Monthly Operating Rept for Dec 1991 for Washington Nuclear Plant 2.W/920110 Ltr
ML17289A264
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1991
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-92-007, GO2-92-7, NUDOCS 9201230227
Download: ML17289A264 (7)


Text

ACCELERATED DI RIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 "AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATlON

SUBJECT:

Monthly Plant 2.

o 920110

'ept tr. for Dec 1991 for Washington Nuclear D

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID 'CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 D ENG, P. L. 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 .R+DL LPEB10 1 1 N RR/ DOEA/OEAB 1 1 REG FILE 01 1 1 RGN5 1 1 EXTERNAL EGGG BRYCE 1 J ~ H NRC PDR 1 1 NSIC gp/5 I/ 'F R

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Bar 96'8 ~ 3000 George Wasbtngton Way ~ Rtcbland, 1Pasbtngton 99352-0968 ~ (509) 372-5000 Docket No. 50-397 January 10, 1992 G02-92-007 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT DECEMBER 1991 Transmitted herewith is the Monthly Operating Report for the month of December 1991 as required by our Technical Specifications 6.9.1.6.

Very truly yours,

. Baker NP-2 Plant Manager (MD 927M) bap Enclosure CC: Mr. W.H. Lovelace, NRC, Washington DC Mr. J.B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Parmington CT Mr. C. Sorensen, NRC Resident Inspector (901A)

Mr. J.T. Wheelock, INPO Mr. P. Yost, UtilityData Institute 9201.230227 911231

PDR ,ADQCK 05000397

~

R " -' PDR

//(

~ ~

1 o II "I J~

t AVERAGE DAILYUNIT POWER LEVEL t

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: JAN 1, 1992 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: DECEMBER 1991 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) 1084 17. 833 1085 18. 1075 1081 19. 1091 4, 1080 20. 531 1075 21.

6. 1066 22.

1083 23.

1078

9. 1076
10. 1086 589 1079 27. 1066
12. 1071 28. 1094
13. 1085 29. 1094
14. 1090 30. 1092
15. 1093 31. 1091
16. 1088 INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.

THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 1009o LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.

OPERATING DATA REPORT WNP-2 Ol-Jan-92

1. DOCKET: 50-397
2. REPORTING PERIOD: Dec-91 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1129
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1085
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

None

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY: None MONTH YEAR CUMULATIVE
12. REPORT PERIOD HOURS 744 8760 61784.2
13. HOURS REACTOR CRITICAL 635.4 4406.5 43390.7
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 611.8 4196.7 41799.8
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1981966 13266797 119615822 18 'ROSS ELECTRICAL ENERGY (MWH) 672040 4454180 39855820
19. NET ELECTRICAL ENERGY (MWH) 642997 4229869 38258039
20. UNIT SERVICE FACTOR 82.24 47.94 67.74
21. UNIT AVAILABILITYFACTOR 82.2% 47 '+o 68 '+o
22. UNIT CAPACITY FACTOR (MDC NET) 79.74 44 '>o 56.6~o
23. UNIT CAPACITY FACTOR (DER NET) 78.64 43.9<o 56.3>o
24. UNIT FORCED OUTAGE RATE 17. 8>o 40 '+o 13 '+o
25. FORCED OUTAGE HOURS 132. 2 2902.6 6303.8 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE I DURATION)

Refuelin outa R-7 startin A ril 18 1992 for 75 da s.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

DOCKET NO.: 50-397 >

I UNIT NAME: WNP-2 DATE: JANUARY-1, 1992-COMPLETED BY: LB HUTCHISON ~

TELEPHONE: (509) 377-2486 UNIT SHUTDOWNS / REDUCTIONS REPORT PERIOD: DECEMBER 1991 NO. DATE TYPE HOURS REASON METHOD LER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRE 91-09P 12/17/91 F 0 A 5 A power reduction to 63% thermal power was necessitated by high and rising conductivity of the reactor coolant. After one circulating water pump was removed from service, the conductivity returned to normal and the plant was returned to full power.

91-10 12/20/91 F 132.2 A HC HTEXCH The plant was shutdown because of high and rising conductivity of the reactor coolant. A condenser tube leak was repaired and other minor maintenance was performed in drywell prior to returning plant to service.

SUMMARY

WNP-2 incurred one forced outage and one power reduction in December as described above.

TYPE REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBIT F & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG<161)

~. ~

v