ML17290A735

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1993 for Wppss Unit 2.W/ 931111 Ltr
ML17290A735
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1993
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-267, NUDOCS 9311150199
Download: ML17290A735 (8)


Text

.accm,zm xm oocmmm REGULATOR INFORMATION wsr DISTRIBUTION mrs svsxxrvr STEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.LIAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

. operating rept for Oct 1993 for WPPSS Unit 2.W/

931111 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 3 3 PDV PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 REG FILE 01 1 1 RGN5 1 1 EXTERNAL EG&G BRYCE g J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96'8 ~ 3000 George Wasbtngton Way ~ Rtobland, Wasbtngton 99352-096'8 ~ (509) 372-5000 November ll, 1993 G02"93"267 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sirs:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT OCTOBER, 1993 Transmitted herewith is the Monthly Operating Report for the month of October, 1993 as required by our Technical Specifications 6.9.1.6.

Sincerely J. V. Parrish Assistant Managing Director, Operations (MD 1023)

JVP:DGE CC: Mr. W.H. Lovelace, NRC, Washington, DC Mr. B.H. Faulkenburry, NRC Region V Mr. R.C. Barr, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. C. Bergesen, Utility Data Institute

'F 9311150199 931031 PDR ADOCK 05000397 R PDR,

4I t

4 J

4 g

~

egpp

OPERATING STATUS REPORT for WNP-2 Date: November 1, 1993

1. Docket: 50-397
2. Reporting Period; OCTOBER 1993 Outage + On-Line Hours: 745.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): '165
8. Maximum Dependable Capacity (Net MW, ): 1112
9. Ifchanges occur above since last report, give reasons: n/a
10. Power to which restricted, if any (Net MW,): n/a 11., Reasons for restrictions, if any: n/a MONTH YEAR CUMULATIVE
12. Report Period Hours 745.0 7,296.0 77,864.2
13. Hours Reactor Critical 745.0 5,497.5 54,646.2
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 745.0 5,295.3 52,603.0
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 2,464,406 16,751,087 153,915,737
18. Gross Electrical Energy (MWH) 854,160 5,772,590 51,621,680
19. Net Electrical Energy (MWH) 822,619 5,506,281 49,456,700
20. Unit Service Factor 100.0% 72.6% 67.6%
21. Unit Availability Factor 100.0% 72.6% 68.0%
22. Unit Capacity Factor (MDC Net) 99.3% 67.9% 58.0%
23. Unit Capacity Factor (DER Net) 98.6% 67.4% 57.7%
24. Unit Forced Outage Rate 0.0% 10.4% 13.0%o
25. Forced Outage Hours 0.0 612.0 7,885.3
26. Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling Outage, April 15, 1994, 60 Days.

27. If currently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

I

'N

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1993 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377-844S REPORT PERIOD: OCTOBER 1993 No. Date Type Hours Reason Method- LER Number System Component Cause and Corrective Action To Prevent Recurrence NONE

SUMMARY

WNP-2 operated near fuli power during the month of October with no outages or significant power reductions (>20%).

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG-0161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

A ~

I~ I I

  • I:" ' I S

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: November 1, 1993 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: OCTOBER 1993 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1099 16 1104 1104 17 1103 18 1104 19 1102 20 1115 1101 21 1114 1107 22 1110 1106 23 1103 993 24 1112 10 1097 25 1116 1109 26 1117 12 1107 27 1117 13 1103 28 14 1105 29 15 1100 30 1118 31 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100Fo line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.