Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2017409
ML17159A699
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/08/2017
From: Hausman G
Engineering Branch 3
To: Gardner P
Northern States Power Company, Minnesota
References
IR 2017409
Download: ML17159A699 (8)


See also: IR 05000263/2017409

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

June 8, 2017

Mr. Peter A. Gardner

Site Vice President

Monticello Nuclear Generating Plant

Northern States Power Company, Minnesota

2807 West County Road 75

Monticello, MN 55362-9637

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 - INFORMATION

REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000263/2017409

Dear Mr. Gardner:

On September 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure 71130.10P Cyber-Security, issued

May 15, 2017, at your Monticello Nuclear Generating Plant, Unit 1. The inspection will be

performed to evaluate and verify your ability to meet full implementation requirements of the

NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations, Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks. The onsite

portion of the inspection will take place during the weeks of September 11-15, 2017, and

September 25-29, 2017.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security Inspection Procedure. This

information should be made available via compact disc and delivered to the regional office no

later than July 7, 2017. The inspection team will review this information and, by July 24, 2017,

will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets, defensive architecture, and the

areas of your plants Cyber-Security Program selected for the cyber-security inspection.

This information will be requested for review in the regional office prior to the inspection by

August 11, 2017.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, September 11, 2017.

P. Gardner -2-

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Steven Sollom of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

630-829-9743 or via e-mail at George.Hausman@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

George M. Hausman, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-263

License No. DPR-22

Enclosure:

Cyber-Security Inspection Document Request

cc: Distribution via LISTSERV

P. Gardner -3-

Letter to Peter A. Gardner from George Hausman dated June 8, 2017

SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 - INFORMATION

REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000263/2017409

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMMonticello

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17159A699

OFFICE RIII RIII RIII RIII

NAME GHausman:cl

DATE 06/08/17

OFFICIAL RECORD COPY

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000263/2017409

Inspection Dates: September 11-15, 2017

September 25-29, 2017

Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017

Reference: Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation

of the Cyber-Security Inspection, Issue Date May 25, 2017

NRC Inspectors: George M. Hausman, Lead Dariusz Szwarc

630-829-9743 630-829-9803

George.Hausman@nrc.gov Dariusz.Szwarc@nrc.gov

NRC Contractors: F. Casey Priester John A. Walley

703-725-9538 703-999-9098

Frederick.Priester@nrc.gov John.Walley@nrc.gov

Observers: Gregory A. Pick Samuel T. Graves

817-200-1270 817-200-1102

Greg.Pick@nrc.gov Samuel.Graves@nrc.gov

James D. Beardsley Robert C. Daley

301-287-0908 630-829-9749

James.Beardsley@nrc.gov Robert.Daley@nrc.gov

Ralph H. Costello Catherine J. Allen

301-287-3618 301-287-3620

Ralph.Costello@nrc.gov Catherine.Allen@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates

on providing the inspection team with the general information necessary to select

appropriate components and Cyber-Security Program (CSP) elements to develop a

site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management security control

portions of the CSP to be chosen as the sample set required to be inspected by the

cyber-security inspection procedure. The first RFIs requested information is specified

below in Table RFI #1. The Table RFI #1 information is requested to be provided to the

regional office by July 7, 2017, or sooner, to facilitate the selection of the specific items

that will be reviewed during the onsite inspection weeks.

Enclosure

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by July 24, 2017, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the

cyber-security inspection. All requests for this information shall follow the Table RFI #1

and the guidance document referenced above.

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by July 7, 2017. Please provide five copies of each CD submitted

(i.e., one for each inspector/contractor and one for the observers). The preferred file

format for all lists is a searchable Excel spreadsheet file. These CDs should be indexed

and hyper-linked to facilitate ease of use. If you have any questions regarding this

information, please call the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3,

Paragraph Number/Title: Items

1 List All Identified CSs and CDAs All

List CDA Facility and Site Ethernet - Transmission Control

2 Protocol/Internet Protocol Based Local Area Networks (LANs) and All

Identify Those LANs That Have Non-CDAs On Them

List CDA Facility and Site Non-Ethernet Transmission Control

3 Protocol/Internet Protocol Based LANs Including Those Industrial All

Networks and Identify LANs That Have Non-CDAs On Them

Network Topology Diagrams (Be Sure To Include All Network Intrusion

Detection System (NIDS) and Security Information and Event

4 All

Management (SIEMs) for Emergency Preparedness (EP) Networks

and Security Level 3 and 4 Networks)

List All Network Security Boundary Devices for EP Networks and All

8 All

Network Security Boundary Devices for Levels 3 and 4

9 List CDA Wireless Industrial Networks All

NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)

11

with Them 11.a.2)

SIEM Documentation for Critical Systems That Have CDAs Associated 12.a.1)

12

with Them 12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems All

Cyber-Security Assessment and Cyber-Security Incident Response

25 All

Teams

In addition to the above information please provide the following:

(1) Electronic copy of the Updated Final Safety Analysis Report and technical

specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by July 24, 2017, for the

second RFI (i.e., Table RFI #2).

II. Additional Information Requested to be Available Prior to Inspection.

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific

systems and equipment to your staff by July 24, 2017, for the second RFI

(i.e., Table RFI #2). The second RFI will request additional information required to

evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP

selected for the cyber-security inspection. The additional information requested for the

specific systems and equipment is identified in Table RFI #2. All requests for this

information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

August 11, 2017. Please provide five copies of each CD submitted (i.e., one for each

inspector/contractor and one for the observers). The preferred file format for all lists is a

searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #2

Reference Section 3,

Paragraph Number/Title: Items

Plant Computer System Block Diagram (If Plant Computer System Is

5 All

Selected for Inspection)

Plant Security System Block Diagram (If Security Computer System Is

6 All

Selected for Inspection)

Systems That Are Distributed Block Diagrams (For Systems Selected

7 All

for Inspection)

Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)

10

Systems Selected for Inspection) 10.a.2)

List All Maintenance and Test Equipment Used On CDAs for Systems

13 All

Selected for Inspection

15 Configuration Management All

16.a.

16.b.1)

16 Supply Chain Management

16.b.5)

16.b.6)

17 Portable Media and Mobile Device Control All

18 Software Management All

20 Vendor Access and Monitoring All

21 Work Control All

3

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Reference Section 3,

Paragraph Number/Title: Items

22 Device Access and Key Control All

23 Password/Authenticator Policy All

24 User Account/Credential Policy All

26 Corrective Actions Since Last NRC Inspection All

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1st Week Onsite) on compact disc (CD) by September 11,

2017, the first day of the inspection. All requests for this information shall follow the

Table 1st Week Onsite and the guidance document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor

and one for the observers). The preferred file format for all lists is a searchable Excel

spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3,

Paragraph Number/Title: Items

Host-Based Intrusion Detection System Documentation for CDAs for 10.a.3) thru

10

Systems Selected for Inspection 10.a.12)

NIDS Documentation for Critical Systems That Have CDAs 11.a.3) thru

11

Associated with Them 11.a.15)

SIEM Documentation for Critical Systems That Have CDAs 12.a.3) thru

12

Associated with Them 12.a.14)

16.b.2)

16 Supply Chain Management 16.b.3)

16.b.4)

19 Cyber-Security Event Notifications All

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan;

4

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

e. Latest Individual Plant Examination for External Events/Probabilistic Risk

Assessment Report; and

f. Vendor Manuals.

(2) Assessment and Corrective Actions:

a. The most recent Cyber-Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security

QA audit and/or self-assessment.

IV. Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team

leader.

5