Monthly Operating Rept for Oct 1992 for Washington Nuclear Plant 2.W/921110 Ltr
ML17289A991
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-252, NUDOCS 9211240122
Download: ML17289A991 (5)


Text

ACCELERATED D VTION DEMONSTRATION SYSTEM REGULAT INFORMATION DISTRIBUTIO~YSTEM (RIDS)

Atl DOCKET ¹ PACID:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly ope Plant 2 921110

'ept tr.

for Oct 1992 for Washington Nuclear DISTRIBUTION'ODE: IE24D COPIES RECEIVED:LTR ENCL 'IZE:

TITLE: Monthly Operating Report (per Tech Specs) D NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 DEANiW. 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR/DJ P.Q/&PEB10 1 1 D NRR/DOEA/OEAB RGN5 1

1 1

1 REG FILE Ol j 1 1 EXTERNAL EGStG BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

A' NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Be 968 ~ 3000 George WasbIngion Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 Docket No. 50-397 November 10, 1992 602-92-252 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT OCTOBER 1992 Transmitted herewith is the Monthly Operating Report for the month of October 1992 as required by our Technical Specifications 6.9.1.6.

Very truly ours, J.. Baker

-2 Plant Manager (MD 927M)

LBH:bap cc: Mr. W.H. Lovelace, NRC, Washington, DC Mr. J.B. Martin, NRC Region V Ms, Dottie Sherman, ANI, Hartford, CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. F. Yost, Utility Data Institute 9211240122 921031 PDR ADOCK 05000397, R PDR

~~AQQI 3

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: NOVEMBER 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: OCTOBER 1992 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 1079 17. 1090 1032 18. 1085

3. 1069 19. 1080 4, 1089 20. 1079
5. 1091 21. 1073 1093 22. 1080
7. 1094 23. 1063 1086 1085 1074 1086
10. 1085 26. ]087 1086 27. 1090
12. 1085 28. 1093
13. 1088 29. 1090
14. 1091 30. 1082
15. 1098 1085 INSTRUCTIONS
16. 1090 ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100% LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

OPERATING DATA REPORT e

WNP-2 DATE: November 1, 1992 DOCKET: 50-397

2. REPORTING PERIOD: Oct-92 OUTAGE + ON-LINE HOURS: 745
3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486 4 LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 745.0 7,320.0 69,104.2
13. HOURS REACTOR CRITICAL 745.0 4,294.0 47,684.7
14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340 4
15. HOURS GENERATOR ON LINE 745.0 4,097.7 45,897.5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2,466,291 12,997,521 132,613,343
18. GROSS ELECTRICAL ENERGY (MWH) 846,470 4,415,680 44,271,500
19. NET ELECTRICAL ENERGY (MWH) 806,892 4,184,058 42,442,097
20. UNIT SERVICE FACTOR 100.0% 56.0% 66.4%
21. UNIT AVAILABILITY FACTOR 100.0% 56.0% 67.0%
22. UNIT CAPACITY FACTOR (MDC NET) 99.8% 52.7% 56.2%
23. UNIT CAPACITY FACTOR (DER NET) 98.5% 52.0% 55.8%
24. UNIT FORCED OUTAGE RATE 0.0% 19.1%, 13.7%
25. FORCED OUTAGE HOURS 0.0 969.5 7273 3
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

Refuelin outa e R-8 startin A ril 16, 1993 for 45 days.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE'

DOCKET NO.: 50-397 UNIT NAME: WNP-2 I )

DATE: NOVEMBjIR 1', 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 UNIT SHUTDOWNS / REDUCTIONS REPORT PERIOD: OCTOBER 1992 NO. DATE TYPE HOURS R~EA ON METHOD ~LER N SYSPEM COMPONENT AU & CORRECTIVE ACTIONTOPREVENTRE URRE None SIJMMARY: WNP-2 operated routinely during October with no outages or significant power reductions.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBITF & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG-0161)