Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] Category:RESEARCH INSTITUTION/LABORATORY TO NRC
MONTHYEARML17348A2431990-04-0505 April 1990 Submits Results of Comparisons of Heat Rate Measurements in Reg Guide 3.54 W/Measurements Predicted by ORIGEN-S/SAS2. Cover Pages from Technical Repts Encl ML20138G8311985-10-11011 October 1985 Informs That Bnwl Employee DB Jarrell Will Assist in Support of NRC Maint & Surveillance Program,Phase I ML20136G1941985-06-25025 June 1985 Submits List of Battelle Participants Supporting NRC Maint & Surveillance Program,Phase I ML20069P2701982-10-19019 October 1982 Discusses Summary of ACRS Reactor Operations Subcommittee 820929 Meeting Re Turkey Point Cold Overpressure Incident. Tech Specs Do Not Properly Address Situations in Which Availability of Certain Sys More Vital to Safe Operation ML17341A2051981-06-0808 June 1981 Forwards Containment Leakage Rate Testing, Technical Evaluation Rept ML17340A6411980-12-12012 December 1980 Submits Info in Response to 801126 & 1202 Telcons Re Potential Drop of Steam Generator & Subsequent Release of Radioactive Matl.Release of Radioactivity Would Be Less than 10%.Forwards Article on Deposits in Primary Sys ML19344A8161980-03-27027 March 1980 Forwards Requests for Addl Info to Complete Evaluation of Reactor Bldg Crane to NUREG-0554 Requirements ML17339A5011980-01-22022 January 1980 Forwards Final Inputs for 6-month Period Re Util Fire Protection Review.Recommends Acceptance of Plans for Fire Detection Sys & Proposal for Screen Wash Pump as Backup. Mod Necessary on Water Suppression Sys ML17338A3441978-12-0606 December 1978 Discusses Fire Protection in Operating Nuclear Power Stations,In Particular Providing Analysis of Facilities' Ser.Proposed Fire Protection Mod Increases Level of Protection Against Fire Hazards ML17338A3461978-09-21021 September 1978 Requests Addl Info Re Fire Protec at Subj Facils.Info Concerns Water Supply,Cable Protec,Yard Hydrants,Smoke Venting Equip & Smoke Removal.Documentation Re Info Sought Encl 1990-04-05
[Table view] |
Text
p'O(p p REGULATOR NFORMATION DISTRIBUTION STEM DOCKET NB 2 p DOC DATE:
RECIPIENT: PERDU ON ACCESSION NBR:
ORIGINATOR: HAL COPIES RECEIVED:
COMPAN~- FL PWR & LI HT LTR 'NCL
SUBJECT:
SI ZE: 5+9 Discusses fire rotec in o eratin nuc wr stations in articular rovidin an analysis of facils'ER. Asserts that ro osed fire rotec mod re resents n increase in level of protec against fire hazards'.
OISTRTBUT?ON CODE t A006 OISTR)RUT?ON TITLE l NOTARIZED FTRE PROTECTION I~FARNATION (AFTER ISSU4NCE OF OL),
NAPE ENCLV FOR ACTION N/ll ENCL ~ ORB//1 BC 8
EG FTL ~/ENCL
~/F hlCL I 8 E lv/7 ENCL OELD LTR ONLY AUXILTARY SYS BR 'li/2 E NC L 40 FOR SYS 8, PRI)J W/ENCL PLANT SYSTEMS HR W/g 8 A l4l 9 A C H tv/ENCL R HURANAKA W/ENCL HANAUFR ~/ENCL LPDR >/ENCL TERA </ENCL NSIC W/ENCI ACRS 'H/16 ENCL TOT A[ NUHRER OF COPIES REAUIRF0 I LTR 3c)
ENCL 38 DEC Z3 197S A3)D BRINKMAN W/ENCL.
BROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVERSITIES, INC.
K='
'on, New York 11973 Department of Nuclear Energy (516) 385- 2144 6 December 1978 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. '0555 Attention: Mr. Robert L. Ferguson Plant Systems Branch
Dear Bob:
~Sub ect: Fire Protection in 0 aretine Nuclear Power Stations - Turke Point Nuc ear Power P ant Safet Eva uatson Re ort Review The Safety Evaluation Report, as developed jointly by the NRC staff and Brookhaven National Laboratory (BNL), adequately reflects the concerns and re-commendations of the consultants. Throughout the reevaluation of Turkey Point there has been general agreement between the NRC staff and the BNL consultants.
Based on present data, the proposed fire protection, as set forth in the draft SER, will provide significant enhancement of the fire protection program at the Turkey Point Plants, and thus, represents significant progress towards a com-prehensive fire protection program. The following subjects represent the re-solutions of the items of concern as discussed in a letter dated September 21, 1978 from R.E. Hall (BNL) to R.L. Ferguson (NRC), see attached. The final SER has not yet been received, and therefore, this discussion is based on an NRC memorandum from G.C. Lainas to A. Schwencer dated August 15, 1978 containing the originally reviewed draft SER and numerous. discussions and meetings between the staff and BNL.
~ Water Su 1 for Fire Protection The adequacy of the dedicated fire protection water supply at the Turkey Point Units remains questionable. The administrative control, to guarantee a minimum of 180,000 gallons cannot be endorsed since the required information to determine the plant's maximum demands has not been submitted by the licensee.
In addition, administrative controls should not replace the required physical dedication. This discussion is contained in the attached letter of September 21, 1978.
At this time it is our understanding that the subject of an adequate water supply for fire protection will be an open item in the safety evaluation. Upon the receipt of further information from the licensee, the evaluation will be completed.
Og
~gP
Mr. Robert L. Ferguson December 6, 1978 4 Redundanc in Mater Su 1 The requirements of Appendix A to the Branch Technical Position 9.5-1, dated August 23, 1976, are such that two separate water supplies be provided.
The licensee, at this time, does not meet this criteria and proposes to make available a spool piece to allow the use of the screen wash pumps, salt water, as the secondary sour ce. Due to the unanswered questions regarding the maxi-mum water demand and the capabilities of the screen wash pump's, this item should also be held as an open item, reference attached letter of September 21, 1978.
~ Cable Protection - Area 58 Fire Area 58 contains a large volume of safety-related cables for both Units 3 and 4. In addition, this area is the main access hallway to the auxi-liary building and as such is exposed to numerous transient combustibles, con- see letter of September 21, 1978. The licensee proposal to administratively trol the flammable and combustible liquids in this area does not resolve the problem. The falme retardant cable coatings will retard flame propagation but this does not remove the possibility of a fire occurring that could affect both safety channels of Unit 3 as well as Unit 4.
There is a need to determine if relative remote shutdown capabilities exist ot a fire. Based on this information for this area for both units in the event conclusions can be drawn as to the adequacy of the protection.
o Cable Protection - Cable S readin Room Upon reviewing the licensee submittal and visiting the site of Turkey Point Units 3 and 4, conclusions cannot be drawn as to the ability of the units to remotely shut down. This assumes the loss of the cable spreading room. Based on discussion with the NRC staff, we recommend that the licensee reevaluate this capability while investigating the same situation in Fire Area 58. Upon receipt of this reevaluation, a conclusion can be drawn as to the required fire protec-tion in, the cable spreading room.
~Yd II d Our letter of September 21, 1978 recommended the installation of a 2-1/2" gate valve on each 2-1/2" hydrant outlet in place of only one throttling valve per unit. Upon reevaluation, with new information supplied to BNL by the hy-drant manufacturer, we conclude that the single valve should be acceptable.
Mhile the second valve would still aid the fire fighters in throttling and ad-ding hose line, it has been determined that our concern about undermining the hydrant by throttling it has been resolved. At this time we recommend approval of the licensee position.
Mr. Robert L. Ferguson December 6, 1978 o Smoke Ventin E ui ment The concept of utilizing two 5,000 CFM or greater smoke ejectors in place of the BNL recormended three unit scheme, reference letter of September 21, 1978, is marginally acceptable. Although the two units do not allow for as versatile a smoke moving capability, if sized correctl they should prove adequate. In addition, the problem of utilization of the third unit in the event of an ejector failure can be resolved by a proper maintenance and testing program. We there-fore recommend at this time, the acceptance of the licensee program.
~ Turbine Buildin Subsequent to the September 21 letter, concerns have developed regarding the adequacy of the fire protection for cable systems in the turbine building.
We recommend that the licensee perform a more, realistic evaluation of the po-tential for safety-related cable damage given an oil fire in this location.
~ Valve Su ervision Electrical valve supervision should be provided on all valves controlling fire water systems and sectionalizing valves. The present proposal of adminis-trative controls or locks is unacceptable. See letter dated July 13, 1977 to Mr. R.L. Ferguson from Mr. R.E. Hall.
The preceding statements are a result of a detailed evaluation of the fire protection program as implemented by the Florida Power and Light Company at the Turkey Point Nuclear Power Station. The analysis covered a review of the fire prevention, detection and suppression capabilities of Units 3 and 4 of this plant as interfaced with the nuclear systems requirements. This was accomplished by utilizing a review team concept with members from Brookhaven National Labora-tory (BNL) and the Nuclear Regulatory Commission Division of Operating Reactors staff.
The fire protection evaluation for Turkey Point is based on an analysis of documents submitted by the Florida Power and Light Company to the Nuclear Regu-latory Coranission and a site visit. The site visit was conducted by Mr. T.
Dunning and Mr. L. Derderian of the NRC; Mr. M. Antonetti of Gage-Babcock and Associates, Inc., under contract to BNL; and Mr. John Townley, consultant to BNL. Mr. J. Townley was under contract to BNL to review the manual fire fight-ing capabilities of the station along with administrative controls. This review has been conducted under the direction of Mr. E. MacDougall and myself of the Reactor Engineering Analysis Group at BNL.
We have reviewed the Turkey Point Nuclear Power Plant (the licensee) analy-ses and have visited the facility to examine the relationship of safety-related components, systems and structures with both combustibles and the associated fire detection and suppression systems. Our review has been limited to the as-pects of fire protection related to the protection of the public from the stand-point of radiological health and safety. We have not considered aspects of fire
Mr. Robert L. Ferguson December 6, 1978 protection associated with life safety of onsite personnel and with property protection, unless they impact the health and safety of the public due to the release of radioactive material.
It is our conclusion that the proposed fire protection modification, as discussed in the SER and as might be implemented by the items discussed above, represents an increase in the level of protection against serious fire asso-ciated hazards.
obert E. Hall, Group Leader Reactor Safety Analysis REH:yo Attachment
DISTRIBUTION H. Antonetti I. Asp V. Benaroya E. Blackwood
!l. Butler R. Cerbone D. Eisenhut R. Feit R. Ferguson R. Hall S. Hanauer P. Herman E. Imbro
!l. Kato J. Kievan G. Lainas C. Long E. t)ac0ougall J. Riooelle V. Stello T. Telford H. Todosow J. Townley PDR