ML120870217

From kanterella
Jump to navigation Jump to search
Revised Notice of Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding Seabrook Station Concrete Degradation
ML120870217
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/23/2012
From: John Lamb
Plant Licensing Branch 1
To: Meena Khanna
Plant Licensing Branch 1
Lamb J 301-415-3100
References
Download: ML120870217 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

      • REVISED***

March 23, 2012 MEMORANDUM TO: Meena Khanna, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH NEXTE ENERGY SEABROOK, LLC (NEXTERA) REGARDING SEABROOK STATION CONCRETE DEGRADATION DATE &TIME:

Monday, April 23, 2012 10:00 a.m. - 4:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-16B4 Rockville, Maryland PURPOSE:

The purpose of this meeting is to discuss NextEra's plans and schedule regarding concrete degradation caused by alkali silica reaction at Seabrook Station, as referenced in the NRC inspection report (ADAMS Accession No. ML120480066).

CATEGORY 1 *:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have one opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACT:

John G. Lamb, NRR 301-415-3100 JgI1@nrc.gov BRIDGE LINE:

1-800-857-9776 with Passcode 7212392#. There are a limited number of lines available. Please notify the meeting contact if you plan to use a bridge line.

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002.

M. Khanna

- 2 PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and Region I (R-I).

NRC NextEra C. Miller M. O'Keefe L. Lund M. Collins M. Galloway R. Noble A. Burritt R. Cliche R. Conte et al.

et al.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involvellistserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket No. 50-443

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA U.S. NUCLEAR REGULATORY COMMISSION AND NEXTERA SEABROOK STATION MEETING REGARDING CONCRETE DEGRADATION CAUSED BY ALKALI SILICA REACTION CONFERENCE ROOM 0-16B4 MONDAY, APRIL 23,2012 10:00 AM TO 4:30 PM Time Topic IPresenter Opening Statement INRC 10:00 -10:05 AM

~

~

h

~

~

~

~

~

'1. Iintroduction INRC 110:05 -10:15 AM

'2. ISeabrook ASR History and Overvie~_

INextEra 10:15 -10:30 AM ASR Plans and Schedule INextEra 110:30 -11:00 AM

3.

,4.

11:00 -12:00 PM Discussion INRC and NextEra

... LUNCH*"

12:00 -1:30 PM I

5.,Discussion of proposed testing atthe UniversitylNextEra 11
30 - 2:30 PM i

!ofTexas i6. Technical DIs.UHlon (a) results and summary of [NRC and NextEra r30-3:30 PM the tests performed to date, (b) summary of the monitoring and trending activities, and (c) operability evaluations update.

7*ISummary

[NRC 13:30 - 3:45 PM

8. jPublic Comments I

13:45 - 4:30 PM

-"",..-...-~

Adjourn 14:30 PM Enclosure

ML120870217 OFFICE DORLlLP1-2/PM DORLlLP1-2/LA DORLlLP1-2/BC DORLlLP1-2/PM NAME JLamb ABaxter MKhanna JLamb DATE 03/22/12 03/21/12 03/23/12 03/23/12