Forwards marked-up Regulatory Info Tracking Sys for Implementation of Generic Items,Per Request.Completed Listing,W/Status of All Actions Identified,Will Be Provided by 860515ML17216A573 |
Person / Time |
---|
Site: |
Saint Lucie |
---|
Issue date: |
06/06/1986 |
---|
From: |
Woody C FLORIDA POWER & LIGHT CO. |
---|
To: |
Tourigny E Office of Nuclear Reactor Regulation |
---|
References |
---|
TASK-***, TASK-OR, TASK-TM GL-83-43, GL-84-15, IEB-79-06, IEB-79-08, IEB-79-6, IEB-79-8, IEB-80-04, IEB-80-4, IEB-86-239, L-86-239, NUDOCS 8606100239 |
Download: ML17216A573 (12) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
t j I
,RERULAY IQFQRNATIDN DIBTRIBVTIIQBYBTEN <R IDB)
,'(
'CCESSION BR: SbOS100234U DOC.IDATE: SS)OS/OS. NOTARIZED: Nb ~ DaamT FAC IL: 50-335 St. Lucie Planti Unit ii Florida Power 8r Light Co. '500033$
50-389 St. Lucie Planti Unit 2I Florida Power Zc Light Co. 05000389 AUTH. NAME AUTHOR AFFXLIATXON MOODY~ C. O. Florida Power 8r Light Co.
REC IP. MANE RECIPXENT AFFILIATION TOURXQNYA E. G. PMR Prospect Directorate 8
SUBJECT:
Forwards marked-up regulatory info tracking sos for implementation of generic items> per request'. Completed listingA e/status of al I actions i denti f i ed. toi l 1 be provided bg Sb0515.
DIBTRIBUTIQN CQDE: AOOID CQPIEB RECEIVED: LTR t ENCL I SIZE:
TXTLE: OR Submittal: General Distribution NOTES:
RECIPIENT COPlES RECIPIENT COPIES ID CODE/NAl'1E LTTR ENCL ID CODE/NANE LTTR ENCL PMR-8 ADTS 0 PMR-8 EB 1 PMR-8 PEXCSB 2 2 PMR-8 FOB PMR-8 PDB LA 0 PMR-8 PDB PD 01 5 5 TOURIGNY E 1 1 PMR-8 PEICSB PMR-8 RSB INTERNAL: ADN/LFNB 0 ELD/HDS2 0 NRR/DHFT/TSCB 1 NRR/GRAS 0 04 RGN2 EXTERNAL: 24X 1 1 EQ8(Q BRUSKE> S 1 1 LPDR 03 1 NRC PDR 02 NSXC 05 1 TOTAL NUBBER OF COPIES REQUIRED: LTTR 25 ENCL Zo
I>>'f
','r,:j(.,<<( f, 'pg+'~gA kkf~o0>>..'4>>ic C)9-'i ~ii "'<<"
Qc~j
'c c i C')
0(-'(5~,0 ~ 5)-) l'(l() r l > '"'5 ')c>>c) '~c) 1'TDL Oc: )<) (3.5 '.3,>>,; ',~
~ECi>l~r'0 . )'3:l (l<<) r. l . z '5 ~ '.5 5;" .5
( .' . 5 'c> i 5'K "l o k>>5 (,"5,'l Fcl:H ) ().') N,cc:i: !T(lA J, g l, ig .;',.55>>Oc,,;4
('>>:<
i, .<< ,(>,:3,X'(I Udl.c
.' D
l'cQKTAK <<5, '1l'if<<l<'c <<.
8'l lV'.lK'cf'.i rO 3>>>> 'irU .5 )""J 5"') "c "
- 3 . 5,V<<rc:KRl,"<<jl'c) k ! <<!, >>cubi 8 35) 5 "'"!AL o'YQ+&KUp')')'v f)o)f'T)cA'5 '"'>3'4)K"~c
!)9;f ) <<c!b)c) 3 )9()<<)9") )~3q ctfP>>0~ l 3r,,oc()<<c Rc) AQifCid'0:J5>'>Kit<<<<X
<<)~i b) v"5 'fq -)cl ) . ice) cbo E k."i .)0 )', r)p Lw+ 36>>~ K'5 3 0 c'.UfF;"f,.clice <<)Aire' ~
K
. ',,'P>>8 !) d ~
cX )'>>', ) 3W;.5 ~: 1,.>> a..Vra-;3~R ';,." la:> a>uah .anna V<<aKn>>ad)"'Kn
()i",>>,V d;" 5., i(K f()')'5)(')OQ k. VSXmduQ gO . l 1CT)'c'.'.1 0.! Ã)
) f~f.1) 'h J.D..~) << l'lfi 4 ",5. 3B">
.,50,: =l< ihVA l(93'-3 (KK G3 >K-RM'! 5', 5'(1~c Q. 5!4<5) 4Q 1 '-HMR GU) K3cl 6" c>>N'l cl5 (crl <<-(>."-'.- PMh h l NG') 6 HH~f 5 iic!.P'~'5 6-PA'l -l cYVc'3K}ceil,lg
- 8. $ iM;
)rt<RJ4H4A: JI<<V.')'cc '( N ',
O':Yc! )'~ 'HGX:4'cl'<<
f(3 I !K-5 ) lA
<<'Mc UR ')r5'03 .IAl>>5A:3 I'X.~
8(>~c .)RN H(l'1 l 5.5 col
P. OX 14000, JUNO BEACH, FL 33408 iii~lhxz .
FLORIDA POWER & LIGHT COMPANY B $ 888 L-86-239 Office of Nuclear Reactor Regulation Attention: Mr. E. G. Tourigny, Project Manager P WR Project Direc torate 738 Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Tourigny:
Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Im lementation of Generic Items Attached is the marked up generic item listing you requested. As discussed with you, a status was not provided where additional information is required to define the specific licensing action or where additional NRC action is pending following the FPL submittal.
Your request requires a careful review of all correspondence in our licensing files to determine the status of each generic item, and completion or projected completion dates. This is not a minor effort and could not be completed in the time you requested (approximately one month).
Accordingly, we consider the markup provided you to be a working document until our review can be completed. We will submit a completed marked up listing, with the status of all actions identified, to you by July l5, l986. Any changes to the attached listing will be noted in that final submittal. In the meantime, we intend to work with you to resolve any questions regarding the status of the open items.
If you have any questions, please call us.
Very truly yours, C. O. Woody Group Vice President Nuclear Energy COW/MAS/gp Attachment 8606100239'60606 PDR ADOCK 05000335 p PDR TCG5/008/ I PEOPLE... SERVING PEOPLE
.'-1208731-001 REGULATORY INFORNATI ON TRACKING SYSTEN PAGE NO P' 459 FACIL ITY IMP L EHENTATI ON 03/31/86
'ACI L ITY: ST L UCI E 1
'LANT LOCATION- 12 HI SE OF FT. PIERCEP FLA LICENSED POWER: 2700 NWT PROJECT MANAGER: D. SELLS 00CKET NUHBER4 050-00335 DESIGN POWER: 0830 NWE BRANCH CHIEF: A. THADANI
,RCH/ENGINEER: EBASCO NSSS VENDOR: COMB LIC. ASSISTANT: P. KREUTZER E INSPECTOR: R. CRLENJAK LIC ACT LICENSEE
~C~O 11PA A ~CO ~SA~U ~A I06726 A-01 10 CFR 50.55 A(G) ISI 01/01/70C I070443 A-01 10 CFR 50.55,A(G) - ISI 02/01/78C 108155 A-02 APPENDIX I- ALARA 08/18/83C 107044 A-03 SECURITY. REVIEWS-HODIFIED ANENDNENT PLANS 02/28/79C I11392 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 04/21/80C I10623 A-10 CONTINGENCY PLANNING 09/18/80C I1 0619 A-11 GUARD TRAINING PLANS 1 1/03/81 C 110621 A-12 VITAL AREA ANALYSIS 04/14/82C I08292 A-140 10CFR" 50.55 A(G) - INSERVICE TESTING 04/02/85C l13094 A-15 QUALITY ASSURANCE REQUEST REGARDING DIESEL GENARAT 04/15/80C I47111 A-16 QUALIFICATIONS OF EXANINATIONP INSPECTION> TESTING 12/16/81C l51135 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDEN 05/15/86 P4K Q'gopk PE4ly(dg l55742 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 12/06/85C Cathe t-E~ L>Pg l59144 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 06/15/86 PRo~Tey l59985 A-21 10 CFR 50.61'RESSURIZED THERMAL SHOCK RULE 04/30/86 CAPAP<KTR oi/gg l06783 B" 02 FIRE PROTECTION 07/27/79C 110813 B-03 PWR NODERATOR DILUTION 02/26/79C 106826 B-04 REACTOR VESSEL'VERPRESSURE PROTECTION 09/16/83C 107251 B-07 STEAN GENERATOR FEEDWATER FLOW INSTABILITY 02/07/80C 108171 B-08 PWR HPSI-LPSI FLOW RESISTANCE 06/19/79C
<-1208731-001 REG'ULATORY INFORMATION TRACKING SYST PAGE NO.. '6 FACILITY IMPLEMENTATION 03/31/8 jj LUCIE 1 (CONTINUATION)
~CO 111305
~A B"08 PWR HPSI-LPSI FLOW RESISTANCE LIC
~COM ~
ACT 06/19r79C LICENSEE
~SLY 107841 B-09 CHARGING SYSTEMS PIPE VIBRATIONS 12/29/78C 108913 B-10 'EA GUIDE TUBE WEAR 07/06/81C 112151 B" 16 EMERGENCY PLANNING AND REVISIONS 06/01/81C ll 0621 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 02/06/81C N6685 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 1 0/1 4/81
. l1 0315 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION C'2/06/81C l10377 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C l10022 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 02/04/81C I%6686 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 10/16/81C I10052 B-23 DEGRADED GRID VOLTAGE 05/03/83C 102593 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 05/27/83C l10213 B-2% VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 01/01/70C l11307 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POW 02/09/81C I10252 B-26 INADVERTANT SAFETY INJECTION DURING COOLDOWN 03/17/81C l08920 B-36 RESISTANCE TEMPERATURE DETECTOR (RTD) RESPONSE C 08r28/81C I07319 B-37 STEAM GENERATOR TUBE DENTING AND SUPPORT PLATE MOD 02/02/81C l10809 B-39 PWR PRESSURE TEMPERATURE LIMIT TECH SPECS 11/13/80C 111108 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 07r11/84C I%3852 B"61 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S 02/21/85C I%3853 B"41 FIRE PROTECTION FINAL TECH SPECS (INCLUDES SER S 02/21/85C l11731 B-42 TMI FOLLOW UP ALL PLANTS 01/1 9/81 C l11794 B-43 PWR FEEDWATER LINE CRACKS 01/04/80C
!-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM PAGE NO.'-'.. 461 FACILITY INPLENENTATION 03/31/86 IT LUCIE 1 (CONTINUATION)
'C~O LIC
~O~P ACT
~S~US 'AT LICENSEE 143152 B-43 PHR FEEDHATER LINE CRACKS 05/25/82C 112366 B-44 LESSONS LEARNED INPLENENTATION 06/02/80C 112887 B"45 HASH 1400 EVENT Vi "PRIMARY COOLANT SYSTEN PRESSUR 04/20/81C 112600 B-46 ANALYSIS OF TURBINE DISC CRACKS 08/28/81C 112729 B-47 ECCS) CLAD SHELLING AND RUPTURE 09/10/80C 112739 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE, 09/02/82C 143962 B-51 EVALUATION OF BULLETIN 79-06 AND 79-08 06/'12/81C 143630 B-52 REVIEH OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 04/06/81C 142118 B"57 DHR CAPABILITY 12/21/82C 142900 B-59 MASONRY HALL DESIGN 06/26/85C 142492 B-60 ENVIRONHENTAL QUALIFICATION 11/1 5/84C 142707 B-61 LOSS OF NON CLASS IE I&C POHER 07/28/82C 142778 '-62 ESF RESET CONTROL DESIGN DEFICIENCY 04/05/82C 142252 B-66 NATURAL CIRCULATION COOLDOHN 04/26/83C 146860 B-69 IEB 80-4 MAINSTEAN LINE BREAK HITH CONTINUED FEEDH 01/17/83C 149760 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 03/02/84C 151325 B-74 THERMAL SHIELD FOLLOH UP ANALYSIS 03/14/84C 152802 B-76 ITEN 1.1 POST TRIP REVIEHJ PROGRAN DESCRIPTION & 12/17/85C Ce rnPiEvE. I 152883 B-77 ITEN 2.1 - EQUIPNENT CLASSIFICATION & VENDOR INTER 04/15/86 X/95'o%pc.a~
~RC ACTloQ PEp)hp)q 152964 B-78 ITENS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 12/23/85C IatSS < 0</ag 153045 B-79 ITEN 3.1.3 POST MAINTENANCE TESTING CHANGES TO 10/25/85C Core, Para. Io/~
1531 00 B-80 ITEN 4.1 REACTOR TRIP SYSTEN RELIABILITY VENDO 12/17/85C Corn Pr-E-m. IX/85 153153 B"81 ITENS 4.2.1 & 4 2 2 PREVENTATIVE NAINT PROG FOR R 05/15/86 CoiAP ~~ oS/8(
. l-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM PAGE NO.: 66 FACI L ITY IMP L EMENTAT I ON 03/31/8 iT LUCIE 1 (CONTINUATION)
~C~O ~$ LIC
~CO ACT
~SJUS LICENSEE
~A 154571 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 06/21/85C HRc ACT(og Pupa(gq 153635 B-85 SALEM ATHS 1.2 DATA CAPABILITY 06/15/86 ~Pl.E~ oS/a4 153718 B-86 SALEM ATHS 2.2 S-R COMPONENTS 1 2/01/86 Pkc Saeva,y >>/ss 153801 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 12r17/86 ~PLATE. isles 153884 $ -88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/25/85C
<o/8S'Rc 153940 B-89 SALEM ATHS 6.2.3 & 4.2.0 LIFE COMPONENTS 12/31/86 ~<top! Pag~l~
151111 B"92 SALEM ATHS 6.5.1 DIVERSE TRIP FEATURES 12/17/85C Comp~gm i~/ec l51028 B"93 SALEM ATWS 6.5.2 & 6.5.3 TEST ALTERNATIVES 12/01/86 Pawacva.> l486 l08250 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME . 01/16/82C i08924 C-06 PUMP SUPPORT-LAMELLAR TEARING 04/17/81 C 108911 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 06/27/79C I08083 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 03/014/85C 110069 C-12 BORON SOLUBILITY DURING LONG TERM COOLING FOLLOHIN 03r29r82C 163648 C-14 AUXILIARY FEEDWATER SEISMIC QUALIFICATION 11/08/82C 152273 C-15 CONTROL OF HEAVY LOADS PHASE II (FOLLOHUP OF MPA 06/28/85C c~~a, 158091 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN 12r11r85C Compt,p~ 1o(gg 108915 D" 06 PEAKING MODEL CHANGE FOR CE REACTOR CORE 05/26/78C 108923 D-10 ASYMMETRIC LOCA LOADS 06/15/86 I10101 D-11 FISSION GAS RELEASE 10/13/78C l12319 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 01/31/80C l13036 D-17 DEFINITION OF OPERABLE 05/28/81 C l55905 D-19 DIESEL GENERATOR RELIABILITYTECH SPECS (GL 84-15) 03/15/86 111306 E-03 CORE RELOADS REQUIRING PRIOR NRC APPROVAL 05/27/79C
t-1208731-001 REGULATORY INFORMATION TRACKING SYSTEN PAGE NS. ~ 46 FACIL ITY IMP L ENENTATI ON 05/31/8 iT LUCIE 1 (CONTINUATION)
LIC ACT LICENSEE r~g ~~EUZK XGQUS EQF
$ 08918 E-06 CEA POSITION INDICATION FAILURES CE 04/27/82C
$ 11308 E-07 REACTOR PROTECTION SYSTEN LOGIC CE 03/31/82C 144054 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/26/82C 1441 25 F"02 I .A. 1 .3 SHIFT NANNING 06/30/83C
'l44196 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 03/24/82C 144267 F-04 I.C.1.2/3.A ENERGENCY OPERATING PROCEDURES GENERIC 06/07/84C Ys4337 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG . 05/15/86 147250 F-06 I.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/04/82C 147322 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI 02/04/82C 151205 F-08 I.D.1.1 DETAILED CONTROL ROON DESIGN REVIEH PROGRA 10/10/84C 151285 F-09 I.D.2 SAFETY PARANETER DISPLAY SYSTEM 06/1 1/85C PRo JOE b gyp
'I44404 F" 1 0 I I. B. 1 RCS HIGH POINT VENTS 09/16/83C Yi7973 F-11 I I.B. 2 PLANT SHIELDING 01/14/83C Yi4475 F-12 II.B.3, POST ACCIDENT SAMPLING 09/28/83C Vi4546 F"13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 03/24/82C
$ 44617 F-14i II.D.1 RV AND SV TRAINING 06/15/86 Come~avs. <S/aL V<4667 F-15 II.E.1.1 AFH SYSTEM EVALUATION 09/14/82C Yt3378 F-16 II.E.1.2 .1 AFW SYSTEM INITIATION 09/14/82C Yt4748 F-17 II . E. 1 . 2 .2 AFN SYSTEN FLOH INDICATION 09/14/82C 144814 F-18 II.E. 4.1 DEDICATED HYDROGEN PENETRATION 10/20/81C N4885 F-19 II.E. 4. 2 CONTAINNENT ISOLATION DEPENDABILITY 05/27/83C Yi4956 F-20 I I . F. .
1 1 NOBLE GAS NONITOR 12/09/81C VI5027 F-21 II.F. 1 .2 IODINE/PARTICULATE SAMPLING 12/09/81C
4-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM PAGE NO.'l'6 FACILITY IMPLEMENTATION 03/31/8 ST LUCIE 1 (CONTINUATION)
QK ~O'~ LIC
~CO l~P ACT
~~U LICENSEE DllD
%5098 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 01/07/82C
%7634 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 08/23/83C
%7705 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 08/23/83C 147776 F-25 II.F.1.6 CONTAINMENT HYDROGEN MONITOR 08/23/83C 145168 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 06/20/85C
%6905 F-30. II.K.2.13 THERMAL-MECHANICAL REPORT 06/06/84C 147816 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 10/05/83C h
145266 F-36 II.K.3.1 AUTO PORV ISOLATION 10/06/83C
%5312 F-37 I I. K. 3. 2 REPORT ON PORV FAILURES 10/06/83C
%5378 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 04/06/82C 145433 F-39 I I.K.3. 5 AUTO TRIP OF RCPS 02/08/83C 145664 F"47 II.K.3.17 ECCS OUTAGES 08/08/83C
%8449 F-53 II.K.3.25 POHER ON PUMP SEALS 09/30/82C
%5861 F-57 II.K.3.30 SB LOCA METHODS 06/26/85C-448200 F-58 II.K.3. 31 COMPLIANCE HITH 10 CFR 50. 46 06/26/85C
%5980 F-63 I I I.A. 1 . 2 TECHNICAL SUPPORT CENTER 0'7/1 5/86 146051 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 07/15/86 146123 F-65 III.A.1.2 EMERGENCY OPERATIONS FACILITY 07/15/86 146195 F-66 III.A.1.2 NUCLEAR DATA LINK 07/30/82C
%6267 F-67 III.AD 2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/11/83C
%6339 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 07/15/86 446410 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 02/23/82C
%6479 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 03/11/82C
t-1 208731-001 REGULATORY INFORNATI ON TRACK I NG SYS'TEN PAGE NO. $ ci6 FACILITY IMPLEMENTATION 0$ /31/8 iT LUCIE 1 (CONTINUATION) f~ANO. ~P LIC
~CO ~~
ACT LICENSEE
$ 56167 F-71 I.D.1.2 DETAILED CONTROL ROON REVIEW (FOLLOWUP TO 05/15/86 PRo3~vE.t f987
%9693 G-01 REACTOR COOLANT PUNP TRIP (D660 - II.K.3.5) 06/15/86 W< A<Tlog Pepy~zq
-1208731-001 REGULATORY INFORMATION TRACKING SYSTEM PAGE NO. -'46(
FAG IL ITY INP L ENENTATI ON 03/31/8(
ACILITYI ST LUCIE 2 LANT LOCATIONS 12 OCKET NUHBERs RCH/ENGINEERS E INSPECTOR>
NI SE 050-003'89 EBASCO R. CRLENJAK OF FT.. PIERCE> FLA LICENSED POWERS DESIGN POWER:
NSSS VENDOR>
2700 0830 CONB HWT HWE BRANCH CHIEFS LIC. ASSISTANT:
PROJECT HANAGERI D. SELLS THADANI P. KREUTZER LIC ACT LICENSEE h< 8o ~CO XGQ~~ 2hXK 51136 A-17 INSTRUHENTATION TO FOLLOW 1HE COURSE OF AN ACCIDEN 05/15/86 HR(- ACylopl 557(43 591('45 A"18 A-20 TECH SPECS 10 CFR AFFECTED BY 50.62 50.72 AND 50.73 (GL 83-43)
OPERATING REACTOR REVIEWS 12/06/85C 06/15/86 Co((l PLE'fE, u.taS'mend. 6 0 fence TE.~ BR7 59986 A-21 10 CFR 50.61i PRESSURIZED THERMAL SHOCK RULE 0(I/30/86 QQPLF TK, at/86 52803 B-76 ITEN 1.1 POST TRIP REVIEWS PROGRAM DESCRIPTION & '2/17/85C 0 eP(-ET@. lX/85'IRE 5288(4 B-77 ITEN 2.1 EQUIPMENT CLASSIFICATION & VENDOR INTER 0(l/15/86 Act(oN ~0lgq i
52965 B-78 ITEHS 3.1.1 & 3.1.2 -POST HAINTENANCE TEST PROCEDU 12/23/85C Coolpa~ lL/85 /+(Q.
530(46 B-79 ITEN 3.1.3 POST MAINTENANCE TESTING CHANGES TO 10/25/85C CoPIETE (o($ 5 53101 B-80 ITEN 0 1 REACTOR TRIP SYSTEM RELIABILITY VENDO
~ 12/17/85C &PLETE u/85 5315(4 B-81 ITENS (4.2.1 & (4.2.2 -PREVENTATIVE NAINT PROG FOR R 05/15/86 0oolP~m o3/ga 54572 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 06/21/85C ggC ~lag ~lg~
53636 B-85 SALEM ATWS 1.2 DATA CAPABILITY 0 (I/1 5/86 Comp~~ ~s/s6 53719 B-86 B-87 SALEN ATWS 2.2 S-R CONPONENTS
'3.2.1 & 3.2.2 S-R CONPONENTS 12/01/86 12/17/85C Pl>of ec1'5 0 CotqPI.g.gg.
i.ys6
<~/s5
~
53802 SALEH ATWS 53885 B-88 SALEH ATWS 3.2.3 T.S. S-R COMPONENTS 10/25/85C - CO%PI CTE to(85 539(41 B-89 SALEH ATWS (4.2.3 & (4.2.(I LIFE CONPONENTS 12r31r86 P~< AC:alod ~Pgr, 5ci112 B-92 SALEM ATWS 4.5.1 DIVERSE TRIP FEATURES 12/17/85C i/S5 5%029 B-93 SALEM ATWS (4.5.2 & (4.5.3 TEST ALTERNATIVES 12/01/86 Pgo JEc~ p./aL 522'7('I I'C-15 CONTROL OF HEAVY LOADS PHASE II (FOLLOWUP OF HPA 06r28/85C GAP~ oe/as 58092 C-16 UTILITY RESPONSES TO STAFF RECONHENDATIONS CONCERN 12/11/85C C mp(Z~ lo(85'
4
-1208731-001 REGULATORY INFORHATION TRACKING SYSTEH PAGE NO; ~ 66:
FACI L ITY IMPLEMENTATION 03/31/8(
T LUCIE 2 (CONTINUATION)
LIC ACT LICENSEE
~~0 ~P MCO KUZX $ ~U 55906 D-19 DIESEL GENERATOR RELIABILI1Y TECH SPECS (GL 86-15) 05/15/86 I4~ AC:T(oW RPblA(
51206 F-08 I.D.1.1 DETAILED CONTROL RGOH DESIGN REVIEN PROGRA 10/10/84C CoNPLK% oi/aq Concept 51286 F-09 I.D.2 SAFETY PARANETER DISPLAY SYSTEH 06/1 1/85C pRo SECRE b tl8'7 51605 F-1 0 II.D.1 RV AND SV TRAINING 06/15/86 Era os/er P
54982 F-30 II.K.2.13 THERMAL-NECHANICAL REPORT 06/06/86C Com pL&rE. ob/84 57574 F-58 II.K.3.31 COMPLIANCE HITH 10 CFR 50.46 06/26/85C Co CPM~ a6/~
59275 F-68 III .A.2. 2 METEOROLOGICAL DATA UPGRADE 07/15/86 56168 F-71 I.D.1.2 DETAILED CONTROL ROON REVIEN (FOLLOHUP TO 05/15/86 Pgopf.~TCb g g7 59411 G-01 REACTOR COOLANT PUMP TRIP (D660 II.K.3.5) 06/15/86 ~f C ~foP pEAblg