ML17342B126

From kanterella
Jump to navigation Jump to search
Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000440/2018410
ML17342B126
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/08/2017
From: Hausman G
NRC/RGN-III
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IP 71130.10P IR 2018410
Download: ML17342B126 (8)


See also: IR 05000440/2018410

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

December 8, 2017

Mr. David B. Hamilton

Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

Reg Affairs-A210

10 Center Road, P.O. Box 97

Perry, OH 44081-0097

SUBJECT: PERRY NUCLEAR POWER PLANTINFORMATION REQUEST FOR THE CYBER-SECURITY FULL

IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION

05000440/2018410

Dear Mr. Hamilton:

On April 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance

with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at your Perry Nuclear

Power Plant, Unit 1. The inspection will be performed to evaluate and verify your ability to meet full

implementation requirements of the NRCs Cyber-Security Rule, Title 10 of the Code of Federal

Regulations, Part 73, Section 54, Protection of Digital Computer and Communication Systems and

Networks. The onsite portion of the inspection will take place during the weeks of April 2-6, 2019, and

April 16-20, 2018.

Experience has shown that these inspections are extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for documents needed for the

inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection Procedure. This

information should be made available via compact disc and delivered to the regional office no

later than January 8, 2018. The inspection team will review this information and, by February 5,

2018, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets, defensive architecture, and the areas

of your plants Cyber-Security Program selected for the Cyber-Security Inspection. This

information will be requested for review in the regional office prior to the inspection by

March 5, 2018.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, April 2, 2018.

D. Hamilton -2-

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our regulatory

contact for this inspection is Mr. Tony Kledzik of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9743 or via e-mail at

George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with

10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

George M. Hausman, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Cyber-Security Inspection Document Request

cc: Distribution via LISTSERV

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Letter to David B. Hamilton from George M. Hausman dated December 08, 2017

SUBJECT: PERRY NUCLEAR POWER PLANTINFORMATION REQUEST FOR THE CYBER-SECURITY FULL

IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION

05000440/2018410

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Cynthia Pederson

Kenneth OBrien

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

ADAMS Accession Number: ML17342B126

OFFICE RIII

NAME GHausman:cl

DATE 12/08/17

OFFICIAL RECORD COPY

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000440/2018410

Inspection Dates: Weeks of April 2-6, 2018, and April 16-20, 2018

Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017

Reference: Guidance Document for Development of the Request for Information

and Notification Letter for Full-Implementation of the Cyber-Security

Inspection, Issue Date October 26, 2017 (ML17156A215)

NRC Inspectors: George M. Hausman, Lead Gregory P. Hansen

630-829-9743 630-829-9610

George.Hausman@nrc.gov Gregory.Hansen@nrc.gov

Catherine J. Allen

301-287-3620

Catherine.Allen@nrc.gov

NRC Contractors: Alan B. Konkal Cynthia A. DeBisschop

561-989-0210 301-287-3710

Alan.Konkal@nrc.gov Cynthia.DeBisschop@nrc.gov

Observers: James D. Beardsley Robert C. Daley

301-287-0908 630-829-9749

James.Beardsley@nrc.gov Robert.Daley@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates on

providing the inspection team with the general information necessary to select appropriate

components and Cyber-Security Program (CSP) elements to develop a site-specific inspection

plan. The first RFI is used to identify the list of critical systems and critical digital assets

(CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be

chosen as the sample set required to be inspected by the Cyber-Security Inspection Procedure

(IP). The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1

information is requested to be provided to the regional office by January 8, 2018, or sooner, to

facilitate the selection of the specific items that will be reviewed during the onsite inspection

weeks.

Enclosure

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI. The inspection team will submit the specific

systems and equipment list to your staff by February 5, 2018, which will identify the specific

systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,

and the areas of the licensees CSP selected for the Cyber-Security Inspection. All requests for

this information shall follow the Table RFI #1 and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the lead

inspector by January 8, 2018. Please provide five copies of each CD submitted (i.e., one for each

inspector/contractor). The preferred file format for all lists is a searchable Excel spreadsheet

file. These CDs should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3, Paragraph Number/Title: Items

1 List All Identified CSs and CDAs All

2 List CDA Facility and Site EthernetTransmission Control Protocol/Internet All

Protocol Based Local Area Networks (LANs) and Identify Those LANs That Have

Non-CDAs On Them

3 List CDA Facility and Site Non-Ethernet Transmission Control Protocol/Internet All

Protocol Based LANs Including Those Industrial Networks and Identify LANs

That Have Non-CDAs On Them

4 Network Topology Diagrams (Be Sure To Include All NIDs and Security All

Information and Event Managements (SIEM) for EP Networks and Security

Level 3 and 4 Networks)

8 List All Network Security Boundary Devices for EP Networks and All Network All

Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

11 Network Intrusion Detection System Documentation for CSs That Have CDAs 11.a.1)

Associated with Them 11.a.2)

12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.1)

12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems All

25 Cyber-Security Assessment and Cyber-Security Incident Response Teams All

28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To Support All

Changes To That Plan

29 Copy Of Any Licensee-Identified Violations and Associated Corrective Action All

Program (CAP) Documentation To Resolve Issue(s)

2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

In addition to the above information please provide the following:

(1.) Electronic copy of the Updated Finals Safety Analysis Report and technical

specifications.

(2.) Name(s) and phone numbers for the regulatory and technical contacts.

(3.) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of

specific systems and equipment to your staff by February 5, 2018 for the second RFI

(i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by February 5, 2018, for the second RFI (i.e., Table RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the Cyber-Security Inspection. The

additional information requested for the specific systems and equipment is identified in

Table RFI #2. All requests for this information shall follow the Table RFI #2 and the guidance

document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by March 5, 2018.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor). The

preferred file format for all lists is a searchable Excel spreadsheet file. These CDs should be

indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

5 Plant Computer System Block Diagram (If Plant Computer System Is Selected All

for Inspection)

6 Plant Security System Block Diagram (If Security Computer System Is Selected All

for Inspection)

7 Systems That Are Distributed Block Diagrams (For Systems Selected All

for Inspection)

10 Host-Based Intrusion Detection System Documentation (For CDAs for Systems 10.a.1)

Selected for Inspection) 10.a.2)

13 List All Maintenance and Test Equipment Used On CDAs for Systems Selected All

for Inspection

15 Configuration Management All

16 Supply Chain Management 16.a.

16.b.1)

3

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Reference Section 3, Paragraph Number/Title: Items

16.b.5)

16.b.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

20 Vendor Access and Monitoring All

21 Work Control All

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last NRC Inspection All

27 Cyber Security Assessments for Selected Systems All

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide the

following RFI (i.e., Table 1ST Week Onsite) on CD by April 2, 2018, the first day of the inspection.

All requests for this information shall follow the Table 1ST Week Onsite and the guidance

document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor). The

preferred file format for all lists is a searchable Excel spreadsheet file. These CDs should be

indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3, Paragraph Number/Title: Items

10 Host-Based Intrusion Detection System Documentation for CDAs for Systems 10.a.3)

Selected for Inspection thru

10.a.12)

11 Network Intrusion Detection System Documentation for CSs That Have CDAs 11.a.3)

Associated with Them thru

11.a.15)

12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.3)

thru

12.a.14)

16 Supply Chain Management 16.b.2)

16.b.3)

16.b.4)

4

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

19 Cyber-Security Event Notifications All

29 Update to Licensee Identified Violations and CAP Actions Taken Since the All

Initial Request Was Made

In addition to the above information please provide the following:

(1.) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance Plan;

e. Latest IPE/PRA Report; and

f. Vendor Manuals.

(2.) Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance audit and/or

self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security

Quality Assurance audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1.) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2.) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team

leader.

5