ML13246A227

From kanterella
Jump to navigation Jump to search
2013 Donald C. Cook Mid-Cycle Letter Combined
ML13246A227
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/03/2013
From: Jamie Benjamin
Division Reactor Projects III
To: Weber L
Indiana Michigan Power Co, Nuclear Generation Group
References
IR-13-006
Download: ML13246A227 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)

Dear Mr. Weber:

On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

L. Weber In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)

TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServTM

L. Weber In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)

TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D.C. Cook Inspection/Activity Plan cc w/encl: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME JBenjamin:rj DATE 08/29/13 OFFICIAL RECORD COPY

Letter to L. Weber from J. Benjamin dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)

DISTRIBUTION:

Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 D.C. Cook 08/23/2013 13:54:41 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI PI&R - BIENNIAL PI&R INSPECTION 5 1, 2 08/26/2013 09/13/2013 IP 71152B Problem Identification and Resolution BI ISI - INSERVICE INSPECTION - UNIT 2 4 2 10/07/2013 10/25/2013 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/07/2013 10/11/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/07/2013 10/11/2013 IP 71124.02 Occupational ALARA Planning and Controls TI 182 - BURIED PIPING TI 182 1 1 12/02/2013 12/06/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 12/09/2013 12/13/2013 IP 71124.05 Radiation Monitoring Instrumentation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 01/06/2014 01/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 02/10/2014 02/14/2014 IP 7111111B Licensed Operator Requalification Program BI MODS - MODIFICATIONS/50.59 INSPECTION 3 1, 2 03/03/2014 03/21/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 03/17/2014 03/21/2014 IP 71124.05 Radiation Monitoring Instrumentation RENEWAL - LICENSE RENEWAL U1 6 1 04/28/2014 05/16/2014 IP 71003 Post-Approval Site Inspection for License Renewal BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 05/05/2014 05/09/2014 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 1 06/23/2014 06/27/2014 IP 7111402 Alert and Notification System Testing 1 06/23/2014 06/27/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 06/23/2014 06/27/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 06/23/2014 06/27/2014 IP 71151 Performance Indicator Verification OL PREP - INITIAL EXAM - 08/2014 3 1 06/30/2014 07/03/2014 W90305 OL - INITIAL EXAM - 2014 APR/DEC - COOK OL EXAM - INIT EXAM FOR 07/2014 5 1 07/21/2014 08/01/2014 W90305 OL - INITIAL EXAM - 2014 APR/DEC - COOK This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 D.C. Cook 08/23/2013 13:54:41 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI ISI - INSERVICE INSPECTION - UNIT 1 4 2 09/30/2014 10/24/2014 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 11/03/2014 11/07/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 11/03/2014 11/07/2014 IP 71151-BI01 Reactor Coolant System Activity 1 11/03/2014 11/07/2014 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/03/2014 11/07/2014 IP 71151-PR01 RETS/ODCM Radiological Effluent This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.