IR 05000261-13-007, on 04/08-12, 04/22-26, 05/13-17/2013, Notification of H. B. Robinson Steam Electric Plant - Component Design Bases
ML12326A782
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/21/2012
From: Nease R
NRC/RGN-II/DRS/EB1
To: William Gideon
Progress Energy Carolinas
References
IR-13-007
Download: ML12326A782 (9)


See also: IR 05000261/2013007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

November 21, 2012

Mr. William R. Gideon

Vice President

Progress Energy

H. B. Robinson Steam Electric Plant, Unit 2

3581 West Entrance Rd

Hartsville, SC 29550

SUBJECT: NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000261/2013007

Dear Mr. Gideon:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection (CDBI) at your H.B. Robinson

Steam Electric Plant Unit 2 during the weeks of April 08 - 12, April 22 - 26, and May 13 - 17,

2013. The inspection team will be led by Jason Eargle, a Senior Reactor Inspector from the

NRC's Region II Office. This inspection will be conducted in accordance with the baseline

inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued

August 14, 2012.

The inspection will evaluate the capability of risk significant/low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on November 19, 2012, Mr. Eargle confirmed with Michael

Pastva of your staff, arrangements for an information-gathering site visit and the three-week

onsite inspection. The schedule is as follows:

  • Information-gathering visit: Week of March 18 - 22, 2013
  • Onsite weeks: April 08 - 12, April 22 - 26, and May 13 - 17, 2013

The purpose of the information-gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. George MacDonald, a Region II Senior

Reactor Analyst, will support Mr. Eargle during the information-gathering visit to review

probabilistic risk assessment data and identify risk significant components, which will be

examined during the inspection.

The Enclosure lists documents that will be needed prior to the information-gathering visit.

Please provide the referenced information to the Region II office by February 18, 2013. The

W. Gideon 2

inspectors will try to minimize your administrative burden by specifically identifying only those

documents required for inspection preparation.

Additional documents will be requested during the information-gathering visit. The additional

information will need to be made available to the team in the Region II office prior to the

inspection teams preparation week of April 1. Mr. Eargle, will also discuss the following

inspection support administrative details: (1) availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection, (2) method of tracking

inspector requests during the inspection, (3) licensee computer access, (4) working space, (5)

arrangements for site access, and (6) other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

Enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Eargle at 404-997-4632 or me

at 404-997-4530.

Sincerely,

/RA/

Rebecca L. Nease, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

Enclosure:

Information Request for H.B. Robinson Steam

Electric Plant - Component Design Bases

Inspection

cc: (See page 3)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE

NAME EARGLE NEASE

DATE 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012 11/ /2012

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

W. Gideon 3

cc:

Division of Radiological Health Brian C. McCabe

TN Dept. of Environment & Conservation Manager, Nuclear Oversight

401 Church Street Shearon Harris Nuclear Power Plant

Nashville, TN 37243-1532 Progress Energy

Electronic Mail Distribution

Donald W. Barker

Manager, Nuclear Oversight Richard Hightower

H. B. Robinson Steam Electric Plant, Unit 2 Supervisor

Progress Energy Licensing/Regulatory Programs

Electronic Mail Distribution Progress Energy

Electronic Mail Distribution

J. W. (Bill) Pitesa

Senior Vice President Joseph W. Donahue

Nuclear Operations Vice President

Duke Energy Corporation Nuclear Oversight

Electronic Mail Distribution Progress Energy

Electronic Mail Distribution

Lara S. Nichols

Deputy General Counsel David T. Conley

Duke Energy Corporation Senior Counsel

Electronic Mail Distribution Legal Department

Progress Energy

M. Christopher Nolan Electronic Mail Distribution

Director - Regulatory Affairs

General Office John H. O'Neill, Jr.

Duke Energy Corporation Shaw, Pittman, Potts & Trowbridge

Electronic Mail Distribution 2300 N. Street, NW

Washington, DC 20037-1128

Mike Glover

Director Site Operations Richard Haynes

H. B. Robinson Steam Electric Plant Director, Division of Waste Management

Electronic Mail Distribution Bureau of Land and Waste Management

S.C. Department of Health and

Richard Keith Holbrook Environmental Control

Operations Manager Electronic Mail Distribution

H. B. Robinson Steam Electric Plant

Electronic Mail Distribution Thomas Cosgrove

Plant General Manager

Sandra Threatt, Manager H.B. Robinson Steam Electric Plant, Unit 2

Nuclear Response and Emergency Progress Energy

Environmental Surveillance Electronic Mail Distribution

Bureau of Land and Waste Management

Department of Health and Environmental Donna B. Alexander

Control Manager, Nuclear Regulatory Affairs

Electronic Mail Distribution (interim)

Progress Energy

Sharon Wheeler Electronic Mail Distribution

Manager, Support Services

H B Robinson Steam Electric Plant

Electronic Mail Distribution (cc contd - See page 4)

W. Gideon 4

(cc contd) Christos Kamilaris

Robert P. Gruber Manager, Support Services

Executive Director H.B. Robinson Steam Electric Plant, Unit 2

Public Staff - NCUC Progress Energy

4326 Mail Service Center Electronic Mail Distribution

Raleigh, NC 27699-4326

John W. Flitter

W. Lee Cox, III Director of Electric & Gas Regulation

Section Chief South Carolina Office of Regulatory Staff

Radiation Protection Section Electronic Mail Distribution

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Greg Kilpatrick

Operations Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Mark Yeager

Division of Radioactive Waste Mgmt.

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211

Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Henry Curry

Training Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

Letter to William R. Gideon from Rebecca L. Nease dated November 21, 2012.

SUBJECT: NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000261/2013007

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMRobinson Resource

INFORMATION REQUEST FOR CATAWBA NUCLEAR STATION

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. (or FTP site, Sharepoint, etc.) The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance

b. A list of the top 500 cutsets

2. From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA): one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance

b. A list of the top 500 cutsets

3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised (significant) since October

1, 2010, with a brief description of each revision.

6. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

rated design heat removal, and MOV risk-margin rankings, etc.), and associated

evaluations or calculations.

7. List of station operating experience evaluations/reviews performed, and documented in the

stations corrective action program, for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC Generic Communications, Industry

Communications, 10 CFR Part 21 Notifications, etc.] since October 1, 2010.

8. List and brief description of safety related SSC design modifications implemented since

October 1, 2010.

9. List and brief description of common-cause component failures that have occurred since

October 1, 2010.

10. List and brief description of operability evaluations completed since October 1, 2010.

Enclosure

2

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s).

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status since

October 1, 2010, to present.

14. Copies of System Descriptions (or the like design basis documents) for Safety-Related

Systems.

15. Copy of UFSAR(s).

16. Copy of Technical Specification(s).

17. Copy of Technical Specifications Bases.

18. Copy of Technical Requirements Manual(s).

19. List and brief description of Root Cause Evaluations that have been performed since

October 1, 2010.

20. In-service Testing Program Procedure(s).

21. Corrective Action Program Procedure(s).

22. One line diagram of electrical plant. (Electronic and full size - hard copy week of March 18)

23. Index and legend for electrical plant one-line diagrams.

24. Primary AC calculation(s) for safety-related buses.

25. Primary DC calculation(s) for safety-related buses.

26. PI&Ds for Safety-Related systems. (Electronic and 1/2 size - hard copy week of March 18)

27. Index and Legend for PI&Ds.

28. Copy of Operability determination procedure(s).

30. Copies of condition reports associated with findings from previous CDBI.

31. Index (procedure number, titles, and current revision) of station Emergency Operating

Procedures (EOPs), Abnormal Operating Procedures (AOPs), and Annunciator Response

Procedures (ARPs).

32. Copy of any self-assessments performed in preparation for this inspection.

Enclosure

3

33. List of any condition reports generated in preparation for this inspection.

34. Copies of condition reports generated from previous CDBI (2010).

35. Contact information for a person to discuss PRA information prior to the information-

gathering trip. (Name, title, phone number, and e-mail address)

Enclosure