Hurricane David
Jump to navigation
Jump to search
31 August 1978
- See also: Hurricane
Scrams (0)
General
Start date | Site | Title | |
---|---|---|---|
ML24177A020 | 31 July 2024 | Accident Sequence Precursor (ASP) Program Summary Description, Revision 2 | |
ML21081A038 | 22 March 2021 | Probabilistic Risk Assessment (PRA) Lessons from Storms and Floods | |
ML20049G020 | 24 February 2020 | ASP Program Summary Description (Revision 1) | |
ML18135A109 | 20 June 2018 | Qualitative PRA Insights from Operational Events | |
ML16194A144 | 12 July 2016 | Saint Lucie | Updated Final Safety Analysis Report, Volume 17A |
ML14233A514 | 30 June 2014 | Surry 07200002 | Redacted - Surry Power Station Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 20 |
ML20137L968 | 26 November 1985 | Harris | Identifies Various Exhibits Which Applicant,Nrc & FEMA Have Agreed May Be Admitted to Record & Exhibits Not Agreed to |
ML20209G198 | 9 September 1985 | Transcript of 850909 Public Meeting in Washington,Dc Re Earthquakes & Emergency Planning.Pp 1-97 | |
ML20112C401 | 10 September 1984 | Harris | Intervenor Exhibit I-JOINT-24,consisting of Attachment I-16 Listing of Offline Outages at Brunswick & Robinson Nuclear Units for 1978-83 |
ML20092E231 | 3 May 1984 | Catawba | Applicant Exhibit A-EP-13,consisting of 840416 Testimony of Je Neves,Jt Pugh,J Gregory,Pr Lunsford,Wm Mcswain, Be Phillips,Lw Broome,D Johnson & P Needham Re Emergency Planning Contention 3 |
ML20084F916 | 1 May 1984 | Harris | Answers to Joint Intervenors Interrogatories & Request for Production of Documents to Applicants on Joint Contention I (First Set).Certificate of Svc Encl.Related Correspondence |
ML17214A368 | 28 April 1983 | Saint Lucie | Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept |
ML20134A715 | 12 February 1982 | 05000000 | Paper Entitled Flexible Control Tools Promote Success, Presented at American Assoc of Const Engineers 820212-13 Winter Symposium in Miami,Fl |
ML17341B013 | 31 December 1981 | Turkey Point | Annual Nonradiological Environ Monitoring Rept,1981. |
ML19115A331 | 31 October 1981 | Saint Lucie | NUREG-0843, Safety Evaluation Report Related to the Operation of St. Lucie Plant, Unit 2. |
ML17266A501 | 21 September 1981 | Saint Lucie | Forwards Response to NRC Request for Addl Info Re Fsar.Matl Will Be Incorporated in Future FSAR Amend |
ML17266A253 | 26 August 1980 | Saint Lucie | Submits Info Requested in NRC 800711 Ltr Re up-to-date Const Completion Schedules.Facility Will Be Ready for Fuel Loading in Nov 1982.Three Oversize Photographs & Supporting Documentation Encl |
ML17266A161 | 28 March 1980 | Saint Lucie | Forwards Annual Nonradiological Monitoring Rept,1979, Vols 1,2 & 3.Vol 1 Summarizes Abiotic Monitoring for 1979 & Vols 2 & 3 Discuss Biotic Monitoring |
ML17266A171 | 24 March 1980 | Saint Lucie | Forwards General Info Section of Application for OL |
ML19309B616 | 29 February 1980 | Saint Lucie | Annual Nonradiological Environ Monitoring Rept,1979. Vol 2,biotic Monitoring |
ML18082A343 | 25 February 1980 | Salem | Annual Financial Rept 1979 |
ML17266A145 | 11 February 1980 | Saint Lucie | Updated LER 79-028/01X-1:on 790903,in Cold Shutdown During Hurricane,Cable Fell Into Startup Transformer B.Ac Electrical Sys B de-energized & Diesel Generator Failed to Start.Caused by Delay in B Diesel Binding |
ML17208A445 | 8 February 1980 | Saint Lucie Turkey Point | Annual Financial Rept 1979 |
ML17208A313 | 1 February 1980 | Saint Lucie | Forwards Final Const Deficiency Rept Re Hurricane David Damage |
ML17208A315 | 1 February 1980 | Saint Lucie | Final Const Deficiency Rept:On 790903,Chicago Bridge & Iron Guyed Derrick Collapsed During Hurricane David,Damaging Reactor Auxiliary & Concrete Shield Bldgs.Caused by Inadequate Securing.New Derrick Will Be Erected 800107 |
ML19257A044 | 27 December 1979 | Crystal River | Draft Emergency Procedure EM-100. |
ML17207A723 | 7 December 1979 | Saint Lucie | Supplements 791004 Interim Deficiency Re Derrick Collapse During Hurricane.Manufacturer Design Review Recommends Actions to Secure Replacement Derrick,Including Raising Boom & Removing Spreader Beam |
ML17207A675 | 7 December 1979 | Saint Lucie | Response to Intervenor Interrogatories.Lists sys-wide & Offsite Power Disturbances Occurring within Past 10 Yrs. States Reasoning for Not Interconnecting W/Ga Power Co. Certificate of Svc Encl |
ML17207A721 | 7 December 1979 | Saint Lucie | Advises That Mh Hodder & Tj Anderson,Counsel & co-counsel for Intervenors,Will Take Part in 791211 Visit to Util Sys Control Ctr |
ML17207A678 | 27 November 1979 | Saint Lucie | First Set of Interrogatories.Requests Info Re sys-wide Power Failures,Offsite Power Failures,Failure to Provide Intertie W/Ga Power Corp,Test Results & Performance Records. Certificate of Svc Encl |
ML17208A595 | 6 October 1979 | Saint Lucie Turkey Point | Monthly Operating Repts for Sept 1979 |
ML17207A496 | 4 October 1979 | Saint Lucie | Forwards Interim Deficiency Rept Re Damage of Reactor Auxiliary & Shield Bldgs Resulting from 790903 Derrick Collapse During Hurricane David |
ML17207A498 | 4 October 1979 | Saint Lucie | Interim Deficiency Rept Re Damage to Reactor Auxiliary & Shield Bldgs from 790903 Derrick Collapse During Hurricane David.Forwards Six Drawings Detailing Storm Damage.Available in Central Files |
ML20196K480 | 14 September 1979 | Transcript of 790914 Meeting in Silver Spring,Md in Matter of Advisory Committee on Nuclear Power Plant Const During Adjudication.Pp 1-90 | |
L-78-288, Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule | 31 August 1978 | Saint Lucie 05000000 | Advises That FSAR & Environ Rept Submittal Date Revised to Mar 1980 Due to Reduction in Const Schedule |