Notice of Meeting with FPL Energy Seabrook to Discuss NRC Assessment Safety Performance of for Cy 2008
ML091070101
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/17/2009
From: Arthur Burritt
Reactor Projects Branch 3
To:
Florida Power & Light Energy Seabrook
Burritt A
Shared Package
ml090550337 List:
References
MN 09-018
Download: ML091070101 (6)


Text

U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 17, 2009 MN No.09-018 Licensee: FPL Energy Seabrook, LLC (FPLE)

Facilities: Seabrook Station, Unit No.1 (Seabrook)

Docket Nos: 50-443 Date/Time: April 30, 2009, from 1:00 p.m. to 3:00 p.m.

Location: Galley Hatch Conference Center located at Best Western - Inn at Hampton 815 Lafayette Road Hampton NH 03842 603-926-6771

Purpose:

The NRC requested an Annual Assessment Meeting with FPLE management to discuss the NRC assessment of FPLE safety performance at Seabrook for calendar year 2008. The NRC assessment of performance at these facilities is documented in a letter dated March 4, 2009. FPLE will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve performance.

NRC Attendees: A. Burritt, Chief, Projects Branch 3, Division of Reactor Projects W. Raymond, Senior Resident Inspector J. Johnson, Resident Inspector FPLE Attendees: G. St. Pierre, Site Vice President P. Freeman, Plant General Manager R. Noble, Engineering Manager Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.

Meeting

Contact:

Arthur Burritt, Chief, Projects Branch 3 610-337-5069 E-mail: arthur.burritt@nrc.gov

2 The NRC assessment letter for Seabrook can be found in ADAMS with accession number ML090620760. This meeting notice and the attached meeting agenda can be found in ADAMS with accession number ML091070101. The slides for the NRCs presentation at the meeting can be found in ADAMS with accession number ML091060498. ADAMS is accessible at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and safety performance at Seabrook can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement can be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 27, 2009, via telephone to the NRC meeting contact.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule.

/RA/

Approved by: ________________

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects cc w/encl:

M. Nazar, Senior Vice President and Chief Nuclear Officer J. Stall, President, FPL Group Nuclear A. Khanpour, Vice President, Engineering Support M. Warner, Vice President, Nuclear Plant Support M. Mashhadi, Senior Attorney, Florida Power & Light Company M. Ross, Managing Attorney, Florida Power & Light Company M. OKeefe, Manager, Licensing Manager P. Freeman, Plant General Manager K. Wright, Manager, Nuclear Training, Seabrook Station R. Poole, FEMA, Region I Office of the Attorney General, Commonwealth of Mass K. Ayotte, Attorney General, State of NH O. Fitch, Deputy Attorney General, State of NH P. Brann, Assistant Attorney General, State of Maine R. Walker, Director, Radiation Control Program, Dept. of Public Health, Commonwealth of MA

3 C. Pope, Director, Homeland Security & Emergency Management, State of NH R. Hughes, Director, Licensing and Performance Improvement J. Giarrusso, MEMA, Commonwealth of Mass D. O'Dowd, Administrator, Radiological Health Section, DPHS, DHHS, State of NH J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, NH Town of Exeter, State of New Hampshire Board of Selectmen, Town of Amesbury S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League

4 Agenda NRCs Annual Assessment Meeting Seabrook April 30, 2009 Introductions and Opening Remarks NRC (3 minutes)

Review of Reactor Oversight Process NRC (10 minutes)

National Summary of Plant Performance NRC (5 minutes)

Discussion of FPLE Performance at Seabrook NRC (15 minutes)

FPLEs Response and Remarks FPLE (15 minutes)

Closing Remarks NRC (5 minutes)

Short Break (5 minutes)

NRC to address public questions NRC/Members of the Public (as needed)

5 The NRC assessment letter for Seabrook can be found in ADAMS with accession number ML090620760. This meeting notice and the attached meeting agenda can be found in ADAMS with accession number ML091070101. The slides for the NRCs presentation at the meeting can be found in ADAMS with accession number ML091060498. ADAMS is accessible at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and safety performance at Seabrook can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement can be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by April 27, 2009, via telephone to the NRC meeting contact.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule.

/RA/

Approved by: _____________________

Arthur L. Burritt, Chief Projects Branch 3 Division of Reactor Projects Distribution:

See next page SUNSI Review Complete: __lc*________ (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH3\COMMUNICATIONS\EXTERNAL\PUBLIC MEETINGS\2009 ANNUAL ASSESSMENT MEETINGS\SEABROOK\MEETING NOTICES\2009 SEABROOK MEETING NOTICE.DOC PACKAGE: ML090550337 LETTER: ML090620760 After declaring this document An Official Agency Record it will be released to the Public. SLIDES: ML091060498 NOTICE: ML091070101 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME LCline/lc* ABurritt/alb DATE 04/16/09 04 /17/ 09

  • See prior concurrence page OFFICIAL RECORD COPY

6 Distribution w/encl: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Support, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD 1/2), NRR (RIDSNRRDORlLPI 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA D. Egan, PM, NRR M. Dapas, DRA R. Shane, OCA D. Lew, DRP K. Farrar, ORA J. Clifford, DRP D. Screnci, PAO D. Roberts, DRS N. Sheehan, PAO P. Wilson, DRS D. Tifft, SLO A. Burritt, DRP N. McNamara, SLO L. Cline, DRP G. Matakas, ORA R. Moore, DRP DRS Division Secretary, RI A.. Turlin, DRP DRP Division Secretary, RI W. Raymond, DRP, SRI PMNS J. Johnson, DRP, RI ROPreports@nrc.gov E. Jacobs, OA Region I Docket Room (with concurrences)

S. Campbell, RI OEDO J. Lubinski, NRR H. Chernoff, NRR