ML17289A930

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1992 for Washington Nuclear Plant 2.W/921012 Ltr
ML17289A930
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1992
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-239, NUDOCS 9210220272
Download: ML17289A930 (7)


Text

~cczr,za.~Tao >Sea>8VrrOw ozmc "~sra~rrOx Svsrzm REGULAT INFORMATION DISTRIBUTION YSTEM (RIDS)

SN DOCKET FAC~IL':50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o Plant

'eptr.

921012 for Sept 1992 for Washington Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 DEAN,W. 1 1 INTERNAL: ACRS. 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR -DLP. LPEB10 1 1 NRR/DOEA/OEAB 1 1 EG FIL 01 1 1 RGN5 1 1 EXTERNAL EG6tG BRYCE i J H 1 1 NRC PDR 1 1 NSIC 1 1 S

Car% go (~ 334 A,

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER'OF COPIES REQUIRED: LTTR 24 ENCL 24

V.

J n I

0 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96'8 ~ 3000 George WasbIngton Way ~ R(cbland, 1Pasblngron 99352-0968 ~ (509) 372-5000 Docket No. 50-397 October 12, 1992 G02-92-239 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT SEPTEMBER 1992 Transmitted herewith is the Monthly Operating Report for the month of September 1992 as required by our Technical Specifications 6.9.1.6.

Very truly yours, J.W. aker

~ ~

WNP-2 Plant Manager (MD 927M)

LBH:bap CC: Mr. W.H. Lovelace, NRC, Washington, DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Hartford, CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. F. Yost, Utility Data Institute p

S3000" PDR ADOC q210220275 05ppp397 PDR gpss

~l

OPERATING DATA REPORT WNP-2 t

DATE: October 1, 1992

1. DOCKET: 50-397
2. REPORTING PERIOD: Sep-92 OUTAGE + ON-LINE HOURS: 720
3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486
4. LICENSED THERMAL POWER.(MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

n'0.

POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

11. REASONS FOR RESTRICTIONS, IF 'ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720.0 6,575.0 68,359.2
13. HOURS REACTOR CRITICAL 720.0 3,549.0 46,939.7
14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4
15. HOURS GENERATOR ON LINE 720.0 3,352.7 45,152.5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2,297,678 10,531,230 130,147,052
18. GROSS ELECTRICAL ENERGY (MWH) 786,590 3,569,210 43,425,030
19. NET ELECTRICAL ENERGY (MWH) 748,199 3,377,166 40,887,006
20. UNIT SERVICE FACTOR 100.0% 51.0% 66. 1%
21. UNIT AVAILABILITY FACTOR 100.0% 51.0% 66.6%
22. UNIT CAPACITY FACTOR (MDC NET) 95.8% 47.3% 55.7%
23. UNIT CAPACITY FACTOR (DER NET) 94.5% 46.7% 55.4%
24. UNIT FORCED OUTAGE RATE 0.0% 22.4% 13.9%
25. FORCED OUTAGE HOURS 0.0 969.5 7273 3
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:

None.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: OCTOBER 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: SEPTEMBER 1992 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 554 17. 1086

2. 1032 18. 1080 1082 19. 1078 4, 1088 20. 1071 973 21. 1073
6. 1076 22. 1076
7. 1102 23. 1071
8. 950 24. 1079
9. 880 1062
10. 955 26. 1073 977 27. 1091
12. 1075 28. 1089
13. 1087 29. 1084
14. 1085 30. 1080
15. 1082 31.
16. 1084 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATI'.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITY IS USED FOR THE NET ELECTRICAL RATING OF THE UNIT, THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: OCTOBER 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: SEPTEMBER 1992 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTIONTO PREVENT RECURRENCE None

SUMMARY

WNP-2 operated routinely during September with no outages or significant power reductions.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED'-SCHED, A-EQUIP FAILURE F-ADMIN I-MANUAL EXHIBITF & H B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT