UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
March 17, 2017
Mr. Joel P. Gebbie
Senior VP and Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION
OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
REQUEST FOR INFORMATION; INSPECTION REPORT 05000315/2017002;
Dear Mr. Gebbie:
On June 19, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
of the Triennial Heat Sink Performance Inspection at your Donald C. Cook Nuclear Power Plant,
Units 1 and 2. This inspection will be performed in accordance with NRC baseline Inspection
Procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
The first group lists information necessary for our initial inspection scoping activities.
This information should be available to the lead inspector no later than May 5, 2017.
By May 12, 2017, the inspector will communicate the initial selected set of approximately
2-3 risk significant heat exchangers.
The second group is needed to support our in-office preparation activities. This set of
documents, including the calculations associated with the selected heat exchangers,
should be available at the Regional Office no later than June 5, 2017. This information
should be separated for each selected component, especially if provided electronically
(e.g., folder with component name that includes calculations, condition reports,
maintenance history, etc.). During the in-office preparation activities, the inspector may
identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant specific
reference material. This information should be available onsite to the inspector on
June 19, 2017. It is also requested that corrective action documents and/or questions
developed during the inspection be provided to the inspector as the documents are
generated.
J. Gebbie -2-
All requested documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during the
preparation week or during the onsite inspection.
The lead inspector for this inspection is Mr. Lionel Rodriguez. We understand that our
licensing contact for this inspection is Mr. Michael B. Ellett of your organization. If there are
any questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at 630-829-9609 or via e-mail at Lionel.Rodriguez@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Lionel Rodriguez, Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure:
Triennial Heat Sink Performance Inspection
Document Request
cc: Distribution via LISTSERV
J. Gebbie -3-
Letter to Joel P. Gebbie from Lionel Rodriguez dated March 17, 2017
SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION
OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
REQUEST FOR INFORMATION; INSPECTION REPORT 05000315/2017002;
DISTRIBUTION:
RidsNrrDorlLpl3-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML17076A359
OFFICE RIII RIII RIII RIII
NAME LRodriguez:cl
DATE 03/17/17
OFFICIAL RECORD COPY
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report: 05000315/2017002; 05000316/2017002
Inspection Dates: June 19 - 23, 2017
Inspection Procedure: IP 71111.07, Heat Sink Performance
Lead Inspector: Lionel Rodriguez
630-829-9609
Lionel.Rodriguez@nrc.gov
Please provide the information electronically in pdf files, Excel, or other searchable formats,
preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic
media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
I. Information Requested By May 5, 2017
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Safety-Related Equipment, heat exchangers in order of risk significance.
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
exchanger.
3. List of Corrective Action Program (CAP) documents (with a short description)
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,
aging, or heat exchanger testing, ultimate heat sink (UHS), and safety-related
service and closed cooling water systems for the previous 3 years or since the last
CAP document list was sent to the U.S. Nuclear Regulatory Commission for the
previous heat sink performance inspection. The list should include all CAP
documents not on the last CAP document list.
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and
safety-related service and closed cooling water systems since the last heat sink
performance inspection.
5. Last two System Health Report(s) and maintenance rule system notebooks for all the
GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
water systems.
6. List of engineering-related operator workarounds (with a short description)
associated with GL 89-13 heat exchangers. The requested documents are to be for
the time period from the onsite inspection period back to the documents that were
provided in response to the previous heat sink performance inspection.
Enclosure
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
7. List of permanent and temporary modifications (with a short description) associated
with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
water systems. The requested documents are to be for the time period from the
onsite inspection period back to the documents that were provided in response to the
previous heat sink performance inspection.
8. Electronic copies of the current Final Safety Analysis Report, Technical
Specifications, Technical Specifications Basis, and Technical Report Manual.
9. List of enhancements and/or commitments made during license renewal for
GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
water systems (as applicable).
II. Information Requested By June 5, 2017
1. Copies of the GL 89-13 responses.
2. Copies of procedures developed to implement the recommendations of GL 89-13
(e.g., the GL 89-13 Heat Exchanger Program description).
3. Copies of the selected CAP documents.
4. For the specific heat exchangers selected:
a. Copy of system description and design basis document for the heat exchangers
(as applicable).
b. Provide a list of calculations (with a short description) which currently apply to
each heat exchanger.
c. Provide the calculations or evaluations that:
i. establish the limiting design basis heat load required to be removed by
each of these heat exchangers;
ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
iii. correlate surveillance testing and/or inspection results from these heat
exchangers with design basis heat removal capability (e.g., basis for
surveillance test and/or inspection acceptance criteria);
iv. evaluate the potential for water hammer in each heat exchanger or
associated piping; and
v. evaluate excessive tube vibration in each heat exchanger.
d. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation
for the selected heat exchangers.
e. Copy of the design specification, heat exchanger data sheets, and vendor
documents including component drawings applicable for the selected heat
exchangers.
2
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
f. Copies of normal, abnormal, and emergency operating procedures associated
with the selected heat exchangers.
g. Copies of the Aging Management Programs (AMP) and the implementing
procedures that manage aging of the selected heat exchangers (as applicable).
5. For the UHS and the safety-related service and closed cooling water systems (or
equivalent):
a. Copy of system description and design basis document (as applicable).
b. Copy of any operability determinations or other documentation of degradation
associated with the UHS and the safety-related service and closed cooling water
systems.
c. Copy of the document (e.g., Updated Final Safety Analysis Report or Technical
Requirements Manual) that states the maximum cooling water system inlet
temperature limit that still allows full licensed power operation of the nuclear
reactor.
d. Copy of system description and design basis document (as applicable).
e. Copy of the construction code and Design Specification.
f. Copies of normal, abnormal, and emergency operating procedures associated
with the UHS and safety-related service and closed cooling water systems
including procedures for loss of these systems.
g. Copies of CAP documents associated with waterhammer or hydraulic transients
in the safety-related service and closed cooling water systems since the last Heat
Sink Inspection.
h. If available, provide an electronic copy of piping and instrumentation diagrams for
the service and closed cooling water systems, including the intake structure.
i. Provide a list of calculations (with a short description), which currently apply to
the UHS and safety-related service and closed cooling water systems.
j. Provide a list of instruments (with a short description) associated with automatic
or alarm functions for the UHS and safety-related service and closed cooling
water systems.
k. Provide a list of any design change (with a short description) performed on the
UHS and safety-related service and closed cooling water systems since the last
heat sink performance inspection.
l. Copies of the AMPs and the implementing procedures that manage aging of the
UHS (including the intake structure) and the safety-related service and closed
cooling water systems (as applicable).
6. A schedule of all inspections, cleanings, maintenance, or testing of any
safety-related plant heat exchanger to be performed during the onsite portion of
the inspection.
3
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
III. Information Requested to be Available on First Day of Inspection, June 19, 2017
1. For the specific heat exchangers selected.
a. Copy of the calculation which correlates surveillance testing results from these
heat exchangers with design basis heat removal capability (e.g., basis for
surveillance test acceptance criteria).
b. Copies of the two most recent completed tests and evaluation data confirming
thermal performance for those heat exchangers which are performance tested.
c. Documentation and procedures that identify the types, accuracy, and location of
any special instrumentation used for the two most recently completed thermal
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
instruments or temperature instruments). Include calibration records for the
instruments used during these tests.
d. Information regarding any alarms which monitor on-line performance.
e. Copy of the document describing the inspection results of each heat exchanger.
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
heat sink performance inspection.
f. The cleaning and inspection maintenance schedule for each heat exchanger for
the next 5 years.
g. Copy of the calculation which establishes the limiting (maximum) design basis
heat load which is required to be removed by each of these heat exchangers.
h. Copy of the operating procedure that ensures that the maximum cooling water
system inlet temperature limit is not exceeded.
i. Copy of the calculations or documents which evaluate the potential for water
hammer in each heat exchanger or associated piping.
j. Copy of the calculations that evaluate excessive tube vibration in each heat
exchanger and the documents that describe the controls that prevent heat
exchanger degradation due to excessive flow induced vibration during operation.
k. Copy of the periodic flow testing at or near maximum design flow. The requested
documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink
performance inspection.
l. Copy of the document which identifies the current number of tubes in service for
each heat exchanger and the supporting calculation which establishes the
maximum number of tubes which can be plugged in each heat exchanger.
m. Copy of the document establishing the repair criteria (plugging limit) for degraded
tubes which are identified in each heat exchanger.
4
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
n. Copies of the documents that verify the structural integrity of the heat exchanger
(e.g. eddy current summary sheets, ultrasonic testing results, and visual
inspection results).
o. Copies of those documents that describe the methods taken to control water
chemistry in the heat exchangers, including those credited by any AMPs (as
applicable).
p. Copies of any credited AMP monitoring/inspection results for the selected heat
exchangers (as applicable). The requested documents are to be for any
completed monitoring/inspection in the time period from the onsite inspection
period back to the documents that were provided in response to the previous
heat sink performance inspection.
2. For the review of the operation of the safety-related service water system (or
equivalent) and the UHS:
a. Copies of any design change performed on the UHS. The requested documents
are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink performance
inspection.
b. Copies of any design change performed on the safety-related service water
system. The requested documents are to be for the time period from the onsite
inspection period back to the documents that were provided in response to the
previous heat sink performance inspection.
c. Copies of procedures for a loss of UHS.
d. Copies of procedures for a loss of service water system.
e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,
dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp).
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
heat sink performance inspection.
f. Copies of documents associated with the monitoring of pump performance for
potential strong-pump vs. weak-pump interaction.
3. For the review associated with the system walkdown of the safety-related service
and closed cooling water systems:
a. Copies of the testing, inspection, or monitoring program procedures for buried or
inaccessible piping and the associated results. The requested documents are to
be for the time period from the onsite inspection period back to the documents
that were provided in response to the previous heat sink performance inspection.
b. Copies of the ultrasonic test results and/or visual inspections that verify the
structural integrity of the piping.
5
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
c. Copies of the procedures to monitor, assess, and disposition active thru wall pipe
leaks, including structural evaluations and/or planned corrective actions.
d. History of any thru wall pipe leak on the system. The requested documents are
to be for the time period from the onsite inspection period back to the documents
that were provided in response to the previous heat sink performance inspection.
e. Historical trend data for make-up to the safety-related closed cooling water
system. The requested documents are to be for the time period from the onsite
inspection period back to the documents that were provided in response to the
previous heat sink performance inspection.
f. Copies of the documents associated with the periodic inspection program used to
detect protective coating failure, corrosion, erosion, and aging.
g. Copies of the IST vibration monitoring results and operational history for deep
draft vertical pumps, if applicable. The requested documents are to be for the
time period from the onsite inspection period back to the documents that were
provided in response to the previous heat sink performance inspection.
h. Copies of any credited AMP monitoring/inspection results for the safety-related
service and closed cooling water systems, and the UHS (as applicable). The
requested documents are to be for any completed monitoring/inspection in the
time period from the onsite inspection period back to the documents that were
provided in response to the previous heat sink performance inspection.
If the information requested above will not be available, please contact Lionel Rodriguez as
soon as possible at 630-829-9609 or e-mail Lionel.Rodriguez@nrc.gov.
6