Summary of Telecon Held on June 9, 2016, Between the NRC and DTE Electric Company, Concerning Aspects of the 2016 Annual Update Pertaining to the Fermi 2 Nuclear Power Plant, License Renewal Application
ML16187A180
Person / Time
Site: Fermi 
Issue date: 06/30/2016
From: Lois James
License Renewal Projects Branch 1
To: Polson K
DTE Electric Company
Lois James, 301-415-3306
References
TAC MF4222
Download: ML16187A180 (2)


Text

From:

James, Lois To:

"polsonk@dteenergy.com" Cc:

Diaz-Sanabria, Yoira K; Keegan, Elaine; Danna, James; Karipineni, Nageswara; Titus, Brett; Kanatas, Catherine; Dickson, Billy; Kemker, Brian; Smagacz, Phillip; Chandrathil, Prema; Mitlyng, Viktoria; Logaras, Harral; Barker, Allan; Mcintyre, David; "lynnk@dteenergy.com"; "goodmanl@dteenergy.com"

Subject:

SUMMARY

OF TELECON HELD ON JUNE 9, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DTE ELECTRIC COMPANY, CONCERNING ASPECTS OF THE 2016 ANNUAL UPDATE PERTAINING TO THE FERMI 2 NUCLEAR POWER PLANT, LICENSE RENEWAL APPLICATION (TAC. MF4222)

Date:

Tuesday, July 05, 2016 12:21:00 PM Attachments: - list of attendees for telecon held on June 9, 2016.docx - summary of telecon held on June 9, 2016, revision 1.docx LICENSEE: DTE Electric Company FACILITY: Fermi 2 Nuclear Power Plant

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON JUNE 9, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DTE ELECTRIC COMPANY, CONCERNING ASPECTS OF THE 2016 ANNUAL UPDATE PERTAINING TO THE FERMI 2 NUCLEAR POWER PLANT, LICENSE RENEWAL APPLICATION (TAC. NO. MF4222)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of DTE Electric Company (DTE or applicant) held a telephone conference call on June 9, 2016, to discuss and clarify the staffs understanding of DTEs Fermi 2 License Renewal Application 2016 Annual Update, specifically the scoping and screening of a recently installed system, Beyond Design Basis External Event Mitigation (Fukushima). This new system is intended to be used as part of the Flexible and Diverse Coping (FLEX) to mitigate Beyond Design Basis External Events in response to NRC Order EA-12-049, Issuance of Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.

provides a listing of the participants and Enclosure 2 contains a summary of the discussion.

The applicant had an opportunity to comment on this summary.

Lois M. James License Renewal Branch, RPB1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number: 50-341

Enclosures:

1. List of Participants
2. List of Requests for Additional Information

Package: ML16187A181 Email: ML16187A180 Enclosure 1: ML16187A173 Enclosure 2: ML16187A179

OFFICE PM:RPB1:DLR SBPB:DE BC:RPB1:DLR NAME LJames NKaripineni YDiaz-Sanabria DATE 6/29/2016 6/29/2016 6/30/2016