Request for Additional Information Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite Circuit
ML12216A130
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/03/2012
From: Siva Lingam
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Lingam, Siva
References
TAC ME8772, TAC ME8773
Download: ML12216A130 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 3, 2012 Mr. Joseph W. Shea Manager, Corporate Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF THE UNIT STATION SERVICE TRANSFORMERS AS A POWER SUPPLY TO AN OFFSITE CIRCUIT (TAC NOS. ME8772 AND ME8773)

Dear Mr. Shea:

By letter dated May 23,2012, you submitted an application for a license amendment to revise the Sequoyah Nuclear Plant, Units 1 and 2, Technical Specification 3/4.8.1 to include a surveillance requirement to demonstrate the required offsite circuits OPERABLE at least once per 18 months by manually and automatically transferring the power supply to a 6.9 kilovolt unit board from the normal supply to the alternate supply. This change is necessary as a result of the planned modifications to the plant design and operating configuration that will allow use of the unit station service transformers as a power supply to an offsite circuit.

The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is required to complete its evaluation. This request was discussed with Mr. Clyde Mackaman of your staff on August 2, 2012, and it was agreed that a response would be provided within 30 days from the date of this letter.

If you have any questions regarding this matter, I can be reached at 301-415-1564.

Sincerely,

~ (f~ ~

Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 and 50-328

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO ALLOW USE OF THE UNIT STATION SERVICE TRANSFORMERS AS A POWER SUPPLY TO AN OFFSITE CIRCUIT SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328 By letter dated May 23, 2012 (Agencywide Documents Access and Management System Accession No. ML12146A385), the Tennessee Valley Authority submitted a license amendment request to revise the Sequoyah Nuclear Plant, Units 1 and 2, Technical Specification 3/4.8.1 to include a surveillance requirement (SR) to demonstrate the required offsite circuits OPERABLE at least once per 18 months by manually and automatically transferring the power supply to a 6.9 kilovolt unit board from the normal supply to the alternate supply. This change is necessary as a result of the planned modifications to the plant design and operating configuration that will allow use of the unit station service transformers as a power supply to an offsite circuit. In order to complete its review of the above documents, the U.S. Nuclear Regulatory Commission staff needs the following additional information:

1. Will any procedure changes be required to support the transformer modification (e.g.,

loss of off-site power)?

2. Will any changes to training be required to support the transformer modification? If not, how will operators know what changes were made? Note: Arguments made on the basis that the SR is virtually identical to the old SR are not acceptable - because the old SR was deleted in 1997, it should be treated as if it was new.
3. Will any changes to displays, controls, alarms, annunciators or the safety parameter display system be required to support the transformer modification?
4. Are the actions to manually back up the automatic reconfiguration of power sources performed in the control room? If not, what environmental conditions are expected?
5. Are there any time constraints on manual backup (e.g., are there time limits beyond which the action will not be effective, or equipment will be damaged)?
6. Does the licensee plan to perform a simulation or a walkthrough of the proposed manual actions under realistic conditions to determine whether:
  • the procedures are complete, technically accurate, and usable;
  • the training program appropriately addressed the changes in plant systems and the proposed action(s);
  • the proposed action(s) can be completed within the time criterion for each applicable scenario?

Enclosure

August 3, 2012 Mr. Joseph W. Shea Manager, Corporate Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF THE UNIT STATION SERVICE TRANSFORMERS AS A POWER SUPPLY TO AN OFFSITE CIRCUIT (TAC NOS. ME8772 AND ME8773)

Dear Mr. Shea:

By letter dated May 23, 2012, you submitted an application for a license amendment to revise the Sequoyah Nuclear Plant, Units 1 and 2, Technical Specification 3/4.8.1 to include a surveillance requirement to demonstrate the required offsite circuits OPERABLE at least once per 18 months by manually and automatically transferring the power supply to a 6.9 kilovolt unit board from the normal supply to the alternate supply. This change is necessary as a result of the planned modifications to the plant design and operating configuration that will allow use of the unit station service transformers as a power supply to an offsite circuit.

The U.S. Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is required to complete its evaluation. This request was discussed with Mr. Clyde Mackaman of your staff on August 2,2012, and it was agreed that a response would be provided within 30 days from the date of this letter.

If you have any questions regarding this matter, I can be reached at 301-415-1564.

Sincerely.

IRA!

Siva P. Lingam, Project Manager Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 and 50-328

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMSequoyah RidsNrrLABClayton RidsOgcMailCenter RidsNrrDorlDpr RidsAcrsAcnw_MaiICTR RidsNrrDraAhpb RidsRgn2MailCenter G. Lapinsky. NRR ADAMS Accession No: ML12216A130 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC A NAME SUn am JQuichocho DATE 08/03112 08/03/12 OFFICIAL RECORD COpy