Monthly Operating Rept for June 1993 for Wnp,Unit 2.W/ Undated Ltr
ML17290A513
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1993
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-176, NUDOCS 9307140123
Download: ML17290A513 (7)


Text

seem,mju rp aOCnmm orson INFORMATION DISTRIBUTIO anal SVSrzM REGULAT SYSTEM (RIDS)

ACCESSION NBR:9307140123 DOC.DATE: 93/06/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System R RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1993 for WNP,unit 2.W/

undated ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) 2 ENCL 2 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDV LA 3 3 PDV PD 1 1 CLIFFORD,J 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 D AEOD/DSP/TPAB 1 1 NR~/JARS/OEAB 1 1 NRR/DRIL/RPEB 1 1 RE~LE Ol 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H NRC PDR 1 1 NSIC D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 602-93-176 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT June 1993 Transmitted herewith is the Monthly Operating Report for the month of June 1993 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J. V. Parrish (MD1023)

Assistant Managing Director of Opertions DE/ja cc: Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute q.~ nn.~~

9307140123 930b30 PDR ADOCK 05000397 P.DR

t'VvUG<-

f i

~, ~

OPERATING STATUS REPORT for WNP-2 t

Date: July 1, 1993 Docket: 50-397

2. Reporting Period: June 1993 Outage + On-Line Hours: 720.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3323
5. Nameplate Rating (Gross MW, ): 1200.9
6. Design Electrical Rating (Net MW,): 1120
7. Maximum Dependable Capacity (Gross MW,): 1165
8. Maximum Dependable Capacity (Net MW, ): 1112
9. If changes occur above since last report, give reasons: n/a
10. Power to which restricted, ifany (Net MW,): n/a
11. Reasons for restrictions, if any: n/a MONTH YEAR CUMULATIVE 12, Report Period Hours 720.0 4,343.0 74,911.2
13. Hours Reactor Critical 282.5 2,729.5 51,878.2
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 219.3 2,561.8 49,869.5
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (hPIVH) 464,774 7,829,508 144,994,158
18. Gross Electrical Energy (hDVH) 150,650 2,707,440 48,556,530
19. Net Electrical Energy (MVH) 136,863 2,560,273 46,510,692
20. Unit Service Factor 30.5 59.0 66.6
21. Unit Availability Factor 30.5 59.0 67.1
22. Unit Capacity Factor (MDC Net) 17.1 53.0 56.7
23. Unit Capacity Factor (DER Net) 17.0 52.6 56.4
24. Unit Forced Outage Rate 0.0 13.3 13.3
25. Forced Outage Hours 0.0 0.0 0.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): None.
27. Ifcurrently shutdown estimated startup date: n/a Note: Cumualtive Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

'I ~ '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: July 1, 1993 COMPLETED BY: D. G, Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: June 1993 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 16 0 17 18 19 20 21 13 22 161 192 24 271 10 520 26 765 12 27 839 13 28 979 h

14 29 1097 15 30 1100 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1993 COMPLETED BY: D.G. Embree TELEPHONE: (509) 3774448 REPORT PERIOD: June 1993 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9346 5/01/93 S 500.7 C 4 n/a RC FUELXX Plant completed annual refueling outage R-8.

SUMMARY

WNP-2 returned to service from the annual refueling outage R-8.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other