applies, however, re-tive action requirements for Charging vised to incorporate minor Pum Dischar e Valve. editorial chan es.

VR-7 Wi thdrawn VR-8 Requests relief from quarterly test fre- Note A applies, however, re-quency for SI Pump Discharge Check vised to incorporate minor valves. editorial chan es.

VR-9 Requests relief from quarterly test fre- Note B applies, however, al-quency for Containment Spray Pump Dis- ternate testing revised.

char e Check valves.

VR-10 Requests relief from quarterly test fre- Note A applies, however, re- .

quency for SI Check valves. vised to incorporate minor editorial chan es.

VR-11 Requests relief from quarterly test fre- Note B applies, however, re-quency for SI Hot Leg Injection Check vised to incorporate minor valves. editorial changes.

L-92-142 Turkey Point Units 3 and 4 Page 3 of 4 RELIEF RE VEST DESCRIPTION AND STATUS SUNNARY VR-12 Requests relief from quarterly test fre- Note 8 applies, however, al-quency for SI Cold Leg Injection Check ternate testing revised.

valves.

VR-13 Requests relief from quarterly test fre- Note B applies, however, al-quency for SI Accumulator Discharge Check ternate testing revised.

valves.

VR-14 Requests relief from quarterly test fre- Note B applies, however, al-quency for RHR Cold Leg Injection Check ternate testing revised.

valves.

VR-15 Withdrawn VR-16 Withdrawn VR-17 Requests relief from quarterly test fre- Note B quency for RHR Cold Leg Injection Check valve.

VR-18 Requests relief from quarterly test fre- Note A applies, however, re-quency for Primary Water Supply Line Iso- vised to incorporate minor lation valve. editorial chan es.

VR-19 Requests relief from quarterly test fre- Note A uency for Sam le Return Check valve.

VR-20 Requests relief from quarterly test fre- Note A applies, however, re-quency for Instrument Air Check valve. vised to incorporate minor editorial chan es.

VR-21 Requests relief from Code acceptance cri- Note A applies, however, re-teria for the RCS Pressure Isolation vised to incorporate minor valves listed in Technical Specifica- editorial changes.

tions.

VR-22 Withdrawn VR-23 Requests relief from the stroke time cor- Note A applies, however, re-rective action requirements for valves vised to delete identifica-designated as "fast-acting". tion of fast-acting valves within the IST program.

(Fast-acting valves are identified in the IST Com-onent Analysis Summary .

Withdrawn

t L-92-142 Attachment 1 Turkey Point Units Page 4 of 4 3 and 4 RELIEF RE VEST DESCRIPTION AND STATUS SUNHARY VR-25 Withdrawn VR-26 Requests relief from quarterly test fre- Note A applies, however, re-quency for Instrument Air Supply Check vised to incorporate minor valve. editorial chan es.

VR-27 Requests relief from quarterly test fre- Note A applies, however, re-quency for SI Accumulator Supply Check vised to include an additio-valve. nal valve in response to Supplement to Heeting Hin-utes on GL 89-04.

VR-28 Requests relief from quarterly test fre- New relief request. Submit-quency for Nitrogen to PRT Isolation ted in response to Supple-valve. ment to Heeting Hinutes on GL 89-04.

VR-29 Requests relief from quarterly test fre- Note B applies, however, re-quency for AFW Pump Bearing Cooling Water vised to incorporate discus-Discharge Check valves. sion of non-obtrusive test-ing, system cleanliness, and valve alignment verifica-tion.

VR-30 Requests relief from quarterly test fre- Note B applies, however, re-quency for Boric Acid Discharge to CVCS vised to incorporate minor Check valves. editorial chan es.

VR-31 Withdrawn VR-32 Withdrawn VR-33 Requests relief from Code leakage crite- New relief request. Per GL ria for valves 6" or larger which are 89-04, this request is pre-currently tested in accordance with 10 approved following submittal CFR 50 Appendix J. to the NRC.

Note A: Request approved by NRC Safety Evaluation Report dated September 21, 1991.

Note B: Interim relief granted by NRC Safety Evaluation Report dated January 23, 1992. Interim relief expires on August 31, 1992.