Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
Dear Mr. Weber:
On August 8, 2012, the NRC completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal; Temporary Instruction (TI) 2515/177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems; TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping; TI 2515/187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walk downs; TI 2515/188, Inspection of Near-Term
L. Weber Task Force Recommendation 2.3 Seismic Walk downs; Independent Spent Fuel Storage Installation (ISFSI) inspections: IP 60854.1, Preoperational Testing of ISFSIs at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. In addition, a team inspection involving IP 71152B, Biennial Problem Identification and Resolution, is scheduled in 2013.
In accordance with 10 CFR 2.390 of the NRCs ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
Distribution via ListServ TM
L. Weber Task Force Recommendation 2.3 Seismic Walk downs; Independent Spent Fuel Storage Installation (ISFSI) inspections: IP 60854.1, Preoperational Testing of ISFSIs at Operating Plants; IP 60855.1, Operation of an ISFSI at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b) Evaluations at Operating Plants. In addition, a team inspection involving IP 71152B, Biennial Problem Identification and Resolution, is scheduled in 2013.
In accordance with 10 CFR 2.390 of the NRCs ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
Distribution via ListServ TM DOCUMENT NAME: G:\\DRPIII\\1-Secy\\1-Work In Progress\\2012 MOC Letters\\DC Cook MOC Letter to Licensee.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME SShah:dtp JGiessner DATE 08/22/12 08/24/12 OFFICIAL RECORD COPY
Letter to L. Weber from J. Giessner dated September 4, 2012.
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 DISTRIBUTION:
Silas Kennedy RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2012 - 12/31/2013 TI-188
- TI-188 SEISMIC WALKDOWN 2
IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 06/30/2012 12/30/2012 TI-187
- TI-187 FLOODING WALKDOWN 2
IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/31/2012 BI HS
- TRIENNIAL HEAT SINK INSPECTION 2
IP Heat Sink Performance 7111107T 11/26/2012 11/30/2012 TI 182
- TI 182 PHASE 1 BURIED PIPING 1
IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 11/26/2012 11/30/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTIO 1
IP Radiation Monitoring Instrumentation 71124.05 12/10/2012 12/14/2012 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/04/2013 02/08/2013 IP Occupational Dose Assessment 71124.04 02/04/2013 02/08/2013 BI OLRQ
- REQUALIFICATION PROGRAM INSPECTION 1
IP Licensed Operator Requalification Program - Annual Review 7111111A 02/25/2013 03/01/2013 RENEWAL
- LICENSE RENEWAL INSPECTION-71003 PHASE 1 4
IP Post-Approval Site Inspection for License Renewal 71003 03/25/2013 04/26/2013 BI ISI
- INSERVICE INSPECTION - UNIT 1 2
IP Inservice Inspection Activities - PWR 7111108P 03/25/2013 04/28/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2013 04/12/2013 IP Occupational ALARA Planning and Controls 71124.02 04/08/2013 04/12/2013 BI FIRE
- FIRE PROTECTION INSPECTION & BAG TRIP 3
IP Fire Protection [Triennial]
7111105T 05/27/2013 06/28/2013 BI EPX
- EP EXERCISE INSPECTION / PI VERIFICATION 2
IP Exercise Evaluation 7111401 06/03/2013 06/07/2013 IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTIO 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/15/2013 07/19/2013 BI PI&R
- BIENNIAL PI&R INSPECTION 4
IP Problem Identification and Resolution 71152B 08/26/2013 09/13/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/12/2013 08/16/2013
Page 2 of 2 Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2012 - 12/31/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Environmental Monitoring Program 71124.07 08/12/2013 08/16/2013 IP Reactor Coolant System Activity 71151-BI01 08/12/2013 08/16/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 08/12/2013 08/16/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 08/12/2013 08/16/2013 BI ISI
- INSERVICE INSPECTION - UNIT 1 2
IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/25/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/07/2013 10/11/2013 IP Occupational ALARA Planning and Controls 71124.02 10/07/2013 10/11/2013