UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 2, 2014 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
Dear Mr. Weber:
On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Donald C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Donald C. Cook Nuclear Power Plant, Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Donald C. Cook Nuclear Power Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9628 with any questions you have regarding this letter.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
D. C. Cook Nuclear Power Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9628 with any questions you have regarding this letter.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
D. C. Cook Nuclear Power Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:
Anthony Bowers RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: DC Cook MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII E
RIII RIII RIII NAME KRiemer:rj DATE 08/26/14 OFFICIAL RECORD COPY
Page 1 of 2 08/22/2014 09:33:45 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2014 - 12/31/2015 BI ISI
- INSERVICE INSPECTION - UNIT 1 4
2 IP Inservice Inspection Activities - PWR 7111108P 09/30/2014 10/24/2014 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/06/2014 10/10/2014 1
IP Occupational ALARA Planning and Controls 71124.02 10/06/2014 10/10/2014 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Environmental Monitoring Program 71124.07 11/03/2014 11/07/2014 1
IP 71151-BI01 11/03/2014 11/07/2014 1
IP 71151-OR01 11/03/2014 11/07/2014 1
IP 71151-PR01 11/03/2014 11/07/2014 BI HS
- TRIENNIAL HEAT SINK INSPECTION 2
1 IP Heat Sink Performance 7111107T 01/26/2015 01/30/2015 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiation Monitoring Instrumentation 71124.05 02/02/2015 02/06/2015 BI ISI
- UNIT 2 ISI INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 03/25/2015 04/25/2015 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/06/2015 04/10/2015 1
IP Occupational ALARA Planning and Controls 71124.02 04/06/2015 04/10/2015 ISFSI
- ISFSI INSPECTION 2
1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2015 06/30/2015 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Occupational ALARA Planning and Controls 71124.02 07/13/2015 07/17/2015 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/13/2015 07/17/2015 1
IP 71151-BI01 07/13/2015 07/17/2015 1
IP 71151-OR01 07/13/2015 07/17/2015 1
IP 71151-PR01 07/13/2015 07/17/2015 BI EPX
- EP EXERCISE INSPECTION / PI VERIFICATION 2
1 IP Performance Indicator Verification 71151 10/26/2015 10/30/2015 PI&R
- BIENNIAL PROBLEM ID AND RESOLUTION 4
1, 2 IP Problem Identification and Resolution 71152B 09/14/2015 10/02/2015 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/05/2015 10/09/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/22/2014 09:33:45 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2014 - 12/31/2015 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Occupational ALARA Planning and Controls 71124.02 10/05/2015 10/09/2015 BI ENG
- COMPONENT DESIGN BASIS INSPECTION 6
1, 2 IP Component Design Bases Inspection 7111121 11/02/2015 12/04/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.