UNITED STATES
NUCLEAR REGULATORY COMMISSION
LISLE, IL 60532-4352
November 13, 2014
Mr. Larry Weber
Senior Vice President and Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST
FOR INFORMATION INSPECTION 05000315/2015002; 05000316/2015002
Dear Mr. Weber:
On Monday, January 26, 2015, the U.S. Nuclear Regulatory Commission (NRC) will begin the
on-site portion of the Triennial Heat Sink Performance Inspection at your Donald C. Cook
Nuclear Power Plant, Units 1 and 2. This inspection will be performed in accordance with NRC
baseline inspection procedure (IP) 71111.07, Heat Sink Performance.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
- The first group lists information necessary for our initial inspection scoping activities. This
information should be available to the lead inspector no later than December 8, 2014. By
December 12, 2014, the lead inspector will communicate the initial selected set of
approximately 2-3 risk significant heat exchangers.
- The second group is needed to support our in-office preparation activities. This set of
documents, including the calculations associated with the selected heat exchangers,
should be available at the Regional Office no later than January 12, 2015. This information
should be separated for each selected component, especially if provided electronically
(e.g., folder with component name that includes calculations, condition reports,
maintenance history, etc). During the in-office preparation activities, the inspectors may
identify additional information needed to support the inspection.
- The last group includes the additional information above as well as plant specific reference
material. This information should be available onsite to the inspectors on January 26,
2015. It is also requested that corrective action documents and/or questions developed
during the inspection be provided to the inspector as the documents are generated.
L. Weber -2-
All requested documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink performance
inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during
the preparation week or during the on-site inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our
regulatory contact for this inspection is Mr. S. Mitchell of your organization. If there are
questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at
(630) 829-9739. Please send the information to the following e-mail address
nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information
is also an acceptable option.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of
this letter and its enclosure will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records System (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS), accessible from
the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading
Room).
Sincerely,
/RA by R. C. Daley Acting For/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure:
Triennial Heat Sink Performance Inspection
Document Request
cc w/encl: Distribution via LISTSERV
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report: 05000315/2015002; 05000316/2015002
Inspection Dates: January 26 - 30, 2015
Inspection Procedure: Inspection Procedure 71111.07, Heat Sink Performance
Lead Inspector: Néstor J. Féliz Adorno
(630) 829-9739
nestor.feliz-adorno@nrc.gov
I. Information Requested By December 8, 2014
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Safety-Related Equipment, heat exchangers in order of risk significance.
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
exchanger.
3. List of Corrective Action Program documents (with a short description) associated
with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat exchanger
testing, ultimate heat sink (UHS), and safety-related service and closed cooling water
systems for the previous three years or since the last Corrective Action Program
document list was sent to the NRC for the previous heat sink performance inspection.
The list should include all Corrective Action Program documents not on the last
Corrective Action Program document list.
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and
safety-related service and closed cooling water systems since the last heat sink
performance inspection.
5. Last two System Health Report(s) and maintenance rule system notebooks for all the
GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water
systems.
6. List of engineering-related operator workarounds (with a short description) associated
with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
water systems. The requested documents are to be for the time period from the
onsite inspection period back to the documents that were provided in response to the
previous heat sink performance inspection.
7. List of permanent and temporary modifications (with a short description) associated
with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
water systems. The requested documents are to be for the time period from the
onsite inspection period back to the documents that were provided in response to the
previous heat sink performance inspection.
1 Enclosure
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
8. List of risk significant non-safety-related functions (with a short description) of the
service water system and UHS.
II Information Requested By January 12, 2015
1. Copies of the GL 89-13 responses and commitments.
2. Copies of procedures developed to implement the recommendations of GL 89-13
(e.g., the GL 89-13 Heat Exchanger Program description).
3. Copies of the selected Corrective Action Program documents.
4. For the specific heat exchangers selected:
a. Copy of system description and design basis document for the heat exchangers
(as applicable).
b. Provide a list of calculations (with a short description) which currently apply to
each heat exchanger.
c. Provide the calculations or evaluations that:
i. establish the limiting design basis heat load required to be removed by each of
these heat exchangers;
ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
iii. correlate surveillance testing and/or inspection results from these heat
exchangers with design basis heat removal capability (e.g., basis for
surveillance test and/or inspection acceptance criteria);
iv. evaluate the potential for water hammer in each heat exchanger or associated
piping; and
v. evaluate excessive tube vibration in each heat exchanger.
d. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the operation for
the selected heat exchangers.
e. Copy of the design specification, heat exchanger data sheets, and vendor
documents including component drawings applicable for the selected heat
exchangers.
f. Copies of normal, abnormal, and emergency operating procedures associated
with the selected heat exchangers.
5. For the UHS and the safety-related service and closed cooling water systems (or
equivalent):
2
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
a. Copy of system description and design basis document (as applicable).
b. Copy of any operability determinations or other documentation of degradation
associated with the UHS and the safety-related service and closed cooling water
systems.
c. Copy of the document (e.g. UFSAR or Technical Requirements Manual) that
states the maximum cooling water system inlet temperature limit that still allows
full licensed power operation of the nuclear reactor.
d. Copy of the construction code and Design Specification.
e. Copies of normal, abnormal, and emergency operating procedures associated
with the UHS and safety-related service water systems including procedures for
loss of these systems.
f. Copies of the procedures associated with in-service test of the safety-related
service and closed cooling water pumps.
g. Copies of corrective action documents associated with waterhammer or hydraulic
transients in the service water system since the last Heat Sink Inspection.
h. If available, provide an electronic copy of piping and instrumentation diagrams
(P&IDs) for the service water system and closed cooling water systems, including
the intake structure.
i. Provide a list of calculations (with a short description), which currently apply to
UHS and service water system and closed cooling water systems.
j. Copies of calculations and surveillances that determine the UHS reservoir
capacity and heat transfer capability.
k. Copy of calculation addressing safety-related service and closed cooling water
systems flow balance.
l. Provide a list of instruments (with a short description) associated with automatic or
alarm functions for the safety-related service and closed cooling water systems
and/or UHS.
m. Provide a list of any design change (with a short description) performed on the
UHS or safety-related service water system since the last heat sink performance
inspection.
6. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related
plant heat exchanger to be performed during the on-site portion of the inspection.
7. Electronic copies of the current Final Safety Analysis Report, Technical
Specifications, Technical Specifications Basis, and Technical Report Manual.
3
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
III Information Requested to be Available on First Day of Inspection, January 26, 2015
1. For the specific heat exchangers selected:
a. Copies of the two most recent completed tests and evaluation data confirming
thermal performance for those heat exchangers which are performance tested.
b. Documentation and procedures that identify the types, accuracy, and location of
any special instrumentation used for the two most recently completed thermal
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
instruments or temperature instruments). Include calibration records for the
instruments used during these tests.
c. Information regarding any alarms which monitor on-line performance.
d. Copy of the document describing the inspection results of each heat exchanger.
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous heat
sink performance inspection.
e. The cleaning and inspection maintenance schedule for each heat exchanger for
the next five years.
f. Copy of the operating procedure that ensures that the maximum cooling water
system inlet temperature limit is not exceeded.
g. Copy of the periodic flow testing at or near maximum design flow. The requested
documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink
performance inspection.
h. Copy of the document which identifies the current number of tubes in service for
each heat exchanger and the supporting calculation which establishes the
maximum number of tubes which can be plugged in each heat exchanger.
i. Copy of the document establishing the repair criteria (plugging limit) for degraded
tubes which are identified in each heat exchanger.
j. Copies of the documents that verify the structural integrity of the heat exchanger
(e.g., eddy current summary sheets, ultrasonic testing results, and visual
inspection results).
k. Copies of those documents that describe the methods taken to control water
chemistry in the heat exchangers.
2. For the review of the safety-related service and closed cooling water systems and
UHS:
a. Copies of the inspection procedures for the verification of the structural integrity of
4
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
underwater UHS structures and components, and the associated results. The
requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous heat
sink performance inspection.
b. Copies of the maintenance and/or inspection procedures for underwater UHS
structures and components sediment intrusion, and the associated results
including underwater diving inspections and/or sediment removal activities. The
requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous heat
sink performance inspection.
c. Copies of calculations and surveillances that determine the UHS reservoir
capacity and heat transfer capability.
d. Copies of surveillance procedures and testing results performed on the
instrumentation relied upon to determine UHS reservoir capability. The requested
documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink
performance inspection.
e. Copies of documents associated with the periodic monitoring and trending of
sediment built-up.
f. Copies of the procedures used for verifying that adjacent non-seismic or non-
safety related structures cannot degrade or block safety-related flow paths during
severe weather or seismic events.
g. Copies of the last two performance tests, such as the ASME in-service test, for
the pumps, valves, and, if applicable, the towers fans in the safety-related service
water system. If the components are not performance tested, please provide
documentation verifying performance by the methods actually used.
h. Copies of the documents that demonstrate that flow balance testing of the
safety-related service water system was performed during the last three years. If
the last flow test was performed longer than three years, then provide the last flow
test.
i. Copies of the documents that demonstrate that flow balance testing will continue
to be periodically done in the future.
j. Copies of procedures used to monitor interface valves between the
safety-related sections of the service and closed cooling water systems, the
non-safety-related sections, and the associated results. The requested
documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink
performance inspection.
k. Copies of the procedures that verify the performance of risk significant non-safety
functions of the safety-related service water system and the associated results.
5
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
The requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous heat
sink performance inspection.
l. Copies of corrective maintenance for the last six years associated with service
water strainers, traveling screens and trash racks.
m. Copies of the last two inspections and/or surveillances associated with service
water strainers, traveling screens and trash racks.
n. List of preventive maintenance, including frequency, associated with service water
strainers, traveling screens and trash racks.
o. Copies of abnormal procedures for the traveling screens and service water
strainers.
p. Copies of the last two inspections and/or surveillances documenting that
component mounts have not excessively degraded (i.e., due to corrosion). For
example, inspections for the mounts for the, service water pumps, service water
strainers, traveling screens and trash racks.
q. Copies of surveillance procedures and testing results performed on the service
water pump bay water level instruments. The requested documents are to be for
the time period from the onsite inspection period back to the documents that were
provided in response to the previous heat sink performance inspection.
r. Copies of procedures associated with operating during adverse weather
conditions (e.g., icing, high temperatures, or low level).
s. Copy of the evaluation for the potential effects of low flow/level on underwater
weir walls intended to limit silt or sand intake, if applicable.
If the information requested above will not be available, please contact Néstor J. Féliz Adorno as
soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov
6
L. Weber -2-
All requested documents are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink performance inspection. If no
activities were accomplished in that time period, then the request applies to the last applicable document
in the previous time period. It is important that these documents be as complete as possible, in order to
minimize the number of documents requested during the preparation week or during the on-site
inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory
contact for this inspection is Mr. S. Mitchell of your organization. If there are questions about the material
requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the
information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc
(CD) with the required information is also an acceptable option.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget Control Number.
In accordance with Title 10, Code of Federal Regulations (CFR) "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA by R. C. Daley Acting For/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-315; 50-316
Enclosure:
Triennial Heat Sink Performance Inspection
Document Request
cc w/encl: Distribution via LISTSERV
DOCUMENT NAME: G:\DRSIII\DRS\Ltr 11 14 DC Cook HS RFI 2015 NFA.doc
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE RIII RIII
NAME NFAdorno:ls RCDaley for AMStone
DATE 11/13/14 11/13/14
OFFICIAL RECORD COPLette
Letter to Larry Weber from Ann Marie Stone dated November 13, 2014.
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF
NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST
FOR INFORMATION Inspection 05000315/2015002; 05000316/2015002
DISTRIBUTION:
John Jandovitz
RidsNrrDorlLpl3-1 Resource
RidsNrrPMDCCook Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII