IR 05000263/2017005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2017005)
ML17240A325
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 08/28/2017
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Gardner P
Northern States Power Company, Minnesota
References
IR 2017005
Download: ML17240A325 (5)


Text

August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR MONTICELLO NUCLEAR GENERATING PLANT (REPORT 05000263/2017005)

Dear Mr. Gardner:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for Monticello Nuclear Generating Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC staff plans to perform Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans at Monticello Nuclear Generating Plant on March 5, 2018, to confirm full implementation of orders Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9827 with any questions you have regarding this letter.

Sincerely,

/RA/

Billy Dickson, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22 Enclosure:

Inspection Plan cc: Distribution via LISTSERV