Monthly Operating Rept for Nov 1992 for Wnp,Unit 2.W/921215 Ltr
ML17289B036
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-265, NUDOCS 9212220254
Download: ML17289B036 (8)


Text

ACCEI ERAT DOCUMENT. DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMg AUTHOR AFFILIATION HUTCHISOA>L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1992 for WNP,unit 2 W/921215 ltr.

DISTRIBUTION CODE: IE2'4D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 CLIFFORDgJ 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLP LPEB10 1 1 NRR/DOEA/OEAB 1 1 E 01 1 1 RGN5 1 1 EXTERNAL: EG&G BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

0

$ L

~l

\

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 988 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 December 1$ 1992 GO2 Z6g U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT NOVEMBER 1992

'Transmitted herewith is the Monthly Operating Report for the month of November 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J. W. Baker WNP-2 Plant Manager (MD 927M)

LBH:kam CC: Mr. W. H. Lovelace, NRC, Washington DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J. T. Wheelock, INPO Mr. F. Yost, UtilityData Institute PgR ~>+

A Oc< 9ij'isp pSppp39~

P8fk+ Piad'zaxw 220008 g

l

'] l ~

f

OPERATING DATA REPORT WNP-2 DATE: December 1, 1992 DOCKET: 50-397

2. REPORTING PERIOD: Nov-92 OUTAGE + ON-LINE HOURS: 720 UTILITYCONTACT: Leonard Hutchison (509) 377-2486 4 LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: None.
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY: None.

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720.0 8,040.0 69,824.2
13. HOURS REACTOR CRITICAL 720.0 5,014.0 48,404.7
14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4
15. HOURS GENERATOR ON LINE 666.2 4,763.9 46,563.7
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 . 381.7
17. GROSS THERMAL ENERGY (hAVH) 2,092,588 15,090,109 134,705,931
18. GROSS ELECTRICAL ENERGY (MWH) 712,510 5,128,190 44,984,010 19, NET ELECTRICAL ENERGY (MWH) 678,919 4,862,977 43, 121,016
20. UNIT SERVICE FACTOR 92.5% 59.3% 66.7%
21. UNIT AVAILABILITY FACTOR 92.5% 59.3% 67.2%
22. UNIT CAPACITY FACTOR (MDC NET) 86.9% 55+7% 56.5%
23. UNIT CAPACITY FACTOR (DER NET) 85.7% 55.0% 56.1%
24. UNIT FORCED OUTAGE RATE 0.0% 16.9% 13.5%
25. FORCED OUTAGE HOURS 0.0 969.5 7273 3 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

Refuelin uta e R- tartin A ril 16 1 for 4 da

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

A RAGE DAILYUNIT POWER LE L DOCKET NO.: 50-397 UNIT: WNP-2 DATE: NOVEMBER 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: NOVEMBER 1992 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 1087 17. 1092

2. 1089 18. 1092 1094 19. 1090 1090 20. 1057 1095 21. 48
6. 1084 22.

1080 49

8. 1090 24. 191
9. 1093 727
10. 1092 26. 1088 1092 27. 1109
12. 1091 28. 1125
13. 1060 29. 1126
14. 1079 30. 1116
15. 1092
16. 1090 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: DECEMBER 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 UNIT SHUTDOWNS / REDUCTIONS REPORT PERIOD'OVEMBER 1992 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE 11/21/92 S 53.8 B 1 EB ELECON Generator was removed from service for cleaning ofhighvoltage insulators due to buildup of chemical deposits from cooling tower drift. Also, repaired source of Dryweil FDR leakage (RFW-V-10B). The plant was then returned to service.

SUl'@MARY:

WNP-2 incurred one scheduled outage in November as described above.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG -0161)

0 4 ~

~ ~

~ y A

4