ML070720415

From kanterella
Jump to navigation Jump to search
Meeting Notice for Annual Assessment Meeting with FPL Energy Management to Discuss Nrc'S Assessment of the Safety Performance of the Seabrook Station for Calendar Year 2006
ML070720415
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/13/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
MN 07-009
Download: ML070720415 (5)


Text

MN No.07-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 13, 2007 Licensee: FPL Energy Seabrook, LLC Facility: Seabrook Station Docket No: 50-443 Date/Time: March 29, 2007, at 6:30 p.m.

Location: Inn of Hampton Galley Hatch Conference Center 815 Lafayette Rd Hampton, NH 03842 Toll Free: (800) 423-4561

Purpose:

The NRC requested an Annual Assessment Meeting with FPL Energy management to discuss NRCs assessment of the safety performance of the Seabrook Station for calendar year 2006. NRCs assessment is documented in a letter dated March 2, 2007.

Attendees:

NRC: M. Gamberoni, Deputy Director, Division of Reactor Safety, Region I P. Krohn, Chief, Projects Branch 6, Division of Reactor Projects, (DRP)

G. Dentel, Senior Resident Inspector, Seabrook S. Shaffer, Resident Inspector, Seabrook B. Norris, Senior Project Engineer, DRP E. Huang, Reactor Inspector, DRP Licensee: G. St. Pierre, Site Vice President - Seabrook M. Kiley, Plant General Manager P. Freeman, Manager - Engineering Public Participation: This is a Category 1 Meeting. The public is invited to observe these meetings. After the business portions, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations.

NRCs assessment letter can be found in ADAMS with an accession number of ML070610364.

This meeting notice with the attached meeting agenda can be located in ADAMS with an accession number of ML070720415. ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Seabrook Station can be found on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Paul Krohn, Chief, Projects Branch 6 (610) 337-5120 E-mail: pgk1@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 27, 2007, via telephone to the NRC meeting contact.

Please feel free to contact me in advance if there are any particular topics of interest that you would like to discuss at the meeting.

Approved by: /RA/

Paul G. Krohn, Chief Projects Branch 6 Division of Reactor Projects

3 Distribution:

G. St. Pierre, Site Vice President, Seabrook Station J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. M. Peschel, Manager, Licensing M. Kiley, Plant General Manager, Seabrook Station J. Dent, Assistant Plant Manager R. S. Kundalkar, FPL Vice President, Nuclear Engineering D. G. Roy, Nuclear Training Manager, Seabrook Station Office of the Attorney General, Commonwealth of Massachusetts P. McLaughlin, Attorney General, State of New Hampshire P. Brann, Assistant Attorney General, State of Maine M. S. Ross, Attorney, Florida Power & Light Company R. Walker, Director, Dept. of Public Health, Commonwealth of Massachusetts B. Cheney, Director, Bureau of Emergency Management K. McBride, Director, MEMA, Acting Health Physicist, Office of Community & Public Health, State of New Hampshire Administrator, Bureau of Radiological Health, State of New Hampshire J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire Town of Exeter Board of Selectmen S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

Agenda NRCs Annual Assessment Meeting Seabrook Station March 29, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (3 minutes)

Review of Reactor Oversight Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (7 minutes)

Discussion of Seabrook Station Performance . . . . . . . . . . . . . . . . . . . . . . . . NRC (15 minutes)

FPL Energys Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FPL (25 minutes)

Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC (5 minutes)

Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . NRC/Members of the Public (as needed)

ML070720415 Document Name: C:\FileNet\ML070720415.wpd SUNSI Review Complete: PGK (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME B Norris/BSN P Krohn/BSN for DATE 03/13/07 03/13/07