Notification of NRC Triennial Heat Sink Performance Inspection (05000275/2016003 and 05000323/2016003) and Request for Information
ML16148A373
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/27/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Halpin E
Pacific Gas & Electric Co
References
IR 2016003
Download: ML16148A373 (7)


See also: IR 05000275/2016003

Text

May 27, 2016

Mr. Edward D. Halpin, Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2016003

AND 05000323/2016003) AND REQUEST FOR INFORMATION

Dear Mr. Halpin:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct a triennial heat sink performance inspection at your Diablo Canyon Power Plant,

Units 1 and 2, from August 1-5, 2016. The inspection will be comprised of one reactor inspector

from the NRCs Region IV office for one week. The inspection will be conducted in accordance

with NRC Inspection Procedure 71111.07, "Heat Sink Performance."

Experience has shown that this inspection is resource intensive, both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by July 22, 2016. We request

that during the on-site inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the implementation and maintenance of your heat exchanger program

are available. Of specific interest are those documents that establish your heat exchanger

program satisfies the NRC regulatory requirements and conforms to applicable the NRC

guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should

be available to support the inspector at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be David Madsen of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the

inspector, Gerond George, at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

E. Halpin -2-

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-275 and 50-323

License Nos. DPR-80 and DPR-82

Enclosure:

Request for Information

cc: Electronic Distribution

Request for Information

Triennial Heat Sink Performance Inspection

Diablo Canyon Power Plant

Inspection Report: 05000275/2016003, 05000323/2016003

Inspection Dates: August 1-5, 2016

Inspection Procedure: IP 71111.07, Heat Sink Performance

Inspector: Gerond A. George, Senior Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office via electronic format

(Certrec IMS preferred), to the attention of Gerond George, by July 22, 2016. The inspector will

select specific items from the information requested below and then request from your staff

additional documents needed during the on-site inspection week. Also, we request that you

categorize the documents in your response with the numbered list below, and for Adobe

portable document files (.pdf) please make the text searchable. If requested documents are

large and only hard copy formats are available, please inform the inspector and provide subject

documentation during the first day of the on-site inspection. If you have any questions

regarding this information request, please call the lead inspector as soon as possible.

The following heat exchangers/heat sinks have been selected for inspection:

  • Safety Injection Lube Oil Cooler (1-1, 1-1A/B)
  • Intake Structure

For all Generic Letter 89-13 exchangers:

1. List of corrective action program documents (with a short description) associated with

Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger cavitation, or heat exchanger testing, in the previous three years

2. System health report(s) and maintenance rule system notebooks for all the Generic

Letter 89-13 heat exchangers

3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the

previous three years

4. Copies of any procedures developed to implement the recommendations of Generic

Letter 89-13 (e.g., the Generic Letter 89-13 Heat Exchanger Program description)

5. Copies of any commitments to the Generic Letter 89-13 program

For the specific heat exchangers selected:

Testing Documents

6. Copies of the two most recent completed tests confirming thermal performance for those

heat exchangers which are performance-tested

7. Instrument uncertainties of the instruments used during testing

8. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for the

selected heat exchangers

9. Documents that show the as-found results are recorded, evaluated, and appropriately

dispositioned such that the as-left condition is acceptable

Cleaning Documents

10. The cleaning and inspection maintenance schedule for each heat exchanger for the next

five years

11. Copy of the document describing the inspection results for the last two cleaning and

inspection activities completed on each heat exchanger

12. Cleaning procedures with acceptance criteria for the selected heat exchangers

13. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results)

14. Copies of those documents that describe the methods taken to control water chemistry

in the heat exchangers

Design Documents

15. Copies of the design basis documents and updated final safety analysis report pages for

the selected heat exchangers

16. Copies of the system training manuals for the selected heat exchangers

17. Provide a list of calculations with a description which currently apply to each heat

exchanger

18. Copies of vendor data sheets and design basis data for the selected heat exchangers

19. Copy of the calculation which establishes the limiting (maximum) design basis heat load

which is required to be removed by each of these heat exchangers

20. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria)

21. Copy of the calculations or documents which evaluate the potential for water hammer or

excessive tube vibration in the heat exchanger or associated piping

22. Copy of the document which identifies the current number of tubes in service for each

heat exchanger and the supporting calculation which establishes the maximum number

of tubes which can be plugged in each heat exchanger

23. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes

which are identified in each heat exchanger

For the ultimate heat sink or safety-related service water system:

24. Intake structure inspections that monitor the integrity of the ultimate heat sink

25. Copies of calculations and surveillances that determine the ultimate heat sink reservoir

capacity and heat transfer capability

26. Copies of any design changes performed on the ultimate heat sink or safety-related

service water system

27. Copies of procedures for a loss of ultimate heat sink or safety-related service water

system

28. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells,

debris, etc.) and aquatic life

29. Copies of inspections and/or maintenance related to preventing biotic fouling

30. Copies of procedures and/or test results to survey or monitor interface valves between

the safety-related section of the service water system and the non-safety-related section

31. Copy of the most recent service water flow balance test results, both as-found and as-

left

32. History of any through-wall pipe leaks on the safety-related service water system

Inspector Contact Information:

Gerond A. George

Senior Reactor Inspector

817-200-1562

Gerond.George@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Gerond A. George

1600 East Lamar Blvd.

Arlington, TX 76011-4511

ML16148A373

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GAG Yes No Non-Publicly Available Sensitive NRC-002

OFFICE SRI/DRS C:EB1

NAME GGeorge TFarnholtz

SIGNATURE /RA/ /RA/

DATE 5/27/16 5/27/16

Letter to Edward D. Halpin from Thomas R. Farnholtz, dated May 27, 2016

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2016003

AND 05000323/2016003) AND REQUEST FOR INFORMATION

Distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Acting Senior Resident Inspector (John.Reynoso@nrc.gov)

Resident Inspector (Michael.Stafford@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Mathew.Kirk@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)