Monthly Operating Rept for Dec 1992 for Wpps 2.W/930110 Ltr
ML17289B110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-93-010, GO2-93-10, NUDOCS 9301210276
Download: ML17289B110 (6)


Text

A<CEI.ERAVND DOCVMENT DIST VTION SYSTEM REGUL~Y INFORMATION DISTRIBUTI .. SYSTEM (RIDS)

FACIE:50-397

>>>>>>7 WPPSS Nuclear Project, Unit 2, Washington Public Powe DOCKET 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. ~ Washington Public Power Supply System BAKER,J.W.

~ Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

M crating rept for Dec 1992 for Nuclear Plant 2.

/930110 r. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 CLIFFORDiJ 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 D

AEOD/DSP/TPAB 1 1 NRRJ/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB 1 1 R 01 1 1 RGN5 1 1 EXTERNAL: EGSG BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 e~ P7X~~'~>~<

D A

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACI'HE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

'1 ~

r

)1 ~

C l

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 January 10, 1993 G02 010 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT DECEMBER 1992 Transmitted herewith is the Monthly Operating Report for the month of December 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours,

. Baker

-2 Plant Manager (MD 927M)

LBH/kam CC: Mr. W. H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute (qP t g)~ l<~

S301210276 921231 PDR ADOCK 05000397 PDR

~ OPERATING DATA REPORT WNP-2 DATE: January 1, 1993 DOCKET: 50-397

2. REPORTING PERIO: Dec-92 OUTAGE + ON-LINE HOURS: 744
3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486
4. LICENSED THERMAL POWER (MWt): .3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: None.
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY: None MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744.0 8,784.0 70,568.2
13. HOURS REACTOR CRITICAL 744.0 5,758.0 49,148.7
14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4
15. HOURS GENERATOR ON LINE 744.0 5,507.9 47,307.7
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2,458,719 17,548,828 137,164,650
18. GROSS ELECTRICAL ENERGY (MWH) 865,080 5,993,270 45,849,090
19. NET ELECTRICAL ENERGY (MWH) 829,402 5,692,379 43,950,418
20. UNIT SERVICE FACTOR 100.0% 62.7% 67.0%
21. UNIT AVAILABILITY FACTOR 100.0% 62.7% 67.6%
22. UNIT CAPACITY FACTOR (MDC NET) 102.7% 59.7% 57.0%
23. UNIT CAPACITY FACTOR (DER NET) 101.3% 58.9% 56.6%
24. UNIT FORCED OUTAGE RATE 0.0% 15.0% 13,3%
25. FORCED OUTAGE HOURS 0.0 969.5 7 273 3
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

Refuelin Ou e -8 startin A ril 1 1 for 45 da s

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: JANUARY 1, 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 I

UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: DECEMBER 1992 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURREN NONE

SUMMARY

WNP-2 operated routinely during December with no outages or significant power reductions.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF &H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG %161)

~ ERAGE DAILYUNIT PONER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: DECEMBER 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: DECEMBER 1992 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 1121 17. 1125 1121 18. 1118

3. 1127 19. 1121 1112 20. 1117 1127 21. 1118
6. 1124 22. 11]2 1126 23. 1114 1123 24. 1115 1112
10. 1120 26.

1058 27. 1118

12. 1038 28. 11]8
13. 1124 29. 1113
14. 1122 30. ] 118
15. 1122 31. I ] 14
16. 1125 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAIN THE APPARENT ANOMALY.