ML17207A496

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David
ML17207A496
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/04/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A497 List:
References
L-79-283, NUDOCS 7910250374
Download: ML17207A496 (5)


Text

REGULATORY INF ATION DISTRIBUTION SYSTE, RIDS)

ACCESSION NBR! 7910250374

. DOC DATE! 79/10/04 N NOTARIZED! NO DOCKET FACIL-;!50 389 St ~ Lucie Plantr Unf t 2i Flor fda Power L Light Co ~ 05000389 AUTH ~ NAME AUTHOR AFFILIATION UHRIG, R ~ E ~ Florida Power. L Light Co.

REC IP ~ NAME RECIPIENT AFFILIATION O'REILLYrJ ~ P ~ Region 2i Atlanta'ffice of the Dfrector

SUBJECT:

Forwar ds inter im deficiency rept re damage of reyctor auxiliary bldg 8 shield, bldg resulting from derrick collapse on 790903 during Hurricane David, DISTRIBUTION CODE! 8019S COPIES RECEIYED! LTR ENCL S I Z E! g'

TITLE! EI L C Drawings I tl 4

'OTES!

BOOTES a

W%%W asM&WWWWMIWWWWAWWMIAoowMWM~AI~W m ~MmWWOOPawMWWMW&WWWWowwWMWMOI+ISfM&M&wwO+WO+M~

. RECIPIENT COPIES REC IPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACT'ION! 14 PM Q~~/CC?'Q 1 15 SCL 20 LA/ 21 AD+~/L.

INTERNAL! 02 NRC PDR 05 ILE 07 EDO L STAFF 08 MPA 09 DEPY OIR DPM 10 QAB 11STANDRDS OEV 12 JOROANr E/IE 13FIELO COOR/gE 16 AD FOR ENGR 17 AD PLANT SYS 17 AD REAC SFTY'3 22 DIR DPM OELD AD/SITE'. TECH DIRECTOR DSE GEOSCIENCES BR ILC SYS BR MATI. ENG BR MECH ENG BR POWER SYS BR S HANAUER STRUCT ENG BR EXTERNAL: 03 LPDR 1 00 NSIC 24 ACRS 16 1 DA~~ Q~

Pg l C'>

l g+pRQQ~C> 6 <P QW<L Q Way

~@ey)y;.sg>>

a tm~~m ~~(dL

~~y S Swan~ @~~~@~ 5'79te~~a~3

~

L'7gi0969$ Rz)

/gal+ (~q(Q( KQ>cj[Q i~ )4L5rtvQgg 0

",( TOTAL NUMBER OF COPIES REQUIRED! LTTR 47 ENCL I'y)Stcam~ l4~~~s ('7l lpgEKQ5")'rg

m k h 1

( h I I I'$ 4 T/

gp,8 AE'0I UNITED STATES

'C e

I 0

n o

/ UCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

>>>>*++

a MEMORANDUM FOR: 'ERA Corp.

FROM: US NRC/TIDC/Distribution Services Branch

SUBJECT:

Special Document Handling Requirements 0 1. Please use the following special attached document.

distribution list for the

2. The attached document requires the following special considerations:

Q Do not send oversize enclosure to the NRC PDR.

nly one oversize enclosure was received please return for Regulatory File storage.

Q Proprietary information the NRC PDR send affidavit only to Q Other: (specify)

I cc: DSB Files TIDC/DSB Authorized Signature

'I A

FLORIDA POWER I LIGHT COMPANY 4

October 4, 1979 James p. O'Reilly, Director, Region II L-79-283

-IC Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite >3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

~

-n~

Re: RII:JPO t "p 50-389 ~ ~

DAMAGE RESULTING FROM DERRICK FAILURE DURING HURRICANE DAVID As previously reported to the Office of Inspection and Enforcement on

'September 4 and 5, 1979, during the passage of Hurricane David the Chicago Bridge & Iron guyed deriick collapsed resulting in damage to the Reactor Auxiliary Building on elevations +43 feet and +62 feet, and the concrete Shield Building at elevation +191 feet.

pursuant to 10CFR50.55(e) requirements, an interim'report is attached with a copy also forwarded to Region IV, Office of Inspection and Enforcement. A final deficiency report will be filed by February 1, 1980.

Very truly yours, Pu. W~

Ro'bert E.

\

Uhrig Vice President Attachment 4

CC Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (w/attachment)

~

\ ~

PEOPLE... SERVING PEOPLE