Memo Summary of NextEra Energy Seabrook Drop in Visit and Slides, August 22, 2012
ML12236A385
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/23/2012
From: Arthur Burritt
Reactor Projects Branch 3
To: Darrell Roberts
Division Reactor Projects I
BURRITT, AL
References
Download: ML12236A385 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 August 23, 2012 MEMORANDUM TO: Darrell J. Roberts, Director Division of Reactor Projects FROM: Arthur L. Burritt, Chief /RA/

Projects Branch 3

SUBJECT:

Summary of NextEra Energy Drop-in Visit On August 21, 2012, Mr. Kevin Walsh, Seabrook Station Site Vice President, Mr. Jim Connolly, Engineering Site Director, and Mr. Michael OKeefe, Seabrook Station Licensing Manager, all representing NextEra Energy, met with the Regional Administrator and members of the Region I staff at the NRC offices in King of Prussia, PA. NextEra Energy requested the meeting to provide a general update on the status of Seabrook.

During the meeting, the following topics were discussed:

1. Nuclear Excellence Model
2. Station Updates
3. Senior and Corporate Staff Realignment
4. Station Organizational Changes
5. ASR Status
6. Emergency Preparedness
7. Refueling Outage (OR15) Scope The meeting began at 1:00 p.m. and ended at 3:00 p.m. No regulatory decisions were requested or made during the meeting and there were no commitments for any follow-up actions on the part of Region. The slides used by NextEra Energy to conduct the briefing are enclosed with this memorandum.