PRIORITY ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION. NBR:,9412190167 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET N FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1994 for Nuclear Plant Unit 2.W/941208 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES'ECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRE 10 10 AEOD/SPD/RRAB 1 1 CE.- R 01 1 1 NRR/DISP/PIPB 1 1 NRR/5OPS/OECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE 1 J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"Rl DS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTiiCTTIIE DOCUifENTCONTROL DESK, ROO!iI PI-37 I EXT. 504-20S3 ) TO ELIiiiINATEYOUR NAifE FRO!if DISTRIBUTION LIS'I'S I'OR DOCL %1EN'I'S YOU DON"I'L'I'.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

e WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax968 ~ 3000George Wasbtngton Way ~ Richland, Wasbtngton 99352-0968 ~ (509)372-5000 December 8, 1994 G02-94-271 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT NOVEMBER 1994 Transmitted herewith is the Monthly Operating Report for the month of November, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, G. O. Smith Op rations Division Manager (MD 9270)

GOS:DGE CC: NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 9412190167 941130 PDR ADOCK 05000397 R PDR

~ r 0 .

j"'

~

(~ l'< ~

A y

I'"

OPERATING STATUS REPORT for WNP-2 Date: December 1, 1994 Docket: 50-397

2. Reporting Period: NOVEMBER 1994 Outage + On-Line Hours: 720.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ); 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132
8. Maximum Dependable Capacity (Net MW, ): 1086
9. If changes occur above since last report, give reasons: N/A
10. Power to which restricted, if any (Net MW,): None
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 720.0 8,016.0 87,344.2
13. Hours Reactor Critical 720.0 5,846.4 61,956.6
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 720.0 5,756.6 59,823.6
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 2,381,306 18,037,723 176,799,029
18. Gross Electrical Energy (MWH) 827,300 6,183,510 59,495,720
19. Net Electrical Energy (MWH) 797,296 5,913,241 56,998,626
20. Unit Service Factor 100.0% 71.8% 68.5%
21. Unit Availability Factor 100.0% 71.8% 68.9%
22. Unit Capacity Factor (MDC Net) 102.0% 67.9% 59.8%
23. Unit Capacity Factor (DER Net) 98.9% 65.9% 59.1%
24. Unit Forced Outage Rate 0.0% 1.5% 11.8%
25. Forced Outage Hours 0.0 85.8 7,971.1
26. Shutdowns scheduled over the next 6 months (type, date, duration):

Annual refueling (R-10), April 15, 1995, 42 days.

27. If currently shutdown, estimated startup date: N/A Note: Cumulative Unit Capacity Factors (MDC 8r, DER) are calculated with weighted averages.

4 I **

It .. "r '>>4 4

r I

4

>>I 4

>> rr >> ,

I'I I,I r II

~ lI 'll 4- >> I I

0 ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: December 1, 1994 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: NOVEMBER 1994 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1108 16 1109 1118 17 1115 1113 18 1118 1109 19 994 1120 20 1095 1117 21 1120 22 1119 1112 23 1110 1104 24 1116 10 1108 25 1113 1109 26 1115 12 1113 27 1112 13 1114 28 1115 14 1107 29 1104 15 1110 30 1093 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

P' I'

'1 H y )P

UNIT SHU'H)OWNS AND POWER- REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP DATE: December 1, 1994 COMPLETED BY: D.G. Embree TELEPHONE: (509) 3774448 REPORT PERIOD: NOVEMBER 1994 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

The plant operated at full power during most all of the month, except for short downpower evolutions for periodic testing and minor maintenance.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other