Mid-Cycle Assessment Letter for Donald C. Cook Nuclear Power Plant, Units 1 and 2
ML14245A256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/02/2014
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To: Weber L
Indiana Michigan Power Co, Nuclear Generation Group
References
Download: ML14245A256 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 2, 2014 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

Dear Mr. Weber:

On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Donald C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Donald C. Cook Nuclear Power Plant, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Donald C. Cook Nuclear Power Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

L. Weber The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D. C. Cook Nuclear Power Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV

L. Weber The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9628 with any questions you have regarding this letter.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

D. C. Cook Nuclear Power Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:

Anthony Bowers Carole Ariano RidsNrrDorlLpl3-1 Resource Linda Linn RidsNrrPMDCCook Resource DRPIII RidsNrrDirsIrib Resource DRSIII Cynthia Pederson Patricia Buckley Darrell Roberts Carmen Olteanu Steven Orth ROPassessment.Resource@nrc.gov Allan Barker DOCUMENT NAME: DC Cook MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =

Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME KRiemer:rj DATE 08/26/14 OFFICIAL RECORD COPY

Page 1 of 2 D.C. Cook 08/22/2014 09:33:45 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI ISI - INSERVICE INSPECTION - UNIT 1 4 2 09/30/2014 10/24/2014 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/06/2014 10/10/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/06/2014 10/10/2014 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 11/03/2014 11/07/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 11/03/2014 11/07/2014 IP 71151-BI01 1 11/03/2014 11/07/2014 IP 71151-OR01 1 11/03/2014 11/07/2014 IP 71151-PR01 BI HS - TRIENNIAL HEAT SINK INSPECTION 2 1 01/26/2015 01/30/2015 IP 7111107T Heat Sink Performance BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 02/02/2015 02/06/2015 IP 71124.05 Radiation Monitoring Instrumentation BI ISI - UNIT 2 ISI INSPECTION 1 2 03/25/2015 04/25/2015 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 04/06/2015 04/10/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/06/2015 04/10/2015 IP 71124.02 Occupational ALARA Planning and Controls ISFSI - ISFSI INSPECTION 2 1, 2 06/01/2015 06/30/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 07/13/2015 07/17/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 07/13/2015 07/17/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 07/13/2015 07/17/2015 IP 71151-BI01 1 07/13/2015 07/17/2015 IP 71151-OR01 1 07/13/2015 07/17/2015 IP 71151-PR01 BI EPX - EP EXERCISE INSPECTION / PI VERIFICATION 2 1 10/26/2015 10/30/2015 IP 71151 Performance Indicator Verification PI&R - BIENNIAL PROBLEM ID AND RESOLUTION 4 1, 2 09/14/2015 10/02/2015 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/05/2015 10/09/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 D.C. Cook 08/22/2014 09:33:45 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 10/05/2015 10/09/2015 IP 71124.02 Occupational ALARA Planning and Controls BI ENG - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 11/02/2015 12/04/2015 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.