U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING

June 1, 2023

Licensee: NextEra Energy Seabrook, LLC

Facility: Seabrook Station

Docket No: 50- 443

Date/ Time: June 27, 2023 5:30 p.m.

Location: Inn at Hampton/Best Western Hotels & Resorts 815 Lafayette Rd.

Hampton, NH 03842

Purpose:

The U.S. Nuclear Regulatory Commission (NRC) will host a public meeting to discuss NRCs assessment of safety performance at Seabrook Station for 2022, as described in the annual assessment letter dated March 1, 2023. The NRC will respond to questions from the public on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: R. McKinley, Deputy Director, Division of Operating Reactor Safety M. Gray, Chief, Engineering Branch 1 M. Young, Chief, Projects Branch 2 J. DeBoer, Senior Project Engineer, Projects Branch 2 T. Daun, Acting Senior Resident Inspector S. Flanigan, Acting Resident Inspector N. Floyd, Senior Reactor Inspector

Public Participation: This is an information meeting with a q uestion and answer session. The meeting will begin with a presentation by NRC staff on the NRCs assessment of performance at Seabrook Station in 2022, followed by and opportunity for members of the public to ask questions specific to the safety performance of Seabrook Station and the NRCs role in ensuring safe plant operations. Questions may also be submitted in advance to matt.young@nrc.gov.

Meeting

Contact:

Matt R. Young, Projects Branch 2 (610) 337-5205 Email: Matt.Young@nrc.gov

2

The NRCs annual assessment letter regarding Seabrook Station performance during 2022 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession Number ML23058A254. ADAMS is accessible from the NRCs website at:

www.nrc.gov/reading-rm/adams.html. Additional information on the NRCs annual assessment process and the safety performance of Seabrook can be found on the NRCs website at:

https://www.nrc.gov/reactors/operating/oversight.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website, https://www.govinfo.gov/content/pkg/FR-2021- 03-19/pdf/2021- 05787.pdf.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests will be made on a case-by-case basis. Persons requiring assistance to attend the meetingshall make their requests known to the NRC meeting contact no later than two business days prior to the June 27, 2023, meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website (www.nrc.gov) under public meetings.

Approved by:

Matt R. Young, Chief Projects Branch 2 Division of Operating Reactor Safety

cc: Distribution via ListServ

3

Region I Notice of Public Meeting for Seabrook Station dated June 1, 2023

DISTRIBUTION:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Director, Office of Nuclear Material Safety and Safeguards, NMSS (RIDSNMSSOD)

Asst General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD 1/2), NRR (RIDSNRRDORLLPL1)

MYoung, DORS MGray, DORS NFloyd, DORS JDeBoer, DORS JBresson, DORS TDaun, DORS, S RI SFlanigan, DORS, RI ACass, DORS, AA GThomas, ESEB, SCE BLehman, ESEB, SCE PZurawski, RI OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource DTifft, RI SLO DScrenci, RI PAO NSheehan, RI PAO

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -23 EOC Review/Branch 2/Seabrook/2023 Seabrook AAM Meeting Notice.docx ADAMS ACCESSION NUMBER: ML23152A125 SUNSI Review n -Sensitive Publvlle

Sensitive n -Publiclyvlable

OFFICE / RI/PAO /

ME JDoer Dnci MYoung TE 20/2023 22/2023 22/2023 OFFIAL RERD CO