Ack Receipt of IE Insp Rept 50-335/81-18,on 810711-0810.No Proprietary Info.Corrective Actions:Backfit Contractor Issued Procedure Re Fire Barrier Removal & Restoration
ML17212A969
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/02/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17212A968 List:
References
L-81-431, NUDOCS 8111050716
Download: ML17212A969 (6)


Text

~ e I

~ ~

~ (>>

it t i P.O. BOX 529100 MIAMI,FL 33152 yilibi WAn oii g) pt',7 7 '";

n ll 3

i J FLORIDA POWER & LIGHT COMPANY October 2, 1981 L-81-431 Nr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Narietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Nr. O'Reilly:

Re: St. Luci e Unit 1 Docket No. 50-335 IE In~s ection Re ort 81-18 Florida Power 8I Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in this report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/JEN/mbd cc: Nr. J. P. O'Reilly Region II t "DR gjjgo~i+ Bfsoiy o<<>ooooooo PDR PEOPLE... SERVING PEOPLE

l I

~ ~ s ~

i P 0

~ ~

ATTACHMENT Re: St. Luci e Uni t 1 Docket No. 50-335 IE Ins ection Report 81-18 Finding:

Technical Specification 3.7. 12.a requires that when all electrical penetration fi re bar ri ers protecting safety-rel ated areas are not intact, a fi re watch patrol must be established within one hour to inspect at least one side of the penetration(s).

Contrary to the above, fire barriers were not intact and a fire watch patrol was not provided on August 5, 1981 when several penetr ations in the cable spreading/switchgear rooms were found open.

Response

1. FPL concurs with the finding.
2. This problem occur red because backfit contractor personnel did not observe the plant fire barrier policy.
3. As corrective action, the fire barriers were installed upon notification by the site NRC inspector on August 5, 1981.
4. To prevent future problems, the backfit contractor has issued a backf'it procedure regarding fire barrier removal and restoration.

Finding:

Technical Specification 6.8.1(a) requires that written procedures shall be established, implemented and maintained covering the appplicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November 1972.

Contrary to the above, Health Physics Procedure HP-20, Radiation and Contamination Surveys, was not implemented in that, on August 3, 1981, a person was observed exiting the radiation controlled area at door 455 without attempting to "Frisk" for contamination. The inspector also found the frisker to be inoperable.

Response

1. FPL concurs with the finding.
2. The individual in question was not knowledgeable of Procedure HP-20 as it pertained to exiting through door 455.
3. As corrective action, door f55 has been removed from normal service.
4. To prevent future problems, the individual concerned was counseled on the importance of frisking upon leaving a radiation controlled area. This information is covered in the Health Physics indoctrination and retra i ni ng prog r am.
5. Full compliance was achieved on September 28, 1981.

~ ~

~ j ~

'I t

t' fl f'

II

Ski TP OP PLOB r DA )

) ss COUNTY OP DADE )

l

    or< E. <ahri< being first duly sworn, deposes and says: That he is Vice Presiclent: of Plorida Power & Light Company, the Licensee herein; That he has mecutec. the foregoing Qocument; that the state-ment 1llaQe in this said document are true and correct to the bes of hi s knowledge r information'L r and belief r and t hat he authorized to e..ecute the document on behalf of said Licensee, i Robert E. Uhrig Subscribed and sworn to before me this r I10TAIRY'UBLXC, and fo - the Coun"y of Dade, State of Plorida Notary f < > fr o'f Flonda at La<9e October 30, 19 83 ~ >'-y <<f<mtiSS3.On expireS: My Commission m Expires o<< ( 4 4 ~g l~ i V f