Other: ML14195A221, ML14219A743, ML14237A194, ML14267A267, ML15030A226, ML15030A229, ML15076A468, ML15092A224, ML15092A243, ML15098A175, ML15341A261, ML16005A399, ML16146A799, ML16187A173, ML16187A179, ML16187A180, ML16270A531, ML16270A567, ML16330A117, NRC-15-0068, License Renewal Application 2015 Annual Update, NRC-16-0014, Comments on the NRCs Safety Evaluation Report with Open Items Related to the License Renewal, NRC-16-0061, DTE Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools
|
MONTHYEARML14195A2212014-07-24024 July 2014 Plan for Scoping and Screening Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other ML14219A7432014-07-30030 July 2014 Endangered Species List for Proposed Enrico Fermi, Unit 2, License Renewal Project stage: Other ML14237A1942014-09-0505 September 2014 Plan for the Aging Management Program Regulatory Audit Regarding the Fermi 2 License Renewal Application Review Project stage: Other ML14267A2672014-10-21021 October 2014 Scoping and Screening Audit Report Project stage: Other NRC-14-0070, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12014-10-24024 October 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 1 Project stage: Response to RAI ML14288A6802014-10-29029 October 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 3 Project stage: RAI ML14293A8382014-11-10010 November 2014 Summary of Telephone Conference Call Held Between NRC and DTE Electric Co., Concerning Draft Requests for Additional Information 2.4-1, 2.4-2, 2.4-3, and 3.5.2.2.2.1-1 Pertaining to Fermi, Unit 2, License Renewal Application Project stage: Draft RAI ML14294A0622014-11-10010 November 2014 Summary of Telephone Conference Call Held Between NRC and DTE Electric Co., Concerning Draft Request for Additional Information 2.1-1 Pertaining to Fermi, Unit 2, License Renewal Application Project stage: Draft RAI NRC-14-0072, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22014-11-18018 November 2014 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 2 Project stage: Response to RAI ML14322A5262014-11-25025 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 8 Project stage: RAI ML14321A7522014-11-26026 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 4 Project stage: RAI ML14322A2032014-11-26026 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 6 Project stage: RAI ML14322A1782014-11-26026 November 2014 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 5 Project stage: RAI NRC-14-0076, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 32014-12-0101 December 2014 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 3 Project stage: Response to RAI ML14323A8802014-12-0404 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 7 Project stage: RAI ML14329B2332014-12-0909 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 9 Project stage: RAI ML14335A4742014-12-12012 December 2014 Summary of Telephone Conference Call Held on November 26, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Draft Requests for Additional Information B.1.12-1 and B.1.12-4 Pertaining to the Fermi 2 Nu Project stage: Draft RAI ML14335A1882014-12-16016 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 14 Project stage: RAI ML14342A6522014-12-17017 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 15 Project stage: RAI ML14342A8682014-12-17017 December 2014 Request for Additional Information for the Review of the Fermi, Unit 2, License Renewal Application - Set 10 Project stage: RAI ML14342A9862014-12-19019 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Project stage: RAI ML14342A9382014-12-19019 December 2014 Requests for Additional Information for the Review of the Fermi, Unit 2 License Renewal Application - Set 11 Project stage: RAI ML14350B3582014-12-22022 December 2014 Requests for Additional Information for the Review of the Fermi, Unit 2, License Renewal Application - Set 18 Project stage: RAI ML14351A4582014-12-23023 December 2014 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 13 Project stage: RAI ML14350B3652014-12-23023 December 2014 Requests for Additional Information for the Review of the Fermi2 License Renewal Application - Set 16 Project stage: RAI NRC-14-0082, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 82014-12-26026 December 2014 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 8 Project stage: Response to RAI NRC-14-0083, Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 62014-12-30030 December 2014 Response to NRC Request for Additional Information for the Review of License Renewal Application - Sets 4, 5, and 6 Project stage: Response to RAI NRC-15-0001, Response to NRC Request for Additional Information for the Review License Renewal Application - Set 72015-01-0505 January 2015 Response to NRC Request for Additional Information for the Review License Renewal Application - Set 7 Project stage: Response to RAI NRC-15-0013, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives2015-01-0909 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Severe Accident Mitigation Alternatives Project stage: Response to RAI ML14356A2122015-01-14014 January 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 17 Project stage: RAI NRC-15-0009, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 152015-01-15015 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 15 Project stage: Response to RAI ML15002A0462015-01-20020 January 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 20 Project stage: RAI NRC-15-0006, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 112015-01-20020 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Project stage: Response to RAI ML15015A1942015-01-26026 January 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 19 Project stage: RAI ML15030A0712015-01-30030 January 2015 Notice (Second Notice Pursuant to 10 CFR Section 2.309 (J)) Project stage: Request NRC-15-0022, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-12015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 12 Questions 4.2.2-1 and 4.2.2-2 and Set 15 Question 4.2.6-1 Project stage: Response to RAI NRC-15-0012, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 182015-01-30030 January 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 18 Project stage: Response to RAI NRC-15-0010, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 162015-02-0505 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 16 Project stage: Response to RAI ML15030A2292015-02-11011 February 2015 AMP Audit Summary Report Enclosure Project stage: Other ML15030A2262015-02-11011 February 2015 Aging Management Programs Audit Report Regarding the Fermi 2 Nuclear Power Plant Project stage: Other ML15026A3992015-02-11011 February 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 21 Project stage: RAI NRC-15-0011, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 172015-02-12012 February 2015 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 17 Project stage: Response to RAI NRC-15-0029, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-12015-02-19019 February 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 11 Question B.1.22-1 Project stage: Response to RAI ML15035A1302015-02-20020 February 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 22 Project stage: RAI ML15051A3482015-02-24024 February 2015 Schedule Revision and Project Manager Change for the Review of the Fermi 2 License Renewal Application Project stage: Approval NRC-15-0023, Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 22015-03-0505 March 2015 Response to NRC Request for Additional Information for the Environmental Review of the License Renewal Application - Severe Accident Mitigation Alternatives Set 2 Project stage: Response to RAI ML15051A3172015-03-11011 March 2015 Requests for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 24 Project stage: RAI ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 Project stage: RAI ML15051A4202015-03-13013 March 2015 Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 23 Project stage: RAI ML15054A1712015-03-13013 March 2015 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2014-07-24
[Table View] |
Similar Documents at Fermi |
|---|
|
Text
From:
LynneSGoodman<goodmanl@dteenergy.com>
Sent:
Wednesday,May25,20168:48AM To:
James,Lois;Mink,Aaron Cc:
KevinPLynn;JohnATibai
Subject:
[External_Sender]Fw:Re:Fw:PotentialDraftRAIbasedon2016 AnnualUpdate Lois and Aaron - here is the answer to the question regarding the pump changeout. We'll discuss further at this afternoon's call at 1500.
Lynne Goodman 734-586-1205 313-280-0546 (pager)
Forwarded by Lynne S Goodman/Employees/dteenergy on 05/25/2016 08:45AM -----
To: Lynne S Goodman/Employees/dteenergy@dteenergy From: John A Tibai/Employees/dteenergy Date: 05/25/2016 08:44AM Cc: Kevin P Lynn/Employees/dteenergy@dteenergy
Subject:
Re: Fw: Potential Draft RAI based on 2016 Annual Update Lynne, In response to the NRC's question, the change made affects only the Jacket Coolant Pumps. The change was made per ERE 45149, "Replacement of EDG 11, 12, 13 and 14 Standby Jacket Coolant Pump and Motor Assemblies." This Engineering change paper applies only to the Jacket Coolant Pumps. JC pumps on two of the four EDGs have been changed so far.
- Regards, John Tibai, P.E.
License Renewal Application Core Team
From: James, Lois Sent: Wednesday, May 25, 2016 7:45 AM To:
Kevin P Lynn; 'goodmanl@dteenergy.com'
Subject:
Potential Draft RAI based on 2016 Annual Update Lynne/Kevin, I have received the following question/clarification. We are available for a call today. Can you let me know your availability?
Regarding Fermi 2 LRA 2016 Annual Update, LRA change E (pages 1 thru 2):
Change E:
Skid-mounted pumps in the emergency diesel generator system (R30) were replaced.
The pump casing material was previously carbon steel. The new material is gray cast iron. Components in the R30 system are reviewed in LRA Table 3.3.2-10. There are existing line items for carbon steel pump casing, but not for gray cast iron pump casing.
LRA Table 3.3.2-10 is revised to add line items for gray cast iron pump casing and the corresponding text in LRA Section 3.3.2.1.10 is revised to add gray cast iron to the list of materials.
Response
The changes made to the AMR tables (Annual Update, page 18) suggest that only the jacket coolant (treated water) pump was replaced. Other skid-mounted pumps shown in UFSAR Figures 9.5-6, 9.5-7, and 9.5-11 include the air cooler coolant (raw water) pump, lube oil pumps, and fuel oil pumps. If other pumps were also replaced, then some may be exposed to raw water (int and/or ext), lube oil (int), and/or condensation (ext) and subject to loss of material like the existing carbon steel AMR line-items (LRA pages 3.3-149 thru 3.3-150). Clarification is needed to identify the specific pumps that were replaced and to provide reasoning as to why the other environments and corresponding aging effects that exist for carbon steel pump casings were not included for gray cast iron pump casings.
Thanks.
Lois M. James, Senior Project Manager Division of License Renewal (DLR)
Office of Nuclear Reactor Regulation (NRR) 301-415-3306 Lois.James@nrc.gov