OPERATING DATA REPORT WNP-2 DATE: 01-May-92

1. DOCKET: 50-397
2. REPORTING PERIOD: Apr-92 OUTAGE + ON-LINE HOURS 719
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 719 2903 64687. 2
13. HOURS REACTOR CRITICAL 416. 0 2085.0 45475.7
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 410. 6 2042.6 43842.5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1337639 6588250 126204072
18. GROSS ELECTRICAL ENERGY (MWH) 452340 2233530 42089350
19. NET ELECTRICAL ENERGY (MWH)
  • 430311 2135847 40393886
20. UNIT SERVICE FACTOR 57. 14 70. 4>o 67. 8'6
21. UNIT AVAILABILITYFACTOR 57. 1>o 70. 4>o 68.44
22. UNIT CAPACITY FACTOR (MDC NET) 55.2% 67.8% 57.1%
23. UNIT CAPACITY FACTOR (DER NET) 54. 4>o 66.9% 56.8w
24. UNIT FORCED OUTAGE RATE 0 ~ 0>o 21 ~ 34 13.5>
25. FORCED OUTAGE HOURS 0.0 552.0 6855.8
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
  • Revision 1 This is to revise net electrical energy for, April as shown above.

It was reported as 430411 on original report.