UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
June 8, 2017
Mr. Peter A. Gardner
Site Vice President
Monticello Nuclear Generating Plant
Northern States Power Company, Minnesota
2807 West County Road 75
Monticello, MN 55362-9637
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 - INFORMATION
REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,
NOTIFICATION TO PERFORM INSPECTION 05000263/2017409
Dear Mr. Gardner:
On September 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure 71130.10P Cyber-Security, issued
May 15, 2017, at your Monticello Nuclear Generating Plant, Unit 1. The inspection will be
performed to evaluate and verify your ability to meet full implementation requirements of the
NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations, Part 73, Section 54,
Protection of Digital Computer and Communication Systems and Networks. The onsite
portion of the inspection will take place during the weeks of September 11-15, 2017, and
September 25-29, 2017.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by the cyber-security Inspection Procedure. This
information should be made available via compact disc and delivered to the regional office no
later than July 7, 2017. The inspection team will review this information and, by July 24, 2017,
will request the specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets, defensive architecture, and the
areas of your plants Cyber-Security Program selected for the cyber-security inspection.
This information will be requested for review in the regional office prior to the inspection by
August 11, 2017.
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, September 11, 2017.
P. Gardner -2-
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. George M. Hausman. We understand that our
regulatory contact for this inspection is Mr. Steven Sollom of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector at
630-829-9743 or via e-mail at George.Hausman@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
George M. Hausman, Senior Reactor Inspector
Engineering Branch 3
Division of Reactor Safety
Docket No. 50-263
License No. DPR-22
Enclosure:
Cyber-Security Inspection Document Request
cc: Distribution via LISTSERV
P. Gardner -3-
Letter to Peter A. Gardner from George Hausman dated June 8, 2017
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 - INFORMATION
REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,
NOTIFICATION TO PERFORM INSPECTION 05000263/2017409
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMMonticello
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML17159A699
OFFICE RIII RIII RIII RIII
NAME GHausman:cl
DATE 06/08/17
OFFICIAL RECORD COPY
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report: 05000263/2017409
Inspection Dates: September 11-15, 2017
September 25-29, 2017
Inspection Procedure: IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017
Reference: Guidance Document for Development of the Request for
Information (RFI) and Notification Letter for Full-Implementation
of the Cyber-Security Inspection, Issue Date May 25, 2017
NRC Inspectors: George M. Hausman, Lead Dariusz Szwarc
630-829-9743 630-829-9803
George.Hausman@nrc.gov Dariusz.Szwarc@nrc.gov
NRC Contractors: F. Casey Priester John A. Walley
703-725-9538 703-999-9098
Frederick.Priester@nrc.gov John.Walley@nrc.gov
Observers: Gregory A. Pick Samuel T. Graves
817-200-1270 817-200-1102
Greg.Pick@nrc.gov Samuel.Graves@nrc.gov
James D. Beardsley Robert C. Daley
301-287-0908 630-829-9749
James.Beardsley@nrc.gov Robert.Daley@nrc.gov
Ralph H. Costello Catherine J. Allen
301-287-3618 301-287-3620
Ralph.Costello@nrc.gov Catherine.Allen@nrc.gov
I. Information Requested for In-Office Preparation
The initial request for information (i.e., first Request for Information (RFI)) concentrates
on providing the inspection team with the general information necessary to select
appropriate components and Cyber-Security Program (CSP) elements to develop a
site-specific inspection plan. The first RFI is used to identify the list of critical systems
and critical digital assets (CSs/CDAs) plus operational and management security control
portions of the CSP to be chosen as the sample set required to be inspected by the
cyber-security inspection procedure. The first RFIs requested information is specified
below in Table RFI #1. The Table RFI #1 information is requested to be provided to the
regional office by July 7, 2017, or sooner, to facilitate the selection of the specific items
that will be reviewed during the onsite inspection weeks.
Enclosure
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
The inspection team will examine the returned documentation from the first RFI and
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
focused follow-up request to develop the second RFI. The inspection team will submit
the specific systems and equipment list to your staff by July 24, 2017, which will identify
the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
defensive architecture, and the areas of the licensees CSP selected for the
cyber-security inspection. All requests for this information shall follow the Table RFI #1
and the guidance document referenced above.
The required Table RFI #1 information shall be provided on compact disc (CD) to the
lead inspector by July 7, 2017. Please provide five copies of each CD submitted
(i.e., one for each inspector/contractor and one for the observers). The preferred file
format for all lists is a searchable Excel spreadsheet file. These CDs should be indexed
and hyper-linked to facilitate ease of use. If you have any questions regarding this
information, please call the inspection team leader as soon as possible.
Table RFI #1
Reference Section 3,
Paragraph Number/Title: Items
1 List All Identified CSs and CDAs All
List CDA Facility and Site Ethernet - Transmission Control
2 Protocol/Internet Protocol Based Local Area Networks (LANs) and All
Identify Those LANs That Have Non-CDAs On Them
List CDA Facility and Site Non-Ethernet Transmission Control
3 Protocol/Internet Protocol Based LANs Including Those Industrial All
Networks and Identify LANs That Have Non-CDAs On Them
Network Topology Diagrams (Be Sure To Include All Network Intrusion
Detection System (NIDS) and Security Information and Event
4 All
Management (SIEMs) for Emergency Preparedness (EP) Networks
and Security Level 3 and 4 Networks)
List All Network Security Boundary Devices for EP Networks and All
8 All
Network Security Boundary Devices for Levels 3 and 4
9 List CDA Wireless Industrial Networks All
NIDS Documentation for Critical Systems That Have CDAs Associated 11.a.1)
11
with Them 11.a.2)
SIEM Documentation for Critical Systems That Have CDAs Associated 12.a.1)
12
with Them 12.a.2)
14 List EP and Security Onsite and Offsite Digital Communication Systems All
Cyber-Security Assessment and Cyber-Security Incident Response
25 All
Teams
In addition to the above information please provide the following:
(1) Electronic copy of the Updated Final Safety Analysis Report and technical
specifications.
(2) Name(s) and phone numbers for the regulatory and technical contacts.
(3) Current management and engineering organizational charts.
2
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Based on this information, the inspection team will identify and select specific systems
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
submit a list of specific systems and equipment to your staff by July 24, 2017, for the
second RFI (i.e., Table RFI #2).
II. Additional Information Requested to be Available Prior to Inspection.
As stated above, in Section I. of this enclosure, the inspection team will examine the
returned documentation requested from Table RFI #1 and submit the list of specific
systems and equipment to your staff by July 24, 2017, for the second RFI
(i.e., Table RFI #2). The second RFI will request additional information required to
evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP
selected for the cyber-security inspection. The additional information requested for the
specific systems and equipment is identified in Table RFI #2. All requests for this
information shall follow the Table RFI #2 and the guidance document referenced above.
The Table RFI #2 information shall be provided on CD to the lead inspector by
August 11, 2017. Please provide five copies of each CD submitted (i.e., one for each
inspector/contractor and one for the observers). The preferred file format for all lists is a
searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to
facilitate ease of use. If you have any questions regarding this information, please call
the inspection team leader as soon as possible.
Table RFI #2
Reference Section 3,
Paragraph Number/Title: Items
Plant Computer System Block Diagram (If Plant Computer System Is
5 All
Selected for Inspection)
Plant Security System Block Diagram (If Security Computer System Is
6 All
Selected for Inspection)
Systems That Are Distributed Block Diagrams (For Systems Selected
7 All
for Inspection)
Host-Based Intrusion Detection System Documentation (For CDAs for 10.a.1)
10
Systems Selected for Inspection) 10.a.2)
List All Maintenance and Test Equipment Used On CDAs for Systems
13 All
Selected for Inspection
15 Configuration Management All
16.a.
16.b.1)
16 Supply Chain Management
16.b.5)
16.b.6)
17 Portable Media and Mobile Device Control All
18 Software Management All
20 Vendor Access and Monitoring All
21 Work Control All
3
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Table RFI #2
Reference Section 3,
Paragraph Number/Title: Items
22 Device Access and Key Control All
23 Password/Authenticator Policy All
24 User Account/Credential Policy All
26 Corrective Actions Since Last NRC Inspection All
III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in this enclosuresSection II., provide
the following RFI (i.e., Table 1st Week Onsite) on compact disc (CD) by September 11,
2017, the first day of the inspection. All requests for this information shall follow the
Table 1st Week Onsite and the guidance document referenced above.
Please provide five copies of each CD submitted (i.e., one for each inspector/contractor
and one for the observers). The preferred file format for all lists is a searchable Excel
spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of
use. If you have any questions regarding this information, please call the inspection
team leader as soon as possible.
Table 1st Week Onsite
Reference Section 3,
Paragraph Number/Title: Items
Host-Based Intrusion Detection System Documentation for CDAs for 10.a.3) thru
10
Systems Selected for Inspection 10.a.12)
NIDS Documentation for Critical Systems That Have CDAs 11.a.3) thru
11
Associated with Them 11.a.15)
SIEM Documentation for Critical Systems That Have CDAs 12.a.3) thru
12
Associated with Them 12.a.14)
16.b.2)
16 Supply Chain Management 16.b.3)
16.b.4)
19 Cyber-Security Event Notifications All
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a. Original Final Safety Analysis Report Volumes;
b. Original Safety Evaluation Report and Supplements;
c. Final Safety Analysis Report Question and Answers;
d. Quality Assurance (QA) Plan;
4
CYBER-SECURITY INSPECTION DOCUMENT REQUEST
e. Latest Individual Plant Examination for External Events/Probabilistic Risk
Assessment Report; and
f. Vendor Manuals.
(2) Assessment and Corrective Actions:
a. The most recent Cyber-Security QA audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generate as a result of the most recent Cyber-Security
QA audit and/or self-assessment.
IV. Information Requested To Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and
the status/resolution of the information requested (provided daily during the
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection team
leader.
5