UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, IL 60532-4352
July 28, 2016
Mr. Joel Gebbie
Senior VP and Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2 - REQUEST FOR
INFORMATION FOR AN NRC POST-APPROVAL SITE INSPECTION FOR
LICENSE RENEWAL INSPECTION REPORT 5000316/2016010
Dear Mr. Gebbie:
On October 3, 2016 the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval
Site Inspection for License Renewal at your Donald C. Cook Nuclear Power Plant, Unit 2. This
inspection will be performed in accordance with NRC Inspection Procedure 71003. This
inspection will focus on outage related activities to verify license conditions added as part of
your renewed license and a sample of license renewal commitments have been implemented.
In order to minimize the inspection impact on the site and to ensure a productive inspection
for both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the team will identify as much
as possible the information and activities to be reviewed during the inspection. This information
should be provided to the lead inspector by September 19, 2016.
The second group includes the additional information required for the team to review the
selected activities. This information should be available to the team onsite October 3, 2016.
It is also requested that corrective action documents and/or questions developed during the
inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Mr. Benny Jose. We understand that our primary
contact for this inspection is Mr. Richard Wynegar of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
lead inspector at 630-829-9756, or via e-mail at Benny.Jose@nrc.gov.
J. Gebbie
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA Mark Jeffers Acting for/
Benny Jose, Senior Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure:
Post-Approval Site Inspection for License
Renewal Document Request
cc: Distribution via LISTSERV
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL DOCUMENT REQUEST
Enclosure
Inspection Report: 05000316/2016010(DRS)
Inspection Dates:
October 3 - 7, 2016
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License Renewal
Lead Inspector:
630-829-9756
Benny.Jose@nrc.gov
I.
Information Requested Prior to the Onsite Inspection Week
The following information is requested by September 19, 2016, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the team leader as soon as possible. (Please provide the information electronically in
pdf files, Excel, or other searchable formats, preferably on some portable electronic
media (e.g., CDROM, DVD, etc.). The portable electronic media should contain
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
in lists should contain enough information to be easily understood by someone who
has knowledge of light water reactor technology).
1. Provide a list of your license renewal commitments with an approximate completion
status of each.
2. Provide a list of your Aging Management Programs (AMPs), copies of the program
basis documents for each, and a listing of the action tracking items for each.
3. For Aging Management Programs that are one-time inspection programs, provide a
list of completed work order numbers for inspections that have been completed. This
may be incorporated with the previous item and should include identification of the
inspected component.
4. Provide a list of the one-time inspections credited for license renewal that will be
completed during your outage. This list should include at least the system,
component, work order number, and type of inspection.
5. Provide a listing of other planned inspections which will be conducted during the
outage, that are credited for license renewal. Of particular interest are those that
provide observations of areas that are generally inaccessible at power, e.g., tank
internal inspections and containment coating inspections. Include work order
numbers where applicable.
6. Provide an outage schedule, sufficiently detailed as to list the work orders noted in
Items 4 and 5.
7. Provide current management and license renewal organizational charts.
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL DOCUMENT REQUEST
2
8. Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements Manual.
9. Provide copies of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
II.
Information Requested to be Available When the Inspectors Arrive Onsite on
October 3, 2016
1. Copies of the work orders requested during the preparation week. This will include
work orders of inspections to be observed and completed work orders to be reviewed
by the team.
2. Contact information for the Outage Control Center to facilitate inspector observation
of the selected work orders.
3. Documentation demonstrating completion of license renewal commitments which are
complete as of the inspection date. For example, this may be in the form of a binder
for each commitment which includes the implementing documentation and
references.
III.
Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
If you have questions regarding the information requested, please contact the lead inspector.
J. Gebbie
-2-
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
Sincerely,
/RA Mark Jeffers Acting for/
Benny Jose, Senior Reactor Inspector
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure:
Post-Approval Site Inspection for License
Renewal Document Request
cc: Distribution via LISTSERV
DISTRIBUTION:
RidsNrrDorlLpl3-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
ADAMS Accession Number ML16211A032
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy