MONTHYEARIR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) IR 05000263/20230062024-02-28028 February 2024 Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2023006) IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) IR 05000263/20220062023-03-0101 March 2023 Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2022006) ML23058A1522023-02-27027 February 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000263/2023002 IR 05000263/20220052022-08-29029 August 2022 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2022005) IR 05000263/20210062022-03-0202 March 2022 Annual Assessment Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2021006) ML21322A2362021-11-18018 November 2021 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2022401 IR 05000263/20210052021-09-0101 September 2021 Updated Inspection Plan for Monticello Nuclear Generating Plant 2 (Report 05000263/2021005) ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21147A5082021-06-0303 June 2021 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21085A8582021-03-26026 March 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000263/2021010 IR 05000263/20200062021-03-0404 March 2021 Annual Assessment Letter for the Monticello Nuclear Generating Plant (Report 05000263/2020006) ML21029A2982021-01-29029 January 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000263/2021002 ML20275A3942020-10-0101 October 2020 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at the Monticello Nuclear Generating Plant IR 05000263/20200052020-09-0101 September 2020 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2020005) ML20134H9282020-05-12012 May 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000263/2020013 IR 05000263/20190062020-03-0303 March 2020 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2019006 and 07200058/2019006) ML19324F8512019-11-20020 November 2019 Long-Term Replacement Steam Dryer Inspection Plan ML19322C0512019-11-14014 November 2019 Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report Number 05000263/2020011 IR 05000263/20190052019-08-28028 August 2019 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2019005) ML19136A0202019-05-15015 May 2019 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Garza) ML19065A0832019-03-0505 March 2019 Ltr. 03/05/19 Monticello Nuclear Generating Plant - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000263/2019002 (DRS-E.Fernandez) IR 05000263/20180062019-03-0404 March 2019 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2018006 and 07200058/2018006) IR 05000263/20180052018-08-28028 August 2018 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2018005) IR 05000263/20170062018-03-0202 March 2018 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2017006) ML17345A8402017-12-11011 December 2017 Information Request to Support Upcoming Temporary Instruction 2515/191 Inspection at Monticello Nuclear Generating Plant IR 05000263/20170052017-08-28028 August 2017 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2017005) IR 05000263/20174092017-06-0808 June 2017 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2017409 ML17094A4352017-04-0303 April 2017 Monticello - Notification of NRC Supplemental Inspection (95001) and Request for Information IR 05000263/20160062017-03-0101 March 2017 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2016006) ML17026A4302017-01-26026 January 2017 Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000263/2017007 IR 05000263/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2016005) IR 05000263/20150062016-03-0202 March 2016 Annual Assessment Letter for Monticello Nuclear Generating Plant (Inspection Report 05000263/2015006) ML16041A0482016-02-0909 February 2016 Ltr. 02/09/16 Monticello Nuclear Generating Plant - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000263/2016002 IR 05000263/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2015005) IR 05000263/20140012015-03-0404 March 2015 Annual Assessment Letter for the Monticello Nuclear Generating Plant, (Report 05000263/2014001) ML15027A0412015-01-26026 January 2015 ISI Request for Information ML14245A1442014-09-0202 September 2014 Mid-Cycle Assessment Letter for Monticello Nuclear Generating Plant ML14216A5132014-08-0404 August 2014 Information Request to Support Upcoming Biennial Problem Identification and Resolution Inspection at the Monticello Nuclear Generating Plant IR 05000263/20130012014-03-0404 March 2014 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2013001) ML13246A2312013-09-0303 September 2013 2013 Monticello MOC Letter Combined ML13221A5712013-08-0909 August 2013 Ltr 8/9/13 Monticello MOD 50.59 Request for Information IR 05000263/20120012013-03-0404 March 2013 Annual Assessment Letter for Monticello Nuclear Generating Plant, (Report 05000263-12-001) ML12249A4222012-09-0404 September 2012 Mid-Cycle Assessment Letter for Monticello Generating Plant IR 05000263/20110072012-03-0505 March 2012 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263/2011007) IR 05000263/20110062011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plant for Monticello Nuclear Plant 05000263-11-006 IR 05000263/20110012011-03-0404 March 2011 Annual Assessment Letter for Monticello Nuclear Generating Plant (Report 05000263-11-001) ML1104705722011-02-16016 February 2011 Request Notification of NRC Inspection and Request for Information ISI ML1024400642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Monticello Nuclear Generating Plant 2024-08-30
[Table view] Category:Letter
MONTHYEARIR 05000263/20240042025-01-30030 January 2025 Integrated Inspection Report 05000263/2024004 ML25006A1522025-01-16016 January 2025 Section 106 Consultation of Monticello SLR-Shakopee ML25006A1502025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Lower Sioux Indian Community ML25006A1512025-01-16016 January 2025 Section 106 Consultation for Monticello SLR-Mille Lacs Band of Ojibwe ML25010A0722025-01-10010 January 2025 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000263/2025002 IR 05000263/20244042025-01-0606 January 2025 Material Control and Accounting Program Inspection Report 05000263/2024404 (Public) ML24310A3442024-12-30030 December 2024 Transmittal Letter for Renewed License ML24270A1552024-12-19019 December 2024 Issuance of Amendment No. 213 Revise Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (Ptlr), and Update Neutron Fluence Methodology ML24354A2952024-12-18018 December 2024 ISFSI and Monticello Nuclear Generating Plant - Independent Spent Fuel Storage Installation Decommissioning Funding Plans L-MT-24-045, 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462024-12-13013 December 2024 2024 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 ML24353A1192024-12-12012 December 2024 Usepa Monticello Re-license Feis Comments (1) IR 05000263/20244022024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024402; Independent Spent Fuel Storage Installation Security Inspection Report 07200058/2024401 IR 05000263/20244032024-12-0606 December 2024 – Security Baseline Inspection Report 05000263/2024403 ML24324A0082024-12-0404 December 2024 Letter to Minnesota State Historic Preservation Office Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application IR 05000263/20243012024-11-27027 November 2024 NRC Initial License Examination Report 05000263/2024301 L-MT-24-042, Update to the Technical Specifications Bases2024-11-22022 November 2024 Update to the Technical Specifications Bases ML24323A2142024-11-21021 November 2024 – Relief Request RR-017, Inservice Inspection (ISI) Impracticality During the Fifth Ten-Year Interval ML24318C5002024-11-19019 November 2024 Letter to Robert Blanchard Tribal Chairman Bad River Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5102024-11-18018 November 2024 Letter to Louis Taylor Chairman Lac Courte Oreilles Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5092024-11-18018 November 2024 Letter to Doreen Blaker President Keweenaw Bay Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5012024-11-18018 November 2024 Letter to Catherine Chavers Tribal Chairwoman Bois Forte Band Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5202024-11-18018 November 2024 Letter to Grant Johnson President Prairie Island Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5182024-11-18018 November 2024 Letter to Gena Kakkak Chairwoman Menominee Indian Tribe of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5222024-11-18018 November 2024 Letter to Darrell Seki Chairman Red Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5282024-11-18018 November 2024 Letter to Jamie Azure Chairman Turtle Mountain Band of Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5322024-11-18018 November 2024 Letter to Robert Vanzile Jr Chairman Sokaogon Chippewa Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A1732024-11-18018 November 2024 Ltr. to Shawn Hafen, Site Vice President, Monticello Nuclear Generating Plant, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5032024-11-18018 November 2024 Letter to Anthony Reider President Flandreau Santee Sioux Tribe NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5232024-11-18018 November 2024 Letter to Alonzo Denney Chairman Santee Sioux Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5022024-11-18018 November 2024 Letter to Reggie Wassana Governor Cheyenne and Arapaho Tribes NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5162024-11-18018 November 2024 Letter to James Williams Jr Chairman Lac Vieux Desert Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5212024-11-18018 November 2024 Letter to Nicole Boyd Chairwoman Red Cliff Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5312024-11-18018 November 2024 Letter to Virgil Wind Chief Executive Mille Lacs Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5292024-11-18018 November 2024 Letter to Kevin Jensvold Tribal Chairman Upper Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5042024-11-18018 November 2024 Letter to Jeffrey Stiffarm President Fort Belknap Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5112024-11-18018 November 2024 Letter to John Johnson President Lac Du Flambeau Band of Lake Superior Chippewa Indians Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3512024-11-18018 November 2024 Letter to Amy Spong, Deputy State Historic Preservation Officer, Re., NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5172024-11-18018 November 2024 Letter to Robert Larsen President Lower Sioux Indian Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5072024-11-18018 November 2024 Letter Timothy Rhodd Chairman Iowa Tribe of Kansas and Nebraska Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5252024-11-18018 November 2024 Letter to J Garrett Renville Tribal Chairman Sisseton Wahpeton Oyate of the Lake Traversee Re NOA Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5262024-11-18018 November 2024 Letter to Lonna Johnson Street Chairperson Spirit Lake Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5192024-11-18018 November 2024 Letter to Michael Laroque President Minnesota Chippewa Tribe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5302024-11-18018 November 2024 Letter to Michael Fairbanks Chairman White Earth Nation Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5052024-11-18018 November 2024 Letter to Bruce Savage Tribal Chairperson Found Du Lac Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5062024-11-18018 November 2024 Letter to Robert Deschampe Tribal Chair Grand Portage Band of Lake Superior Chippewa Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5152024-11-18018 November 2024 Letter to Faron Jackson Sr Chairman Leech Lake Band of Ojibwe Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24312A3462024-11-18018 November 2024 Letter to Jaime Loichinger Director Office of Federal Agency Programs, Achp NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24318C5242024-11-18018 November 2024 Letter to Cole Miller Chairman Shakopee Mdewakaton Sioux Community Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR ML24312A3202024-11-18018 November 2024 Letter to Durell Cooper Tribal Chairman Apache Tribe of Oklahoma Re NOA of the Final EIS for the Monticello Nuclear Generating Plant Unit 1 SLR ML24318C5272024-11-18018 November 2024 Letter to Thomas Fowler Chairman St. Croix Chippewa of Wisconsin Re NOA of the Final EIS for the Monticello Nuclear Generating Plant, Unit 1 SLR 2025-01-06
[Table view] |
Text
May 15, 2019 Mr. Christopher Church Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANTINFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION
Dear Mr. Church:
This letter is to request information to support the Emergency Action Level and Emergency Plan Changes Inspection that will be conducted during the third and fourth quarters of 2019. This inspection will be performed as an in-office review and in accordance with the U.S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71114.04. The list of requested documents needed from your staff for this inspection is enclosed. We are requesting that these documents are for the time period specified in the list, as applicable.
The point of contact for this request is Michelle Garza, Region III Emergency Preparedness Inspector, and can be reached at 630-829-9719. We will keep in close communications with the Emergency Preparedness staff at your site regarding this request and the inspection when performed.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Randal D. Baker, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosure:
EAL and Emergency Plan Changes Inspection Document Request cc: Distribution via LISTSERV
Letter to Christopher Church from Randal D. Baker dated May 15, 2019.
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANTINFORMATION REQUEST TO SUPPORT THE NRC ANNUAL BASELINE EMERGENCY ACTION LEVEL AND EMERGENCY PLAN CHANGES INSPECTION DISTRIBUTION:
Michael McCoppin RidsNrrDorlLpl3 RidsNrrPMMonticello RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML19136A020 OFFICE RIII RIII NAME MGarza:jw RBaker DATE 05/15/19 05/15/19 OFFICIAL RECORD COPY
EAL AND EMERGENCY PLAN CHANGES INSPECTION DOCUMENT REQUEST Enclosure We request that all information listed below be received no later than July 12, 2019.
The information is preferred electronically on a CD-ROM. Send the information requested to the U.S. Nuclear Regulatory Commission Region III office:
U.S. NRC Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Attn: Michelle Garza, DRS Documents:
- 1. Current revision of the Emergency Plan.
- 2. Current Emergency Action Level (EAL) scheme.
- 3. Most recent Safety Evaluation Report for the Emergency Plan and EALs.
- 4. On Shift Staffing Analysis baseline.
- 5. Most recent Evacuation Time Estimate.
- 6. Governing site document for Title 10 of the Code of Federal Regulations (CFR),
Part 50.54(q) evaluation process.
- 7. Title 10 CFR 50.54(q) evaluator training program and qualification records.
- 8. Title 10 CFR 50.54(q) screenings and evaluations for Emergency Plan and EAL changes that were completed between June 30, 2018, and June 30, 2019.
- 9. For each change of the Emergency Plan and EALs, submit the previous revision, proposed revision, and the associated 10 CFR 50.54(q) screening and evaluation (if performed).
- 10. Corrective Action Program entries related to 10 CFR 50.54(q) screenings, 10 CFR 50.54(q) evaluations, EAL changes and Emergency Plan changes dated between June 30, 2018, and June 30, 2019.