Monthly Operating Rept for May 1994 for WNP-2.W/940603 Ltr
ML17291A113
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1994
From: Embree D, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-94-130, NUDOCS 9406090113
Download: ML17291A113 (7)


Text

DOCUMENT SYSTEM

~ ~

ACCELERANT+ DISTRIBUTION REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public .Powe 05000397 AUTH. NAME AUTHOR AFFILXATXON EMBREE,D.G. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System I RECIP.NAME RECIPIENT AFFILIATION D

SUBJECT:

Monthly operating rept for May 1994 for WNP-2. 940603

'S DXSTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech j

Speds)

ENCL SIZE:

NOTES:

RECIPIENT COPIES RECXPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDIV-3 PD 1 1 CLIFFORD,J 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 DORSJOEAB 1 1 D NRR/DRI L/RPEB 1 1 REG LE 01 1 1 RGN4 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE} CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL,NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

/

ff J

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bax 96'8 ~ 3000 George Wasbtngton Way ~ Richland, 1Wasbtngton 993524968 ~ (509) 372-5000

, ~ un 3, i994

<G02-94-"130 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT MAY 1994 Transmitted herewith is the Monthly Operating Report for the month of May, 1994 as required by our Technical Specifications 6.9.1.6.

Sincerely, c~f,A G. O. Smith Operations Division Manager (MD 9270)

GOS:DGE CC; Mr. W.H. Lovelace, NRC, Washington, DC Mx. K.E. Perkins, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (927N)

Mr. J.T, Wheelock, INPO Mr. C. Bergesen, Utility Data Institute Mr. J.T. Irish, BPA (399) 9406090113 940531 PDR ADOCK 05000397 PDR

s,),')P 'I g 1> 6 <Nll hg "I I,

OPERATING STATUS REPORT for WNP-2 Date: June 1, 1994 Docket: 50-397

2. Reporting Period; MAY 1994 Outage + On-Line Hours: 744.0
3. Utility

Contact:

David G. Embree (509) 377-,8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1132 Maximum Dependable Capacity (Net MW, ): 1086 Ifchanges occur abc. e s'.nce hst ."epoit, gi.e reasons: n/a
10. Power to which restricted, if any (Net MW,):

Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 3,623.0 82,951.2
13. Hours Reactor Critical 0.0 2,769.2 58,879.4
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 0.0 2,769.2 56,836.2
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 0 8,330,944 167,092,250
18. Gross Electrical Energy (MWH) 0 2,846,410 56,158,620
19. Net Electrical Energy (MVH) - 6,198 2,720,965 53,806,350
20. Unit Service Factor 0.0% 76.4% 68.5%
21. Unit Availability Factor 0.0% 76.4% 69.0%
22. Unit Capacity.,Factor (MDC Net) 0.0% 69.2% 59.4%
23. Unit Capacity Factor (DER Net) 0.0% 67.1% 58.8%
24. Unit Forced Outage Rate 0.0% 3.0% 12.3%
25. Forced Outage Hours 0.0 85.8 7,971.1
26. Shutdowns scheduled over the next 6 months (type, date, duration):

Annual Refueling Outage, April 30, 1994, about 60 days.

27. If currently shutdown estimated startup date: June 29, 1994 Note: Cumulative Unit Capacity Factors (MDC 8I, DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: June 1, 1994 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: MAY 1994 AVERAGE DAILYPOWER LEVEL , AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe)

-14 16 -7

-14 17 -7

-12 18 -8 19 -8

-8 20 21 22

-8 23 -8

-7 24 10 -8 25 -9

-8 26 -9 12 27 -9 13 -8 28 -8 14 -7 29 30 31 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 Fo line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: June 1, 1994 COMPLETED BY: D.G. EmSree TELEPHONE: (509) 3774448 REPORT PERIOD: MAY 1994 C No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9443 April 30 S 744.0 C RC FUELXX Plant officially entered the annual refueling outage (R-9) on April 30.

SUMMARY

WNP-2 was in the annual refueling and maintenance outage (R-9) for the entire month.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREGW161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other