ML17291A438

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1994 for Wnp Unit 2.W/941005 Ltr
ML17291A438
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-232, NUDOCS 9410130267
Download: ML17291A438 (10)


Text

RI(3RIT'Y PACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9410130267 DOC.DATE: 94/09/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH, NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1994 for WNP Unit 2.w/941005 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL 2 SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 10 10 AEOD/SPD/RRAB 1 1 1 1 NRR/DORS/OEAB 1 1 1 1 RGN4 1 1 EXTERNAL EG &G BRYCE i J ~ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENT CONTROL DESK. ROOM Pl-37 (EXT. 504-2083 ) TO ELlihIINATEYOUR NAME FROihl DISTRIBUTION LISTS I'OR DOCUMENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 96'8 ~ 3000 George Wasbtngton Way ~ Rtcbland, lPasbtngton 99352-0968 ~ (509) 372-5000 October 5, 1994 G02-94-232 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT SEPTEMBER 1994 i

Transmitted herewith is the Monthly Operating Report for the month of September, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, G. Q-.Smith Operations Division Manager (MD 9270)

GOS:DGE CC: NRC, MN BB-7602, Washington, DC NRC, Administrator, Region IV NRC, Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 9410i30267 940'730 PDR ADOCK 05000397 PDR

OPERATING STATUS REPORT for WNP-2 Date: October 1, 1994 Docket: 50-397

2. Reporting Period: SEPTEMBER 1994 Outage + On-Line Hours: 720.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132 Maximum Dependable Capacity (Net MW, ): 1086
9. If changes occur above since last report, give reasons: N/A
10. Power to which restricted, if any (Net MW,): None
11. , Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 720.0 6,551.0 85,879.2
13. Hours Reactor Critical 720.0 4,381.4 60,491.6
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 720.0 4,291.6 58,358.6
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 2,388,583 13,189,404 171,950,710
18. Gross Electrical Energy (MWH) 821,520 4,501,940 57,814,150
19. Net Electrical Energy (MWH) 789,576 4,294,007 55,379,392
20. Unit Service Factor 100.0% 65.5% 68.0%
21. Unit Availability Factor 100.0% 65.5% 68.4%
22. Unit Capacity Factor (MDC Net) 101.0% 60.4% 59.1%
23. Unit Capacity Factor (DER Net) 97.9% 58.5% 58.5%
24. Unit Forced Outage Rate 0.0% 2.0% 12.0%
25. Forced Outage Hours 0.0 85.8 7,971.1
26. Shutdowns scheduled over the next 6 months (type, date, duration): None
27. If currently shutdown, estimated startup date: N/A Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

S, ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: October I, 1994 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: SEPTEMBER 1994 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1089 16 1097 1094 17 1099 1094 18 1098 1103 19 1097 1104 20 1095 1094 21 1097 1095 22 1103 1093 23 1103 1094 24 1070 10 1104 25 1101 1104 26 1100 12 1104 27 1098 13 1101 28 1098 14 1092 29 1090 15 1098 30 1092 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.." 50-397 UNIT NAME: WNP-2 DATE: October 1, 1994 COMPLETED BY: D.G. Embree TELEPHONE: (509) 3774448 REPORT PERIOD: SEPTEMBER 1994 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

The plant operated at full power during most all of the month, except for minor downpower evolutions for periodic testing.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG-0161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

F

,,1 \

e I '

[500] From: HEATHER L. TOWNSEND at -SERVER23 9/30/94 1:16PM (2001 bytes: 29 ln)

To: JOHN H. 'SQAILES at -SERVER2 cc: JOHN W.. DABNEY at -SERVER2, MICHAEL R. KELLER at -SERVER2, TAMMY S. LOVE, DONALD H. MERHAR at -SERVER2, CHRISTOPHER J. SCHWARZ, EULES K. WORTHEN at

-SERVER2, JOHN E. WYRICK at -SERVER2, JOSEPHINE J. AMES at -SERVER2, WINDY N. FRANK at -SERVER2, ANITA E. POOLE at -SERVER2, JOSEPH V. PARRISH at

-SERVERl, TRACI M. HARDY at -SERVER1, LINDA M. MAR at -SERVER4, SHARON M. GRUNST at -SERVER2, MARK E. REDDEMANN at -SERVER5, BEVERLY A. CADWELL at -SERVERS, JOHN R. SAMPSON at -SERVER2, LUELLA R. HAWKINS at -SERVER2, WILLIAM H. BARLEY at -SERVER2, CARMEN M. SAWYER at -SERVER24, JOHN F. PETERS at -SERVER2, DONNA E. MCCAULEY at -SERVER1

Subject:

Delegation of Authority Message Contents eeeeeeeeeeeeeeeeeeeeeeeeeeeeE INTEROFFICE MEMORANDUM aeeeeeeeeeee-eeeeeeeeeeei'eeeY DATE: September 29, 1994 TO: J.H. Swailes, WNP-2 Plant Manager (927M)

FROM: G.O. Smith, Operations Division Manager (9270)

SUBJECT:

DELEGATION OF AUTHORITY

REFERENCE:

During my absence on October 2-4, 1994, Mr. C.J. Schwarz will act for the Operations Division Manager. Mr. Schwarz will have full authority of the position with the exception of personnel and salary actions.

Should my scheduled return be delayed, this delegation'hall continue until my actual return.

hit "Original signed and filed"

I k, ~ ly jP