Preservice Inspection Program Plan and Additional Information
ML101680561
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/17/2010
From: Bajestani M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101680561 (151)


Text

Tennessee Valley Authority, Post Office Box 2000, Spring City, TN 37381-2000 June 17, 2010 10 CFR 50.55 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 NRC Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - PRESERVICE INSPECTION PROGRAM PLAN AND ADDITIONAL INFORMATION

Reference:

TVA letter dated April 20, 2010, Watts Bar Nuclear Plant (WBN)-

Unit 2 - Preservice Inspection Program Plan and Additional Information (Accession No. ML101200204)

By letter dated April 20, 2010, TVA committed to provide an update to the plan to identify the Code Edition and Addendum for preservice inspection and testing of snubbers and information specified in the ASME Code,Section XI, IWA-2420 "Inspection Plans and Schedules."

This letter transmits the information committed to in the referenced letter. Enclosure 1 contains the plan for preservice inspection and testing of the snubbers. Enclosure 2 contains the information specified in the ASME Code,Section XI, IWA-2420 Inspection Plans and Schedules. In addition, this enclosure includes the Inspection Services Organization (ISO) Program Manuals NDE Procedures, Table of Contents. This is provided for additional information.

Printed on recycled paper

U. S. Nuclear Regulatory Commission Page 2 June 17, 2010 If you have any questions, please contact me at (423) 365-2351.

Sincerely,

!'1. 73<~'~~;:~~~--

Masoud B j stani Watts Ba nit 2 Vice President

Enclosures:

1.

Preservice Inspection Plan, Program No. WBN-2 PSI Rev. 3 2.

TVA Watts Bar Nuclear - Unit 2, Exams Scheduled For Preservice Inspection ISO Program Manuals NDE Procedures, Table of Contents cc (Enclosures):

U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSURE 1 Preservice Inspection Program Plan Watts Bar Nuclear Plant Unit 2 Program No: WBN-2 PSI Rev. 3

Preservice Inspection Program Plan Watts Bar Nuclear Plant Unit 2 Tennessee Valley Authority 1101 Market Street Chattanooga, TN 37402-2801 Watts Bar Nuclear Plant P.O. Box 2000 Spring City, TN 37381 Docket Number 391 Construction Permit No. CPPR-92, Issued January 23, 1973 Extension Issued October 24, 2000 Program No: WBN-2 PSI Rev. 3 Effective Date: _~0~6~/1~0:!..=/2~0~10~

Responsible Organization:

Inspection Services Organization Prepared by:

John T. Lewis Reviewed by:-:!!!J:

Approved by:

~

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 2 of 77 Revision Log Revision Number Effective Date Pages Affected Description of Revision 0

7-25-08 All Intial Issue 1

10-23-08 19, 20, 21 53-56 Incorporate 10CFR50.55a requirements for Components Containing Alloy 600/82/182.

Editorial corrections as marked.

2 12-01-09 7

Insert MOU statement 11 Changed the word Weld to Component Table Summary Added numbers to Total Population and Required Examination 62 Added TP-2 and TP-3 to table 66 Added TP-2 statement 67 Added TP-3 statement Section 11 Added Drawing number reference Section 12 Added Terms Various Editorial correction 3

6-1-10 3

Update Index 7

Remove 3.4.1.1.2. Mechanical Clamping devices 8

Section 3.4.1.4, define snubber exam and testing Code of Record. Add section 3.4.1.7 to address shop/field exams.

11 Added section 3.8.5 to address IEP-100 and ISOPM-S02-TOC 13, 14 Remove 10CFR50.55a(b)(2)(xi) requirement to use 1989 Edition IWB-1220 exemptions. Also, revise 3.15.6 to reflect IWB-1220 exemptions from 2001A03 Code.

17 Update 3.18.3 to define snubber exam and testing Code of Record.

17-18 Minor editorial changes 20 Added reference to 10CFR40.55a(g)(6)(ii)(E) to 3.19.3 21-24 Added Calibration Block section and table 32 Added totals for Exam Cat B-G-2 33 Revised totals for Exam Cat B-J 45 Added AFWS system to Table for Exam Cat C-F-2 56-58 Revised Augmented commitment Section 8.0 to reflect TVA responses to NRC.

71-73 Updated drawing lists

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 3 of 77 TABLE OF CONTENTS 1.0 Summary............................................................................................................................ 4 2.0 Code Applicability............................................................................................................. 5 3.0 Description......................................................................................................................... 6 3.1 Scope...................................................................................................................... 6 3.2 Jurisdiction............................................................................................................. 6 3.3 Responsibility........................................................................................................ 7 3.4 Application............................................................................................................. 7 3.5 Classification and Boundaries................................................................................ 8 3.6 Accessibility........................................................................................................... 9 3.7 Referenced Standards and Specifications............................................................ 10 3.8 Examination Methods.......................................................................................... 10 3.9 Nondestructive Examination Personnel............................................................... 11 3.10 Inspection Intervals.............................................................................................. 11 3.11 Component Reference System............................................................................. 12 3.12 Program Plan and Schedule................................................................................. 12 3.13 Evaluation of Recorded Conditions..................................................................... 12 3.14 Records and Reports............................................................................................ 13 3.15 IWB Requirements and Exemptions.................................................................... 13 3.16 IWC Requirements and Exemptions.................................................................... 14 3.17 IWD Requirements and Exemptions.................................................................... 16 3.18 IWF Requirements and Exemptions.................................................................... 17 3.19 Code Cases........................................................................................................... 19 3.20 Code Relief.......................................................................................................... 20 3.21 Augmented Components...................................................................................... 21 3.22 Calibration Standard..............................................................................................21 4.0 IWB Summary Tables...................................................................................................... 25 5.0 IWC Summary Tables...................................................................................................... 38 6.0 IWD Summary Tables...................................................................................................... 48 7.0 IWF Summary Tables...................................................................................................... 50 8.0 Augmented Summary Tables........................................................................................... 56 9.0 Requests for Relief........................................................................................................... 59 10.0 ASME Section XI - Technical Positions......................................................................... 64 11.0 Drawing - Reference List................................................................................................ 71 12.0 Program - Terms.............................................................................................................. 75

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 4 of 77 1.0

SUMMARY

As the owner Tennessee Valley Authority (TVA) had established the original Preservice Inspection (PSI) program at Watts Bar Nuclear Plant (WBN) Unit 2 to perform and document the inspection activities in accordance with Technical Instruction (TI) 50B, ASME Section XI Preservice Inspection Program. The latest working revision of TI-50B, Revision 11 dated September 29, 1989 was placed on Administrative Hold and on September 04, 1997 Revision 12 was issued to Cancel the document with that being the status of the original PSI program.

This document will be reference to establish the present document as needed.

In a letter dated January 29, 2008, Tennessee Valley Authority (TVA) to U.S. Nuclear Regulatory Commission (NRC) and In the Matter of Docket Number 50-391 Tennessee Valley Authority, WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - REGULATORY FRAMEWORK FOR THE COMPLETION OF CONSTRUCTION AND LICENSING ACTIVITIES FOR UNIT 2, it states in Enclosure 1, TVA Responses to NRCs Request of Information Needed for Licensing Review Reconstitution, item 4.b.iv, is a commitment to provide a revised Preservice Inspection Program.

The Final Safety Analysis Report (FSAR) for WBN-2 is a red-lined version to depict/demonstrate how the FSAR will appear at fuel load, as reference in TVA to NRC letter dated February 8, 2008. Based on FSAR Sections 5.2.8, 5.4.4.4 and 6.6, components subject to examination and/or test are components containing water, steam or radioactive waste shall be examined and tested in accordance with ASME Section XI as required by 10CFR50.55a(g),

except where specific written relief has been requested. FSAR Section 5.2.8 is for TVA Class A (ASME Code Class 1) and Section 6.6 for TVA Class B (ASME Code Class 2) and C and D (ASME Code Class 3) components.

This document is being prepared to re-establish the requirements for the Preservice Inspection (PSI) Program Plan at WBN-2, as stated in the previous paragraph. This program plan follows the inspection requirements of 10CFR50.55a(g)(2) which requires that components, including component supports, that are classified as ASME Code Class 1 and 2 must be designed and be provided with access to enable the performance of inservice examination of such components and supports and must meet the preservice examination requirements set forth in Editions and Addenda of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code or optional Code Cases listed in NRC Regulatory Guide 1.147 that are incorporated by reference in 10CFR50.55a(b), in effect six month before the date of issuance of the construction permit.

The examination categories and requirements for Class 1 components will be in accordance with subsection IWB of ASME Section XI. The examination categories and requirements for Class 2 and 3 components will be in accordance with subsections IWC and IWD of ASME Section XI to the extent practicable. (Watts Bar design was established prior to the publication of subsection IWC and IWD of Section XI; however, accessible Class 2 and 3 components will be examined in accordance with the guidelines of IWC and IWD of Section XI, as stated in FSAR Sections 6.2.2 and 6.2.5.

During the completion of construction and before startup of WBN-2, the quantity of the individual items listed in the summary tables as total population and required examination of

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 5 of 77 IWB, IWC, IWD and IWF will be established as an ongoing process. For components listed in the summary tables where the total population and the required examination number is not known the number may be noted as TBD (To Be Determined) or to establish an amount the WBN Unit 1 total may be used and noted with an asterisk (*) until the actual population of Unit 2 is determined. The total population and required examinations shall be established and documented in the preservice summary report, which is required to be prepared and submitted prior to commercial service.

Other inspection requirements and/or commitments made by WBN Unit 2 in the regulatory framework letter maybe incorporated or reference in this document as augmented inspection activities. Augmented inspection requirements or commitments, on ASME class components, may be included or referenced in this program plan for mutual effort toward achieving the intent of the inspection activities.

2.0 CODE APPLICABILITY 2.1 The rules of ASME Section XI are a mandatory program of examinations, testing and inspections for evidence of adequate safety to manage deterioration and aging effects.

2.2 TVA as the owner has the responsibilities to develop a PSI Program Plan to establish a baseline of examinations to demonstrate conformance of the requirements to ASME Section XI for Inservice Inspection activities throughout the life of the plant. These responsibilities include, but are not limited to provision of access in the design and arrangement of the plant to conduct the examination and test, development of plans and schedules, including detailed examination and testing procedures for filing with the enforcement and regulatory authorities having jurisdiction at the site, conduct of the program for examination and tests, and recording of the results of the examination and tests, evaluation of the examination and test results, including corrective actions required and the actions taken.

2.3 As stated above, the edition of ASME Section XI is established based on the referenced code edition and addenda of 10CFR 50.55a, that is in effect six month before the date of issuance of the construction permit. 10CFR50.55a Codes and Standards, dated February 27, 2008, specifically 10CFR50.55a (b)(2) which referencesSection XI through 2003 Addenda. Therefore, the 2001 Edition through the 2003 Addenda of Section XI, Division 1, Inservice Inspection of Nuclear Power Plant Components is incorporated by reference and will be used to develop this program plan and provide the requirements for examination, testing and inspection of completed components and systems, subject to the listed limitations and modifications referenced throughout this document.

2.4 Subsequent editions and addenda of ASME Section XI which are incorporated by reference in 10CFR50.55a may be used, subject to documentation as describe in Regulatory Issue Summary 2004-12 and the applicable related requirements, limitations and modifications.

2.5 The Authorized Nuclear Inservice Inspector(s) (ANII) are assigned to review, verify and certify that the responsibilities and the mandatory requirements of ASME Section XI as written in this document are met.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 6 of 77 2.5.1 The Inspector shall review the initial program plan, prior to the start of preservice inspections as well as revisions to the program plan. Also, the Inspector shall submit a report to the program owner documenting the review of the initial program plan and each revision thereafter. The review shall cover the features that are affected by the requirements of Section XI and this document, as applicable.

Shop and field preservice examinations are exempt from prior review.

2.5.2 The Inspector shall verify that the required examinations of this document, have been performed and the results recorded. Also, the Inspector shall verify that the nondestructive examination methods used follow the techniques specified and that the examinations are performed in accordance with written qualified procedures and by personnel qualified in accordance with the requirements of ASME Section XI. In addition, the Inspector has the prerogative to require re-qualification of any examiner or procedure when they have reason to believe the requirements are not met.

2.5.3 The Inspector shall perform any additional investigations necessary to verify that all applicable requirements of this program plan have been met.

2.5.4 The Inspector shall certify the examination records after verifying that the requirements of this program plan have been met and that the records are correct.

2.5.5 WBN-2 shall arrange for the Inspector to have access to all parts of the plant as necessary to make the required inspections and that the Inspector shall be notified and kept informed in advance when the components will be ready for inspection.

2.6 Application of this Code and Code of Record begins when the requirements of the Construction Code have been satisfied.

3.0 DESCRIPTION

3.1 SCOPE This PSI Program Plan identifies the areas subject to inspection, responsibilities, provisions for accessibility and inspectability, examination methods and procedures, frequency of inspections, record keeping and report requirements, evaluation of inspection results and subsequent disposition for results of evaluations.

3.2 JURISDICTION The jurisdiction of this PSI Program Plan covers the systems that have met all the requirements of the Construction Code, commencing when the construction code requirements have been met, irrespective of physical location. When portions of systems are completed at different times jurisdiction of this division shall cover only those portions for which all of the construction requirements have been met. Prior to installation, an item that has met all requirements of the construction code may be corrected using the rules of either the construction code or this division, as determined by WBN-2.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 7 of 77 3.3 RESPONSIBILITY The responsibilities of maintaining this PSI Program Plan are included in NGDC PP-15.

3.4 APPLICATION Components identified in this program plan for examination include items such as the reactor vessel, reactor pressure vessel internals (including the core support structure),

steam generators, pressurizer, piping systems (including their valves, pumps and heat exchangers) and all respective supports to the components.

3.4.1 The following items are part of the Section XI Preservice Inspection requirements, but are not included in this document:

3.4.1.1 The Repair/Replacement (R/R) Program Plan, when implemented, will be utilized to perform the required activities for ASME Section XI components. The Repair/Replacement Program Plan is in accordance with Watts Bar Procedures and R/R work activities packages, with the following limitations and modifications as outlined in 10CFR50.55a.

1. 10CFR50.55a(b)(2)(xii), Underwater Welding, will be addressed in the Repair/Replacement Programs, if needed.
2. 10CFR50.55a(b)(2)(xvii), Reconciliation of Quality Requirements is addressed in the Repair/Replacement Program, if needed.
3. 10CFR50.55a(b)(2)(xxiii), Evaluation of Thermally Cut Surfaces in IWA-4461.4.2 will be addressed in the Repair/Replacement Program, if needed.
4. 10CFR50.55a(b)(2)(xxv), Mitigation of Defects by Modification will be addressed in the Repair/Replacement Program, if needed.
5. 10CFR50.55a(b)(2)(xxvi), Pressure Testing Class 1, 2,and 3 Mechanical Joints of IWA-4540(c) of the 1998 Edition must be applied and will be addressed in the Repair/Replacement Program as described, if needed.

It should also be noted that a Memorandum of Understanding (MOU) has been established to address the interfacing systems between Unit 1 and 2. Portions of the Unit 2 systems were documented on Unit 1 ASME N-5 code data reports as being within the Unit 1 ASME boundary but are not within the operational boundary for Unit 1. Therefore this area has been address and for work activities prior to startup will have to be performed to ASME Section XI R/R. The letter and a more detailed description of the process and how it should work can be found in this document as Technique Position-3 (TP-3).

3.4.1.2 The requirements of Examination Category B-P, C-H and D-B, All Pressure Retaining Components for System Leakage Tests, are not required prior to initial plant startup. A System Pressure Test Program Plan and Schedule will be developed as required to perform the examination for systems and components as outlined in ASME Section

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 8 of 77 XI, Articles IWA-5000, IWB-5000, IWC-5000 and IWD-5000 for all Class 1, 2, and 3 components, with the limitations and modifications as outlined in 10CFR50.55a for the inservice interval requirements.

3.4.1.3 The IWB requirements of Steam Generator Tubing of Examination Category B-Q, regarding the extent and frequency of the examination, is governed by Technical Specification and documented in the Steam Generator Tubing Program Plan and Schedule as addressed in 10CFR50.55a(b)(2)(iii).

3.4.1.4 The IWF-5000 requirements for preservice examination and testing of snubbers will be performed using Subsection ISTD of the ASME/ANSI OM Code 2001 Edition through 2003 OMb Addenda, as permitted by 10CFR50.55a(b)(3)(v). Examinations shall be performed using the VT-3 visual examination method described in IWA-2213.

3.4.1.5 The IWE requirements for Class MC and Metallic Liners of Class CC components are documented in the IWE Program Plan and Schedule. The requirements will be utilized to perform the required examination as addressed by Subsection IWE, with limitations and modifications outlined in 10CFR50.55a(b)(2)(ix) and subparagraphs (A), (B), and (F) through (I).

3.4.1.6 The IWL requirements for Class CC Concrete Components is defined at WBN-2 as a concrete structural slab that is covered by a liner and a concrete floor making it inaccessible for examination and therefore exempt from examination in accordance with IWL-1220. The remaining Shield Building wall is a reinforced concrete structure similar in shape to the steel containment vessel but is not referred to as a concrete containment under pressure. However, the concrete structural slab (containment floor) is subject to the repair/replacement requirements of Article IWL of ASME Section XI.

3.4.1.7 Shop and field examinations may be credited for preservice examination of Class 1 or 2 components in Subsections IWB or IWC, provided the requirements of IWB-2200(b) or IWC-2200(b), respectively, are met.

3.5 CLASSIFICATION AND BOUNDARIES 3.5.1 A list of flow diagrams pertaining to the systems boundaries indicating the TVA Class A, B, C and D or ASME Class 1, 2 and 3 systems, structures and components required to be examined is included in Section 11.

3.5.2 A list of weld and support location drawings based on the flow diagram boundaries and utilized for component identification and location within those boundaries is also included in Section 11.

3.5.3 The rules of IWB shall be applied to those components that are classified ASME Class 1 or TVA Class A.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 9 of 77 3.5.4 The rules of IWC shall be applied to those components that are classified ASME Class 2 or TVA Class B.

3.5.5 The rules of IWD shall be applied to those components that are classified ASME Class 3 or TVA Class C or D.

3.5.6 The requirements of IWF shall be applied to component supports classified ASME Class 1, 2 and 3 or TVA Class A, B, C and D as describe above.

3.5.7 Optional construction of a component within a system boundary to a classification higher than the minimum class established in the component Design Specification shall not affect the overall system classification by which the applicable rules are determined.

3.5.8 Where all components within the system boundary or isolable portions of the system boundary are classified to a higher class than required by the group classification criteria, the rules of the higher classification may be applied, provided the rules of the higher classification apply in their entirety.

3.5.9 The portion of piping that penetrates a containment vessel, which is required by Section III to be designed to Class 1 or Class 2 rules for piping and which may differ from the classification of the balance of the piping system, need not affect the overall system classification.

3.5.10 If a system safety criteria permits a system to be nonnuclear safety class and Watts Bar optionally classifies and constructs that system, or portion thereof, to Class 2 or Class 3 requirements, the application of the rules is at the option of Watts Bar.

3.6 ACCESSIBILITY Provisions for accessibility shall include the following considerations:

3.6.1 Design considerations other than access provisions may be needed for specific components to render preservice/inservice inspections practical, such as surface finish of components subject to crud or corrosion product buildup, material selection to minimize activation in service and shielding from irradiation effects.

3.6.2 Access for the Inspector, examination personnel, and equipment necessary to conduct the examinations shall be provided.

3.6.3 Sufficient space for removal and storage of structural members, shielding and insulation shall be provided.

3.6.4 Installation and support of handling machinery where required to facilitate removal, disassembly and storage of equipment, components and other materials shall be provided.

3.6.5 Performance of examinations alternative to those specified in the event structural defects or indications are revealed that may require such alternative examinations, when necessary.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 10 of 77 3.6.6 Necessary operations associated with repair/replacement activities shall be performed.

3.7 REFERENCED STANDARDS AND SPECIFICATIONS When standards and specifications are referenced, their revision date or indicator shall be as listed in ASME Section XI, 2001 Edition through 2003 Addenda, specifically Table IWA-1600-1.

3.8 EXAMINATION METHODS ASME Section XI identifies three types of examinations to perform inspections as visual, surface and volumetric. The actual examination method is defined and the techniques used are described in the legend below:

Visual (VT), an examination method used to evaluate an item by observation.

VT - 1 Detection of Surface Conditions VT - 2 Evidence of Leakage VT - 3 General Mechanical and Structural Conditions Surface (Sur), an examination method used to detect the presence of discontinuities on the surface of the material.

PT -

Liquid Penetrant MT -

Magnetic Particle ET -

Eddy Current Note: 10CFR50.55a(b)(2)(xxii), prohibits the use of an ultrasonic examination method for surface examination as allowed by IWA-2220.

Volumetric (Vol), an examination method used to detect the presence of discontinuities throughout the volume of material.

UT -

Ultrasonic RT -

Radiography 3.8.1 The examination method or methods to be used on a component are specified in the summary tables in Section 4.0, 5.0, 6.0 and 7.0 for ASME Class 1, 2 and 3 components and/or parts.

3.8.2 When preparation of a surface for nondestructive examination is required, the preparation shall be by a mechanical method. Such surfaces shall be blended into the surrounding area as may be required to perform the examination. The wall thickness shall not be reduced below the minimum thickness required by design.

3.8.3 All the above nondestructive examinations will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified. The provision for substitution of these alternative examination

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 11 of 77 methods, combination of methods, or newly developed techniques as outlined in IWA-2240 will utilize the 1997 Addenda of Section XI as stated in 10CFR50.55a(b)(2)(xix).

3.8.4 The extent of exam and examination requirements for volume or area coverage, as required in the summary tables of this document for each component, shall be documented on the applicable examination record and shall identify both the cause and percentage of reduced examination coverage. Reference to Code Case N-460 when the entire examination volume or area cannot be examined due to interference by another component or part geometry.

3.8.5 Nondestructive examination (NDE) procedures are controlled in accordance with IEP-100, Administration of Nondestructive Examination (NDE)

Procedures. A listing of NDE procedures is provided in ISOPM-S02-TOC, ISO Program Manuals NDE Procedures Table of Contents. These procedures are controlled and available electronically in the Business Support Library (BSL).

3.9 NONDESTRUCTIVE EXAMINATION PERSONNEL Personnel performing nondestructive examinations to this program plan shall be qualified and certified using a written practice prepared in accordance with ASME Section XI, as modified by 10CFR50.55a(b)(2)(xiv), (xv), (xvi), (xviii) and (xxiv). The written practice shall control the personnel requirement for nondestructive examination for this document and is outlined with the additional provisions of 10CFR50.55a regarding personnel qualification and certification as noted below.

3.9.1 10CFR50.55a(b)(2)(xiv), Appendix VIII personnel qualification.

3.9.2 10CFR50.55a(b)(2)(xv), Appendix VIII specimen set and qualification requirements.

3.9.3 10CFR50.55a(b)(2)(xvi), Appendix VIII single side ferritic vessel and piping and stainless steel piping examination.

3.9.4 10CFR50.55a(b)(2)(xviii), Certification of NDE personnel.

3.9.5 10CFR50.55a(b)(2)(xxiv), Incorporation of the Performance Demonstration Initiative and Addition of Ultrasonic Examination Criteria.

3.10 INSPECTION INTERVAL The Preservice Inspection Program is prepared in accordance with Program B of ASME Section XI to establish the baseline inspections for future inspection intervals.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 12 of 77 3.11 COMPONENT REFERENCE SYSTEM A component reference system, such as TVA Procedure N-GP-8 Weld Reference System, shall be established during the preservice examinations and will continue to be used during the Inservice Inspection process. This applies to all components inspected in the Class 1, 2 and 3 systems, including piping, vessel and other components, where practical. The drawings used for PSI are based on the classification of the boundaries outlined on the WBN Unit 2 Flow Diagrams to establish the basis for the interrelationship with TVA classification of components and ASME Section XI inspection activities as described in Technical Position TP-1, listed in this document. The identification of the components required to be inspected by PSI shall be the same as or similar to the identification recorded for the code data report and/or shop construction records. For the purpose of traceability of field and shop weld components on the PSI/ISI weld and support location drawing, the referenced isometric and the numbering of the welds on the isometric shall be used wherever possible.

3.12 PROGRAM PLAN AND SCHEDULES The program plan summary tables contained in Sections 4.0, 5.0, 6.0 and 7.0 are by examination category as outlined for ASME Section XI components.

3.12.1 For each examination category, the summary tables identify the item number, component or part, compliance to the Watts Bar Unit-2, examination method, examination figure, extent of exam, acceptance standard, total population and required examinations for each category item, total examination in the category and notes pertaining to the items. It should be noted that the total population and required examinations may change during the preservice examination period due to changes, modifications and actual walkdowns of the systems but will be document for the summary report for the initial inservice inspection activities.

3.12.2 The program schedule, which is directly related to the summary tables of the program plan, will list the specific identification number of components or parts (welds, bolts, studs or other items) with their, code category and item numbers, method of exam, area to be examined as a minimum and any other essential information.

3.12.3 During the PSI activities a list shall be maintained of the components examined and as a minimum the component or part number, the report number, acceptance and/or evaluation process, percentage of examination volume or area complete, with an explanation of 90% or less coverage, if applicable and reported to the program owner.

3.13 EVALUATION OF RECORDED CONDITIONS Evaluation shall be made of flaws detected during the examinations as required by ASME Section XI, Articles IWB-3000 for Class 1 components, IWC-3000 for Class 2 components, and IWD-3000 for Class 3 components and IWF-3000 for component supports. Flaws detected shall be sized by bounding rectangle or square the flaw for the purpose of description and dimensioning as described in Section XI, IWA-3300, Flaw

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 13 of 77 Characterization, or IWA-3400, Linear Flaws. All flaws shall be evaluated, after they have been characterized, by comparing the results with the acceptance standard specified in the summary tables.

3.14 RECORDS AND REPORTS Examination records and reports shall be filed and maintained in a manner that will allow access for future reference. The record keeping and reporting requirements in this program meets the requirements of IWA-6000 of Section XI. These activities are requirements in addition to being implemented by Watts Bar procedures for, Record Control.

3.15 IWB REQUIREMENTS AND EXEMPTIONS 3.15.1 Subsection IWB provides the rules and requirements for Class 1 pressure retaining components and their integral attachments.

3.15.2 Preservice examinations required to be performed and completed in the Class 1 systems are extended to include essentially 100% of the pressure retaining welds in all non-exempt components prior to initial plant startup, except examination category B-P, the VT-3 requirements for the internal surfaces of categories B-L-2 and B-M-2 and category B-O shall be extended to include only the welds in the outer peripheral of the control rod housings.

3.15.3 Component requirements shall be examined as specified listed in the Summary Tables in Section 4.0 of this document. 10CFR50.55a provides the following requirements in lieu of and in addition to the requirements contained within this document:

3.15.3.1 10CFR50.55a(b)(2)(xxi) requires inclusion of Items B3.120 and B3.140 examination requirements of the 1998 Edition be addressed.

3.15.4 Shop and field examinations may serve in lieu of on-site preservice examination provided the following:

3.15.4.1 In the case of the vessels only, the examination are performed after the hydrostatic test required by Section III.

3.15.4.2 Such examinations are conducted under conditions and with equipment and techniques equivalent to those that are expected to be employed for subsequent inservice examinations.

3.15.4.3 The shop and field examination records are or can be documented and identified in a form consistent with those required for records management.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 14 of 77 3.15.5 Evaluation of Examination Results shall be in accordance with the Acceptance Standard requirements listed in the Summary Tables of Section 4.0 for IWB Class 1 components.

3.15.6 The following components or parts of components are exempt from the volumetric and surface examination requirements as noted in IWB-1220 of the PSI Code of Record:

3.15.6.1 Piping of NPS 1 and smaller, except for steam generator tubing; 3.15.6.2 Components and their connections in piping of NPS 1 and smaller; 3.15.6.3 Reactor vessel head connections and associated piping, NPS 2 and smaller, made inaccessible by control rod drive penetrations; 3.15.6.4 Welds or portions of welds that are inaccessible due to being encased inside concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.

Note: Piping is defined as having a cumulative inlet and cumulative outlet pipe cross-sectional area neither of which exceeds the nominal outside diameter cross-sectional area of the designated size.

3.16 IWC REQUIREMENTS AND EXEMPTIONS 3.16.1 Subsection IWC provides the rules and requirements for Class 2 pressure retaining components and their integral attachments.

3.16.2 The preservice inspection requirements shall apply to those Class 2 components initially selected for examination (except category C-H) and not exempt or excluded from inservice examination, shall be performed and completed prior to initial plant startup.

3.16.3 Components shall be examined as specified in the Summary Tables for IWC listed in Section 5.0 of this document.

3.16.4 Shop and field examinations may serve in lieu of on-site preservice examination provided the following:

3.16.4.1 In the case of the vessels only, the examination are performed after the hydrostatic test required by Section III.

3.16.4.2 Such examinations are conducted under conditions and with equipment and techniques equivalent to those that are expected to be employed for subsequent inservice examinations.

3.16.4.3 The shop and field examination records are or can be documented and identified in a form consistent with those required for records management.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 15 of 77 3.16.5 The following Class 2 components or parts of components are exempt from the volumetric and surface examination requirements.

3.16.5.1 Class 2 components within RHR, ECC and CHR systems or portions of systems.

(a) For systems, except the High Pressure Safety Injection; (1) Class 2 piping NPS 4 and smaller; (2) Class 2 vessels, pumps and valves and their connections in piping NPS 4 and smaller; (b) Class 2 High Pressure Safety Injection portion; (1) Class 2 piping NPS 1 1/2 and smaller; (2) Class 2 vessels, pumps, and valves and their connections in piping NPS 1 1/2 and smaller (c) Class 2 vessels piping, pumps, valves, other components connections of any size in statically pressurized, passive (i.e. no pumps) portions (i.e., Safety Injection Tanks (SITs) and associated discharge piping);

(d) Class 2 piping and other components of any size beyond the last shutoff valve in opened ended portions of systems that do not contain water during normal plant operating conditions.

3.16.5.2 Class 2 components within systems or portions of systems other than RHR, ECC and CHR systems.

(a) For Class 2 systems, except for the Auxiliary Feedwater System.

(1) Class 2 piping NPS 4 and smaller; (2) Class 2 vessels, pumps and valves and their connections in piping NPS 4 and smaller; (b) Class 2 Auxiliary Feedwater Systems.

(1) Class 2 piping NPS 1 1/2 and smaller; (2) Class 2 vessels, pumps, and valves and their connections in piping NPS 1 1/2 and smaller

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 16 of 77 (c) Class 2 vessels piping, pumps, valves, other components connections of any size in systems that operate (when the system function is required) at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200o F (930C).

(d) Class 2 piping and other components of any size beyond the last shutoff valve in opened portions of systems that do not contain water during normal plant operating conditions.

3.16.5.3 Class 2 components that are inaccessible due to being encased in concrete, buried underground, located inside a penetration, or encapsulated by guard pipe.

3.16.6 Evaluation of examination results shall be in accordance with the acceptance standard requirements listed in the Summary tables of Section 5.0 for IWC Class 2 components.

Note: Piping is defined as having a cumulative inlet and cumulative outlet pipe cross-sectional area neither of which exceeds the nominal outside diameter cross-sectional area of the designated size.

3.17 IWD REQUIREMENTS AND EXEMPTIONS 3.17.1 Subsection IWD provides the rules and requirements for Class 3 pressure retaining components and their integral attachments.

3.17.2 The preservice inspection requirements, with the exception of category D-B, shall be performed and documented completely once prior to initial plant startup and shall apply to pressure retaining components and their integral attachments on Class 3 systems in support of the following functions:

(a) reactor shutdown (b) emergency core cooling (c) containment heat removal (d) atmosphere cleanup (e) reactor residual heat removal (f) residual heat removal from spent fuel storage pool 3.17.3 Components required to be examined are specified in the Summary Tables for IWD listed in Section 6.0 of this document.

3.17.4 The following Class 3 components or parts of components are exempted from the VT-1 visual examination requirements.

(a) piping NPS 4 and smaller (b) vessels, pumps, and valves and their connections in piping NPS 4 and smaller

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 17 of 77 (c) components that operate at a pressure of 275 psig or less and at a temperature of 200ºF or less in systems or portions of systems whose function is not required in support of reactor residual heat removal, containment heat removal and emergency core cooling (d) welds or portions of welds that are inaccessible due to being encased in concrete, buried underground, located inside a penetration or encapsulated by guard pipe.

3.17.5 Evaluation of examination results shall be in accordance with the acceptance standard requirements listed in the Summary tables of Section 6.0 for IWD Class 3 components.

Note: Piping is defined as having a cumulative inlet and cumulative outlet pipe cross-sectional area neither of which exceeds the nominal outside diameter cross-sectional area of the designated size.

3.18 IWF REQUIREMENTS AND EXEMPTIONS 3.18.1 The requirements for examination of Class 1, 2, 3 and MC component supports of nonexempt components are outlined within this section. The examination requirements shall apply to piping supports and supports for vessels, pumps and valves.

Note: There are no MC supports based on the design as being a free standing steel containment.

3.18.2 An initial preservice examination is to be performed on all component supports, not exempted by this document, once prior to startup. Component supports within systems that operate at a temperature greater than 200°F during normal operations shall be performed during or following initial system heatup and cooldown.

3.18.2.1 Component supports that have been adjusted in accordance with the acceptance standard for component support or corrected by repair/replacement shall be reexamined unless determine unnecessary by the evaluations.

3.18.3 The preservice visual examination and functional testing requirements of Snubbers will use Subsection ISTD of the ASME/ANSI OM 2001 Edition through OMb 2003 Code as allowed by 10CFR50.55a(b)(3)(v). Examination of snubbers shall be performed using the VT-3 visual examination method described in IWA-2213.

Integral and non-integral attachments for snubbers, including lugs, pins, bolting and clamps, shall be examined in accordance with the requirements of this document.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 18 of 77 Thermal movement verification of snubbers will be in accordance with procedure 2-PTI-999-02, Thermal Expansion.

3.18.4 Supports exempt from the examination requirements are those connected to piping and other items exempted from volumetric, surface, VT-1 or VT-3 visual examination. In addition, portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe are also exempt from the examination requirements.

3.18.5 The support examination boundaries for both integral and non-integral supports are as follows.

(a) The boundary of an integral support connected to a pressure retaining component is the distance from the pressure retaining component as indicated for Class 1, 2 and 3.

(b) The boundary of an integral support connected to a building structure is the surface of the building structure.

(c) The boundary of a non-integral support connected to a pressure retaining component is the contact surface between the component and the support.

(d) The boundary of a non-integral support connected to a building structure is the surface of the building structure.

(e) Where the mechanical connection of a non-integral support is buried within the component insulation, the support boundary may extend from the surface of the component insulation, provided the support either carries the weight of the component or serves as a structural restraint in compression.

(g) The examination boundary of an intervening element shall include the attachment portion, which includes welds, bolting, pins, clamps, etc. of the intervening element to pressure retaining components, integral and non-integral attachments of pressure retaining components, and integral and non-integral supports. The examination boundary does not include the attachment of the intervening element to the building structure.

(h) All integral and non-integral connections within the boundary governed by IWF rules and requirements are included.

3.18.6 Examination of component supports shall include:

(a) mechanical connections to pressure retaining components and building structure. For pipe-clamp-type supports, the mechanical connection to the pressure boundary includes the bolting, pins, and their interface to the clamp, but does not include the component-to-clamp interface.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 19 of 77 (b) weld connections to building structure (c) weld and mechanical connections at intermediate joints in multi-connected integral and nonintegral supports (d) clearances of guides and stops, alignment of supports, and assembly of support items (e) hot or cold settings of spring supports and constant load supports (f) accessible sliding surfaces 3.18.7 The methods of examination shall comply with those listed in Section 7.0 for IWF Summary Tables. Alternative methods of examination meeting the requirements of IWA-2240 may be used.

Examinations that detect conditions that require evaluation may be supplemented by other examination methods and techniques to determine the character of the flaw (that is, size, shape, and orientation). Visual examinations that detect surface flaws that exceed the acceptance criteria may be supplemented by either surface or volumetric examinations.

3.18.8 Evaluation of examination results shall be in accordance with the Acceptance Standard requirements listed in the Summary Table of Section 7.0 for IWF Class 1, 2 and 3 component supports.

3.18.9 All examinations listed in the Summary Table of Section 7.0 shall be performed completely, once, as a preservice examination. These preservice examinations shall be extended to include 100% of all supports not exempted by IWF-1230.

3.18.10 Examinations for systems that operate at a temperature greater than 200°F during normal plant operation shall be performed during or following initial system heatup and cooldown.

3.18.11 Prior to service, the applicable examinations listed in the Summary Table of Section 7.0 shall be performed on component supports that have been adjusted in accordance with IWF-3000 or corrected by various activities.

3.18.12 For systems that operate at a temperature greater than 200°F during normal plant operation, Watts Bar shall perform an additional preservice examination on the affected component supports during or following the subsequent system heatup and cooldown cycle unless determined unnecessary by evaluation.

3.19 CODE CASES 3.19.1 The following Code Case is accepted for use in Regulatory Guide 1.147 and shall be utilized where applicable:

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 20 of 77 N-460 Alternative Examination Coverage for Class 1 and 2 welds. To be used on all IWB-2500, Class 1 and IWC-2500, Class 2 welds.

3.19.2 The following Code Case is conditionally accepted for use in Regulatory Guide 1.147 and shall be utilized where applicable:

N-648-1 Alternative Requirements for Inner Radius Examinations of Class 1 Reactor Vessel Nozzles.

Conditional use states that, In place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.19.3 The following Code Cases are incorporated by reference in 10CFR50.55a(g)(6)(ii)(D) and (E) and shall be utilized where applicable.

N-722 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials.

N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads with Nozzles having Pressure Retaining Partial Penetration Welds.

This Code Case shall be use subject to the conditions specified in paragraphs 10CFR50.55a(g)(6)(ii)(D)(2) through (6) in the Code of Federal Regulations.

3.20 CODE RELIEF During the preservice inspections it may be determined that certain examination or inspection requirements are not practical to perform as outlined in Section XI. Code relief may be requested by following the circumstances as listed below for an alternative or for impractical examinations. An index of requests for relief its subject, status and comments are listed in section 9.0 as they are established.

3.20.1 10CFR50.55a(a)(3) states Proposed alternatives to the requirements of paragraphs (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that:

(i) The proposed alternatives would provide an acceptable level of quality and safety, or

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 21 of 77 (ii) Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

3.20.2 10CFR50.55a(g)(5) (iii) If the licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit information to support the determinations.

3.20.3 10CFR50.55a(g)(5)(iv) states Where an examination requirement by code or addenda is determined to be impractical by the licensee and is not included in the revised inservice inspection program plan as permitted by paragraph 10CFR50.55a(g)(4), the basis for the determination much be demonstrated to the satisfaction of the commission not later than 12 month after the expiration of each subsequent 120 month period of operation during which the examination is determined to be impractical.

3.21 AUGMENTED COMPONENTS This program includes an augmented examination section for items required to be examined as identified below. The types of commitments not required by ASME Section XI and are committed to be inspected or examined. The Summary Tables for the commitments by Watts Bar is located in Section 8.0.

3.21.1 Examination requirements other than ASME Section XI of IWB, IWC, IWD and IWF on Class 1, 2 or 3 components in accordance with Safety Analysis Report (SAR) or 10CFR50.55a.

3.21.2 USNRC Notices, Bulletins, or Generic Letters shall be followed as committed to by Watts Bar.

3.21.3 INPO or other industry operating experiences shall be followed as committed to by Watts Bar.

3.21.4 Westinghouse bulletins or notices shall be followed as committed to by Watts Bar.

3.22 CALIBRATION STANDARDS Calibration blocks used for ultrasonic examination shall be controlled in accordance with IEP-203, Control of Calibration Standards. Refer to the Table below for a listing of WBN calibration blocks. Calibration blocks from other TVA sites and/or vendors may be used for WBN Unit 2 preservice following review and assignment by a TVA Level III.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 22 of 77 Calibration Block ID Size (Dia.)

Schedule or Thickness Material WB-01 6.00 Sch 160 (0.715)

SA-376 TP304 WB-02 8.00 Sch 140 (0.942)

SA-376 TP304 WB-03 12.00 Sch 140 (1.158)

SA-376 TP316 WB-04 16.00 Sch 80 (0.754)

SA-333 Gr6 WB-05 32.00 1.410 SA-516 Gr70 WB-06 2.00 Sch 160 (0.346)

TP304 WB-07 8.00 Sch 120 (0.758)

TP304 WB-08 12.00 Sch 80 (0.767)

SA-376 TP316 WB-09 8.00 Sch 40 (0.307)

A-312 TP316 WB-10 14.00 Sch 160 (1.352)

A-312 TP304 WB-11 3.00 Sch 160 (0.450)

TP304-H WB-12 2.50 Sch 160 (0.396)

SA-376 TP304 WB-13 4.00 Sch 120 (0.450)

A-312 TP304 WB-14 FLAT (12.00 x 4.00) 1.482 SA-516 Gr70 WB-15 FLAT (12.00 x 4.00) 1.028 SA-376 TP304 WB-16 12.00 Sch 160 (1.322)

SA-376 TP304 WB-17 5.00 Sch 160 (0.585)

SA-403 WP316 WB-18 18.00 Sch 80 (0.938)

SA-333 WB-19 6.00 Sch XXH (0.782)

A106 GrB WB-20 1.50 Sch 160 (0.312)

SA-376 TP304 WB-21 10.00 1.493 SA-106 Gr B WB-22 NOT USED WB-23 1.375 DIA x 17.00 LTH STUD N/A SA-193 GrB7 WB-24 1.250 DIA x 5.00 LTH STUD N/A SA-193 GrB7 WB-25 1.675 DIA x 10.50 LTH STUD N/A SA-193 GrB7 WB-26 4.50 DIA x 30.50 LTH STUD N/A SA-193 GrB7 WB-27 2.00 DIA x 8.00 LTH STUD N/A SA-193 GrB7 WB-28 NOT USED WB-29 8.00 1.206 SA-376 TP304 WB-30 5.00 0.918 SA-376 TP304 WB-31 1.125 DIA x 7.50 LTH STUD N/A AISI 4140 WB-32 1.250 DIA x 10.00 LTH STUD N/A AISI 4140 WB-33 10.00 Sch 140 (1.006)

TP304 WB-34 14.00 Sch 140 (1.247)

TP304 WB-35 NOT USED

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 23 of 77 Calibration Block ID Size (Dia.)

Schedule or Thickness Material WB-36 1.50 DIA x 10.75 LTH STUD N/A AISI 4140 WB-37 6.00 Sch 80 (0.433)

SA-53 GrB WB-38 8.00 Sch 80 (0.484)

SA-106 GrB WB-39 24.00 LTH x 6.00 WTH) 4.016 SA-533 GrA WB-40 4.00 Sch 160 (0.516)

A-312 TP304 WB-41 12.00 Sch 40 (0.363)

A-312 TP304 WB-42 18.00 Sch 30 (0.431)

SA-403 TP304 WB-43 18.00 Sch 40 (0.641)

SA-240 TP304 WB-44 FLAT 8.00 LTH x 5.00 WTH 2.150 SA-240 TP304 WB-45 2.00 DIA x 9.00 LTH STUD N/A SA193 GrB7 WB-46 14.00 Sch 40 (0.470)

SA-358 TP304 WB-47 Vessel 22.375 LTH x 6.01 WTH (OLD ID WAT-01) 5.805 A-508 Cl2 WB-48 Vessel 33.875 LTH x 6.01 WTH (OLD ID WAT-02) 8.625 A-508 Cl2 WB-49 Vessel 43.31 LTH x 8.08 WTH (OLD ID WAT-03) 11.187 A-508 Cl2 WB-50 Vessel 32.75 LTH x 11.18 WTH 10.25 A-508 Cl2 WB-51 Vessel 27.53 LTH x 6.00 WTH (OLD ID WAT-05) 7.125 A-508 Cl2 WB-52 4.00 0.656 Tri-metallic (CRDM)

WB-53 10.00 3.000 A-508 Cl2 WB-54 12.00 Sch 160 (1.212)

SA-351 Gr CF8 WB-55 Pressurizer 15.00 LTH x 6.125 WTH 3.300 SA-533 GrA Cl2 WB-56 Pressurizer 20.00 LTH x 6.250 WTH 4.000 SA-533 GrA Cl2 WB-57 Stm Gen 25.125 LTH x 7.000 WTH 5.000 SA-216 GrWCC WB-58 Pressurizer 17.937 LTH x 6.750 WTH 3.062 SA-533 GrA Cl2 WB-59 31.00 (ID) 2.400 SA351 CF8A WB-60 31.00 (ID) 3.000 SA351 CF8A WB-61 2.00 Sch 80 (0.225)

SA-376 TP304 WB-62 3.00 Sch 40 (0.265)

SA-376 TP304 WB-63 3.00 Sch 80 (0.297)

SA-376 TP304 WB-64 4.00 Sch 40 (0.268)

SA-376 TP304 WB-65 4.00 Sch 80 (0.343)

SA-376 TP304

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Page 24 of 77 Calibration Block ID Size (Dia.)

Schedule or Thickness Material WB-66 14.00 Sch 30 (0.370)

A-358 TP304 WB-67 16.00 Sch 30 (0.395)

A-358 TP304 WB-68 20.00 Sch 20 (0.375)

A-358 TP304 WB-69 24.00 Sch 20 (0.375)

A-358 TP304 WB-70 6 DIA STUD N/A AISI 4340 WB-71 6.57 OD / 5.00 ID 0.787 SB-166 TP600 WB-72 6.57 OD / 5.00 ID 0.786 SA-479 TP304L / SA-182 WB-73 4.00 OD / 2.75 ID 0.625 SB-166 TP600 WB-74 4.00 OD / 2.75 ID 0.625 SA-182 TPA91 / SA-479 TPA91 WB-75 4.5 dia. RCP stud N/A A540 (E4340H)

WB-76 6.75 dia. RPV stud N/A SA-540 WB-77 INNER RADIUS CAL BLOCK -

FLAT N/A SA-240 TP304 WB-78 thru

-81 Alternate cal block N/A A-516 Gr70 WBN-82 thru -85 Alternate cal block N/A A-240 TP304 WB-86 4" Pipe Sch 80

.337 SA-335 GrP22 WB-87 2" Pipe Sch 160

.344 SA-335 GrP22 WB-95 & -

96 Alternate cal block N/A A-516 Gr70 WB-97 & -

98 Alternate cal block N/A TP304

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 2 IWB

SUMMARY

TABLES Page 25 of 77 SECTION 4.0 IWB

SUMMARY

TABLES For ASME CLASS 1 CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-1 Pressure Retaining Welds in Pump Casings B-L-2 Pump Casings - (NA reference 3.15.2)

B-M-1 Pressure Retaining Welds in Valve Bodies B-M-2 Valve Bodies - (NA reference 3.15.2)

B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings ASME Section XI items that do not apply to Watts Bar Unit 2 within this Program Plan will be identified with, NA to Unit-2, this documents the item does not apply and will not be referenced further within the program plan, schedule or summary reports.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 26 of 77 Examination Category B-A, Pressure Retaining Welds in Reactor Vessel Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination B1.10 Shell Welds B1.11 Circumferential Applicable Vol.

IWB-2500-1 All Welds (2)

IWB-3510 4

4 B1.12 Longitudinal NA to UNIT-2 B1.20 Head Welds B1.21 Circumferential Applicable Vol.

IWB-2500-3 Accessible length of weld IWB-3510 2

2 B1.22 Meridional Applicable Vol.

IWB-2500-3 Accessible length of all welds IWB-3510 6

6 B1.30 Shell to Flange Applicable Vol.

IWB-2500-4 Weld (2)

IWB-3510 1

1 B1.40 Head to Flange Applicable Vol. & Suf.

IWB-2500-5 Weld (2)

IWB-3510 1

1 B1.50 Repair Welds (1)

B1.51 Beltline region NA to UNIT-2 Totals Examination Category B-A 14 14 NOTES:

(1) NA to Unit-2 (2) Includes essentially 100% of the weld length.

(3) NA to Unit-2 Preservice activities (4) NA to Unit-2 Preservice activities (5) NA to Unit-2 Preservice activities

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 27 of 77 Examination Category B-B, Pressure Retaining Welds in Vessels Other Than Reactor Vessels Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Pressurizer B2.10 Shell to Head B2.11 Circumferential Applicable Vol.

IWB-2500-1 Both Welds (4)

IWB-3510 2

2 B2.12 Longitudinal Applicable Vol.

IWB-2500-2 1ft of all weld (2)

IWB-3510 2

2 B2.20 Head Welds B2.21 Circumferential NA to UNIT-2 B2.22 Meridional NA to UNIT-2 Steam Generators (Primary side)

B2.30 Head Welds B2.31 Circumferential NA to UNIT-2 B2.32 Meridional NA to UNIT-2 B2.40 Tubesheet to Head Weld Applicable Vol.

IWB-2500-6 Weld (4)

IWB-3510 4

4 Heat Exchanger (Primary side) - Head B2.50 Head Welds B2.51 Circumferential NA to UNIT-2 B2.52 Meridional NA to UNIT-2 Heat Exchanger (Primary side) - Shell B2.60 Tubesheet to Head Welds NA to UNIT-2 B2.70 Longitudinal Welds NA to UNIT-2 B2.80 Tubesheet to Shell Welds NA to UNIT-2 Totals Examination Category B-B 8

8 NOTES:

(1) NA to Unit-2 Preservice activities (2) The weld selected for examination is that weld intersecting the circumferential weld.

(3) NA to Unit-2 Preservice activities (4) Includes essentially 100% of the weld length

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 28 of 77 Examination Category B-D, Full Penetration Welded Nozzles in Vessels Inspection Program B Item No. (8)

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Reactor Vessel B3.90 Nozzle to Vessel Welds Applicable Vol.

IWB-2500-7 (a) through (c)

All Nozzles (1)

IWB-3512 8

8 B3.100 Nozzle Inside Radius Section Applicable EVT-1 (9)

(4)

All Nozzles (1)

IWB-3512 8

8 Pressurizer B3.110 Nozzle to Vessel Welds Applicable Vol.

IWB-2500-7 (a) through (c)

All Nozzles (1)

IWB-3512 6

6 B3.120 (6)

Nozzle Inside Radius Section Applicable Vol. (7)

(4)

All Nozzles (1)

IWB-3512 6

6 Steam Generators (Primary side)

B3.130 Nozzle to Vessel Welds NA to UNIT-2 B3.140 (6)

Nozzle Inside Radius Section Applicable Vol. (7)

(4)

All Nozzles (1)

IWB-3512 8

8 Heat Exchanger (Primary side) - Head B3.150 Nozzle to Vessel Welds NA to UNIT-2 B3.160 Nozzle Inside Radius Section NA to UNIT-2 Totals Examination Category B-D 36 36 NOTES:

(1) Includes nozzles with full penetration welds to vessel shell (or head) and integrally cast nozzles, but excludes manways and handholes either welded to or integrally cast in vessel.

(2) NA to Unit-2 Preservice activities (3) NA to Unit-2 Preservice activities (4) The examination volumes shall apply to the applicable Figure shown in Figs. IWB-2500-7(a) through (d).

(5) NA to Unit-2 Preservice activities (6) 10CRF50.55a(b)(2)(xxi)(A) Table IWB-2500-1 Items B3.120 and B3.140 (Inspection Program B) in the 1998 Edition must be applied when using the 2001 Edition, 2003 Addenda.

(7) A visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria in Table IWB-3512-1, may be performed in place of an ultrasonic examination, reference 10CFR50.55a(b)(2)(xxi)(A).

(8) Category Items B3.10 - B3.80 are based on Inspection Program A and do not apply to Unit-2.

(9) Code Case N-648-1, with conditional approval, see paragraph 3.19.2 for details of exam area and other information.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 29 of 77 Examination Category B-F, Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Reactor Vessel B5.10 NPS 4 or Larger-Nozzle-to-Safe End Butt Welds Applicable Vol. & Sur IWB-2500-8 All Welds IWB-3514 8

8 B5.20 Less Than NPS 4-Nozzle-to-Safe End Butt Welds NA to UNIT-2 B5.30 Nozzle-to-Safe End Socket Welds NA to UNIT-2 Pressurizer B5.40 NPS 4 or Larger-Nozzle-to-Safe End Butt Welds Applicable Vol. & Sur IWB-2500-8 All Welds IWB-3514 6

6 B5.50 Less Than NPS 4-Nozzle-to-Safe End Butt Welds NA to UNIT-2 B5.60 Nozzle-to-Safe End Socket Welds NA to UNIT-2 Steam Generators B5.70 NPS 4 or Larger-Nozzle-to-Safe End Butt Welds Applicable Vol. & Sur IWB-2500-8 All Welds IWB-3514 8

8 B5.80 Less Than NPS 4-Nozzle-to-Safe End Butt Welds NA to UNIT-2 B5.90 Nozzle-to-Safe End Socket Welds NA to UNIT-2 Heat Exchangers B5.100 NPS 4 or Larger-Nozzle-to-Safe End Butt Welds NA to UNIT-2 B5.110 Less Than NPS 4-Nozzle-to-Safe End Butt Welds NA to UNIT-2 B5.120 Nozzle-to-Safe End Socket Welds NA to UNIT-2 Totals Examination Category B-F 22 22 Note:

(1)

NA to Unit-2 Preservice activities (2)

NA to Unit-2 Preservice activities

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 30 of 77 Examination Category B-G-1, Pressure Retaining Bolting, Greater than 2 in. in Diameter Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Reactor Vessel B6.10 Closure Head Nuts Applicable VT-1 Surfaces All Nuts IWB-3517 54 54 B6.20 Closure Studs (1)(7)

Applicable Vol.

IWB-2500-12 All Studs IWB-3515 54 54 B6.40 Threads in Flange (2)(6)

Applicable Vol.

IWB-2500-12 Flange Surface IWB-3515 54 54 B6.50 Closure Washers, Bushings (2)

Applicable VT-1 Surfaces All Washers IWB-3517 54 54 Pressurizer B6.60 Bolts and Studs NA to UNIT-2 B6.70 Flange Surface, when connection disassembled NA to UNIT-2 B6.80 Nuts, Bushings, and Washers NA to UNIT-2 Steam Generators B6.90 Bolts and Studs NA to UNIT-2 B6.100 Flange Surface, when connection disassembled NA to UNIT-2 B6.110 Nuts, Bushings, and Washers NA to UNIT-2 Heat Exchangers B6.120 Bolts and Studs NA to UNIT-2 B6.130 Flange Surface, when connection disassembled NA to UNIT-2 B6.140 Nuts, Bushings, and Washers NA to UNIT-2 Notes; at end of this section.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 31 of 77 Examination Category B-G-1, Pressure Retaining Bolting, Greater than 2 in. in Diameter Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Piping B6.150 Bolts and Studs NA to UNIT-2 B6.160 Flange Surface, when connection disassembled NA to UNIT-2 B6.170 Nuts, Bushings, and Washers NA to UNIT-2 Pumps B6.180 Bolts and Studs (1) (7)

Applicable Vol.

IWB-2500-12 Studs IWB-3515 96 96 B6.190 Flange Surface, when connection disassembled (2) (4) (6)

Applicable VT-1 Surfaces Flange Surfaces IWB-3517 4

4 B6.200 Nuts, Bushings and Washers NA to Unit-2 Valves B6.210 Bolts and Studs NA to Unit-2 B6.220 Flange Surface, when connection disassembled NA to Unit-2 B6.230 Nuts, Bushings, and Washers NA to Unit-2 Totals Examination Category B-G-1 316 316 NOTES:

(1) Bolting may be examined: (a) in place under tension; (b) when the connection is disassembled; (c) when the bolting is removed.

(2) Threads in base material of flanges surface are required to be examined only when the connections are disassembled.

(3) NA to Unit-2 Preservice activities (4) Visual examination of bolted connections, VT-1 of the flange surface, nuts and washers, for pumps is required only when the component is examined under Examination Category B-L-2. This is for one pump in a group of pumps performing similar functions in a system and is required only when disassembly for maintenance, repair, or volumetric examination, as stated in B-L-2. (See note 2 in summary table for category B-L-2 )

(5) NA to Unit-2 Preservice activities (6) Examination includes 1 in. annular surface of flange surrounding each stud.

(7) When bolts or studs are removed for examination, surface examination meeting the acceptance standards of IWB-3515 may be substituted for volumetric examination.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 32 of 77 Examination Category B-G-2, Pressure Retaining Bolting, 2in. and Less in Diameter Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements or Fig. No.

Extent of Exam Acceptance Standard Total Population(5)

Required Examination Reactor Vessel B7.10 Bolt, Studs, and Nuts NA to Unit-2 Pressurizer B7.20 Bolt, Studs, and Nuts (1) (2)

Applicable VT-1 Surface All Studs, and Nuts IWB-3517 1

1 Steam Generators B7.30 Bolt, Studs, and Nuts (1) (2)

Applicable VT-1 Surface All Studs, and Nuts IWB-3517 8

8 Heat Exchangers B7.40 Bolt, Studs, and Nuts NA to Unit-2 Piping B7.50 Bolt, Studs, and Nuts (1)

Applicable VT-1 Surface All Bolt, Studs, and Nuts IWB-3517 13 13 Pumps B7.60 Bolt, Studs, and Nuts (1) (2)

Applicable VT-1 Surface All Studs, and Nuts IWB-3517 8

8 Valves B7.70 Bolt, Studs, and Nuts (1) (2)

Applicable VT-1 Surface All Studs, and Nuts IWB-3517 29 29 CRD Housing (only when disassembled)

B7.80 (4)

Bolt, Studs, and Nuts (1) (4)

NA to Unit-2 (PSI)

Totals Examination Category B-G-2 59 59 NOTES:

(1) Bolting is required to be examined only when a connection is disassembled or bolting is removed.

(2) For vessels, pumps, or valves, examination of bolting is required only when the component is examined under Examination Category B-B, B-L-2, or B-M-2. Examination of bolted connection is required only once during the interval. (See note 2 in summary table for category B-L-2 and B-M-2.)

(3) NA to Unit-2 Preservice activities (4) The provisions of Examination Category B-G-2, Item B7.80, that are in the 1995 Edition are applicable, reference 10CFR50.55a(b)(2)(xxi)(B), only to reused bolting.

(5) Total population represents bolted connections.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 33 of 77 Examination Category B-J, Pressure Retaining Welds in Piping Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination B9.10 NPS 4 or Larger B9.11 Circumferential Welds Applicable Vol. & Sur IWB-2500-8 Welds (1) (4)

(5) (6) (7)

IWB-3514 282 282 B9.20 Less Than NPS 4 B9.21 Circumferential Welds other than PWR High Pressure Safely Injection Systems Applicable Sur.

IWB-2500-8 Welds (1) (4) (5)

IWB-3514 59 59 B9.22 Circumferential Welds of PWR High Pressure Safely Injection System Applicable Vol.

IWB-2500-8 Welds (2) (4) (6) (7)

IWB-3514 42 42 B9.30 Branch Pipe Connection Welds B9.31 NPS 4 or Larger Applicable Vol. & Sur IWB-2500-9, 10 &

11 Welds (1) (4)

(5) (6) (7)

IWB-3514 11 11 B9.32 Less Than NPS 4 Applicable Sur.

IWB-2500-9, 10 &

11 Welds (1) (4) (5)

IWB-3514 29 29 B9.40 Socket Welds Applicable Sur.

IWB-2500-8 Welds (1) & (4)

IWB-3514 394 394 Totals Examination Category B-J 817 817 Notes:

(1) Examinations shall include the following:

(a) All terminal ends in each pipe or branch run connected to vessels.

(b) All terminal ends and joints in each pipe or branch run connected to other components where the stress levels exceed either of the following limits under loads associated with specific seismic events and operational conditions:

(1) primary plus secondary stress intensity range of 2.4Sm for ferritic steel and austenitic steel (2) cumulative usage factor U of 0.4 (c) All dissimilar metal welds not covered under Category B-F.

(d) Additional piping welds so that the total number of circumferential butt welds (or branch connection or socket welds) selected for examination equals 25% of the circumferential butt welds (or branch connection or socket welds) in the reactor coolant piping system. This total does not include welds exempted by IWB-1220 or welds in Item No. B9.22. These additional welds may be located in one loop (one loop is defined for both PWR and BWR plants in the 1977 Edition).

(2) A 10% sample of PWR high pressure safety injection system circumferential welds in piping NPS 112 (DN 40) and < NPS 4 (DN100) shall be selected for examination. This sample shall be selected from locations determined by the Owner as most likely to be subject to thermal fatigue. Thermal fatigue may be caused by conditions such as valve leakage or turbulence effects.

(3) NA to Unit-2 Preservice activities (4) Includes essentially 100% of weld length.

(5) For circumferential welds with intersecting longitudinal welds, surface examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting Examination Category B-F and B-J circumferential welds.

(6) For circumferential welds with intersecting longitudinal welds, volumetric examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting Examination Category B-F and B-J circumferential welds. The following requirements shall also be met:

(a) When longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume.

(b) When longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.

(7) For welds in carbon or low alloy steels, only those welds showing reportable preservice transverse indications need to be examined by the ultrasonic method for reflectors transverse to the weld length direction except that circumferential welds with intersecting longitudinal welds shall meet Note (5).

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 34 of 77 Examination Category B-K, Welded Attachments for Vessels, Piping, Pumps and Valves Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Pressure Vessels B10.10 Welded Attachments (1)

Applicable Surface (7)

IWB-2500-13, 14 and 15 Each welded attachment (2)(6)

IWB-3516 5

5 Piping B10.20 Welded Attachments (1)

Applicable Surface IWB-2500-13, 14 and 15 Each welded attachment (2)(6)

IWB-3516 TBD TBD Pumps B10.30 Welded Attachments (1)

NA to Unit-2 Valves B10.40 Welded Attachments (1)

NA to Unit-2 Totals Examination Category B-K TBD TBD NOTES:

(1) Weld buildup on nozzles that is in compression under normal conditions and provides only component support is excluded from examination. Examination is limited to those welded attachments that meet the following conditions:

(a) the attachment is on the outside surface of the pressure retaining component; (b) the attachment provides component support as defined in NF-1110; (c) the attachment weld joins the attachment either directly to the surface of the component or to an integrally cast or forged attachment to the component, and (d) the attachment weld is full penetration fillet, or partial penetration, continuous or intermittent.

(2) The extent of the examination includes essentially 100% of the length of the attachment weld at each attachment subject to examination.

(3) NA to Unit-2 Preservice activities (4) NA to Unit-2 Preservice activities (5) NA to Unit-2 Preservice activities (6) Examination is required whenever component support member deformation, e.g., broken, bent, or pulled out parts, is identified during operation, refueling, maintenance, examination, or testing.

(7) For the configurations shown in Figs. IWB-2500-13 and IWB-2500-14, a surface examination from an accessible side of the attachment weld shall be performed. Alternatively, for the configuration shown in Fig. IWB-2500-14, a volumetric examination of volume A-B-C-D from an accessible side of the attachment weld may be performed in lieu of the surface examination of surfaces A-B or C-D.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 35 of 77 Examination Category B-L-1, Pressure Retaining Welds in Pump Casings; B-M-1, Pressure Retaining Welds in Valve Bodies; B-L-2, Pump Casings; B-M-2, Valve Bodies Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Pumps B12.10 Pump casing welds, B-L-1 (4)

Applicable VT-1 IWB-2500-16 All welds IWB-3518 4

4 B12.20 Pump casing, B-L-2 (2) 4 0

Valves B12.30 Valves, less than NPS 4 valve body welds, B-M-1 (4)

NA to Unit-2 B12.40 Valves, NPS 4 or larger valve body welds, B-M-1 (4)

NA to Unit-2 B12.50 Valve body, exceeding NPS 4, B-M-2 (2)

TBD 0

Totals Examination Category B-L-1 TBD 4

NOTES:

(1) NA to Unit-2 Preservice activities (2) NA to Unit-2 Preservice activities, reference IWB-2200 (3) NA to Unit-2 Preservice activities (4) Includes essentially 100% of weld length.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 36 of 77 Examination Category B-N-1, Interior of Reactor Vessel; B-N-2, Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3, Removable Core Support Structures Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent &

Frequency of Exam Acceptance Standard Total Population Required Examination Reactor Vessel B13.10 Vessel Interior B-N-1 (1)

Applicable VT-3 Accessible Areas Each Inspection Period IWB-3520.2 1

1 Reactor Vessel (BWR)

B13.20 Interior attachments within beltline region B-N-2 NA to Unit-2 B13.30 Interior attachments beyond the beltline region B-N-2 NA to Unit-2 B13.40 Core Support Structure B-N-2 NA to Unit-2 Reactor Vessel (PWR)

B13.50 Interior attachments within beltline region B-N-2 NA to Unit-2 B13.60 Interior attachments beyond the beltline region B-N-2 Applicable VT-3 Accessible Welds Welds IWB-3520.2 6

6 B13.70 Core Support Structure B-N-3 (2)

Applicable VT-3 Accessible Surfaces Surfaces IWB-3520.2 1

1 Examination Category B-N-1 1

1 Examination Category B-N-2 6

6 Totals Examination Category B-N-3 1

1 NOTES:

(1) Areas to be examined shall include the spaces above and below the reactor core that are made accessible for examination by removal of components during normal refueling outages.

(2) The structure shall be removed from the reactor vessel for examination.

(3) NA to Unit-2 Preservice activities

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWB

SUMMARY

TABLES Page 37 of 77 Examination Category B-O, Pressure Retaining Welds in Control Rod Housings Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination Reactor Vessel B14.10 Welds in CRD Housing (1)

Applicable Volumetric or Surface IWB-2500-18 100%

Peripheral CRD Housing IWB-3523 20 20 Totals Examination Category B-O 20 20 Note:

(1) 20 Peripheral components of the 78 Total CRD Housings.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 38 of 77 SECTION 5.0 IWC

SUMMARY

TABLES For ASME CLASS 2 INDEX CATEGORY C-A, Pressure Retaining Welds in Pressure Vessels C-B, Pressure Retaining Nozzle Welds in Vessels C-C, Welded Attachments for Vessels, Piping, Pumps, and Valves C-D, Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-G, Pressure Retaining Welds in Pumps and Valves ASME Section XI items that do not apply to Watts Bar Unit 2 within this Program Plan will be identified with, NA to Unit-2, this documents the item does not apply and will not be referenced further within the program plan, schedule or summary reports.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 39 of 77 Examination Category C-A, Pressure Retaining Welds in Pressure Vessels Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination C1.10 Shell Circumferential Welds (1) (3) (4)

Applicable Volumetric (5)

IWC-2500-1 Welds at gross structural discontinuity (2)

IWC-3510 5

TBD C1.20 Head Circumferential Welds (1) (3) (4)

Applicable Volumetric (5)

IWC-2500-1 Welds at gross structural discontinuity (2)

IWC-3510 15 TBD C1.30 Tubesheet-to-Shell Weld (1) (3) (4)

Applicable Volumetric (5)

IWC-2500-2 Welds at gross structural discontinuity (2)

IWC-3510 4

TBD Totals Examination Category C-A NOTES:

(1) Includes essentially 100% of the weld length.

(2) Gross structural discontinuity is defined in NB-3213.2. Examples are junctions between shells of different thicknesses, cylindrical shell-to-conical shell junctions, shell (or head)-to-flange welds, and head-to-shell welds.

(3) In the case of multiple vessels of similar design, size, and service (such as steam generators, heat exchangers), the required examinations may be limited to one vessel or distributed among the vessels.

(4) The vessel areas selected for the initial examination shall be reexamined in the same sequence over the service lifetime of the component, to the extent practical.

(5) For welds in vessels with nominal wall thickness of 0.2 in. or less, a surface examination may be applied in lieu of a volumetric examination. The examination shall include the weld and 0.5 in. on either side of the weld. The acceptance standard for the examination shall be those specified for piping in IWC-3514.

TBD = To Be Determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 40 of 77 Examination Category C-B, Pressure Retaining Nozzle Welds in Vessels Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination C2.10 Nozzles in Vessels 1/2 in. nominal Thickness (1) (2) (3)(4)

C2.11 Nozzle-to-Shell (nozzle-to-head) Weld Applicable Surface IWC-2500-3 (6)

IWC-3511 0

TBD C2.20 Nozzles Without Reinforcing Plate in Vessels >

1/2 in. Nominal Thickness (1) (2) (3) (4)

C2.21 Nozzle-to Shell Weld (nozzle-to-head)

Applicable Surface and Volumetric IWC-2500-4 (a),(b)or(d)

(6)

IWC-3511 14 TBD C2.22 Nozzle Inside Radius Section Applicable Volumetric IWC-2500-4 (a),(b)or(d)

(6)

IWC-3511 8

TBD C2.30 Nozzles With Reinforcing Plate in Vessels > 1/2 in. Nominal Thickness (1) (2) (3) (4)

C2.31 Reinforcing Plate Welds to Nozzle and Vessel Applicable Surface IWC-2500-4(c)

(6)

IWC-3511 4

TBD C2.32 Nozzle-to Shell Weld (nozzle-to-head) when inside of vessel is accessible Applicable Volumetric IWC-2500-4(c)

(6)

IWC-3511 4

TBD C2.33 Nozzle-to Shell Weld (nozzle-to-head) when inside of vessel is inaccessible Applicable Visual, VT-2 (5)

(6)

No Leakage 0

TBD Totals Examination Category C-B 30 TBD NOTES:

(1) Includes nozzles welded to or integrally cast in vessels that connect to piping runs (manways and handholes are excluded).

(2) Includes only those piping runs selected for examination under Examination Category C-F.

(3) The nozzles selected initially for examination shall be reexamined in the same sequence over the service lifetime of the component, to the extent practical.

(4) In the case of multiple vessels of similar design, size, and service (such as steam generators, heat exchangers), the required examinations may be limited to one vessel or distributed among the vessels.

(5) The telltale hole in the reinforcing plate shall be examined for evidence of leakage while vessel is undergoing the system leakage test as required by examination category C-H (6) Nozzles at terminal ends (1) of piping run (2).

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 41 of 77 Examination Category C-C, Welded Attachments for Vessels, Piping, Pumps, and Valves Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination Pressure Vessels (1) (3)

C3.10 Welded Attachments Applicable Surface IWC-2500-5 (2)(4)(6)

IWC-3512 22 TBD Piping (1) (3)

C3.20 Welded Attachments Applicable Surface IWC-2500-5 (2)(4)(6)

IWC-3512 83 TBD Pumps (1) (3)

C3.30 Welded Attachments Applicable Surface IWC-2500-5 (2)(4)(6)

IWC-3512 14 TBD Valves C3.40 Welded Attachments NA to Unit 2*

0 TBD Totals Examination Category C-C 119 TBD NOTES:

(1) Examination is limited to those welded attachments that meet the following conditions:

(a) the attachment is on the outside surface of the pressure retaining component; (b) the attachment provides component support as defined in NF-1110; (c) the attachment weld joins the attachment either directly to the surface of the component or to an integrally cast or forged attachment to the component; and (d) the attachment weld is full penetration, fillet, or partial penetration, continuous, or intermittent.

(2) The extent of the examination includes essentially 100% of the length of the attachment weld at each attachment subject to examination.

(3) Selected samples of welded attachments shall be examined each inspection interval.

(4) For multiple vessels of similar design, function, and service, only one welded attachment of only one of the multiple vessels shall be selected for examination.

(5) For piping, pumps, and valves, a sample of 10% of the welded attachments associated with the component supports selected for examination under IWF-2510 shall be examined.

(6) Examination is required whenever component support member deformation, e.g., broken, bent, or pulled out parts, is identified during operation, refueling, maintenance, examination, or testing.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 42 of 77 Examination Category C-D, Pressure Retaining Bolting Greater than 2 in. in Diameter Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination Pressure Vessels (1) (2)

C4.10 Bolts and Studs Applicable Volumetric (5)

IWC-2500-6 All bolts or studs at the bolted connection (4)

IWC-3513 (5) 1 (16 bolts)

TBD Piping (3)

C4.20 Bolts and Studs NA to Unit 2 0

TBD Pumps C4.30 Bolts and Studs NA to Unit 2 0

TBD Valves C4.40 Bolts and Studs NA to Unit 2 0

TBD Total Examination Category C-D 1

TBD NOTES:

(1) The examination may be performed on bolting in place under load or upon disassembly of the connection.

(2) The examination of bolting for vessels, pumps, or valves may be conducted on one vessel, one pump, or one valve among a group of vessels, pumps, or valves that are similar in design, size, function, and service. In addition, when the component to be examined contains a group of bolted connections of similar design and size (such as flanged connections or manway covers), the examination may be conducted on one bolted connection among the group.

(3) The examination of flange bolting in piping systems may be limited to one bolted connection among a group of bolted connections that are similar in design, size, function, and service.

(4) The areas selected for the initial examination shall be reexamined in the same sequence over the service lifetime of the component, to the extent practical.

(5) When bolts or studs are removed for examination, surface examination meeting the acceptance standards of IWB-3515 may be substituted for volumetric examination.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 43 of 77 Examination Category C-F-1, Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population (2)

Required Examination (2)(3)

C5.10 C5.11 Piping Welds 3/8 in. Nominal Wall Thickness for Piping > NPS 4 Circumferential Welds (> NPS 4)

RHRS SIS Applicable Applicable Vol. & Sur.

Vol. & Sur.

IWC-2500-7 IWC-2500-7 100% of each weld requiring exam (4)(5)(6)

IWC-3514 IWC-3514 270 155 21 12 C5.20 C5.21 Piping Welds > 1/5 in. nominal Wall Thickness for Piping 2 and NPS 4 Circumferential Welds (1)

(High Pressure Safety Injection)

Applicable Vol. & Sur.

IWC-2500-7 100% of each weld requiring exam (4)(5)(6)

IWC-3514 TBD TBD C5.30 Socket Welds Applicable Sur.

IWC-2500-7 100% of each weld requiring exam (4)(5)(6)

IWC-3514 TBD TBD C5.40 C5.41 Pipe Branch Connections of Branch Piping NPS 2 Circumferential Weld Applicable Sur.

IWC-2500-9,10,11,12&13 100% of each weld requiring exam (4)(5)

IWC-3514 TBD TBD Total Examination Category C-F-1 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 44 of 77 Examination Category C-F-1, Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping Inspection Program B NOTES:

(1) Requirements for examination of welds in piping NPS 4 (DN 100) apply to PWR high pressure safety injection and auxiliary feedwater systems in accordance with the exemption criteria of IWC-1220.

(2) The welds selected for examination shall include 7.5%, but not less than 28 welds, of all dissimilar metal, austenitic stainless steel or high alloy welds not exempted by IWC-1220. (Some welds not exempted by IWC-1220 are not required to be nondestructively examined per Examination Category C-F-1. These welds, however, shall be included in the total weld count to which the 7.5% sampling rate is applied.) The examinations shall be distributed as follows:

(a) the examinations shall be distributed among the Class 2 systems prorated, to the degree practicable, on the number of nonexempt dissimilar metal, austenitic stainless steel, or high alloy welds in each system (i.e., if a system contains 30% of the nonexempt welds, then 30% of the nondestructive examinations required by Examination Category C-F-1 should be performed on that system);

(b) within a system, the examinations shall be distributed among terminal ends, dissimilar metal welds, and structural discontinuities [See Note (3)] prorated, to the degree practicable, on the number of nonexempt terminal ends, dissimilar metal welds, and structural discontinuities in that system; and (c) within each system, examinations shall be distributed between line sizes prorated to the degree practicable.

(3) Structural discontinuities include pipe weld joints to vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc., conforming to ANSI B16.9), and pipe branch connections and fittings.

(4) The welds selected for examination shall be reexamined in the same sequence, during subsequent inspection intervals over the service lifetime of the piping component, to the extent practical.

(5) For circumferential welds with intersecting longitudinal welds, surface examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting circumferential welds.

(6) For circumferential welds with intersecting longitudinal welds, volumetric examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting circumferential welds. The following requirements shall also be met:

(a) When longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume.

(b) When longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 45 of 77 Examination Category C-F-2, Pressure Retaining Welds in Carbon or Low Alloy Steel Piping Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population (2)

Required Examination (2)(3)

C5.50 C5.51 Piping Welds 3/8 in. Nominal Wall Thickness for Piping > NPS 4 Circumferential Welds (1)

AFWS FWS MSS Applicable Applicable Applicable Vol. & Sur.

Vol. & Sur.

Vol. & Sur.

IWC-2500-7 IWC-2500-7 IWC-2500-7 100% of each weld requiring exam (4)(5)(6)(7)

IWC-3514 IWC-3514 IWC-3514 TBD 100 138 TBD 8

11 C5.60 C5.61 Piping Welds > 1/5 in. nominal Wall Thickness for Piping 2 and NPS 4 Circumferential Welds (1)

Applicable Vol. & Sur.

IWC-2500-7 100% of each weld requiring exam (5)(6)(7)

IWC-3514 TBD TBD C5.70 Socket Welds NA to Unit 2 C5.80 C5.81 Pipe Branch Connections of Branch Piping NPS 2 Circumferential Weld (1)(4)

NA to Unit 2 Total Examination Category C-F-2 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 46 of 77 Examination Category C-F-2, Pressure Retaining Welds in Carbon or Low Alloy Steel Piping Inspection Program B NOTES:

(1) Requirements for examination of welds in piping NPS 4 (DN 100) apply to PWR high pressure safety injection and auxiliary Feedwater systems in accordance with the exemption criteria of IWC-1220.

(2) The welds selected for examination shall include 7.5%, but not less than 28 welds, of all carbon and low alloy steel welds not exempted by IWC-1220. (Some welds not exempted by IWC-1220 are not required to be nondestructively examined per Examination Category C-F-2. These welds, however, shall be included in the total weld count to which the 7.5% sampling rate is applied.) The examinations shall be distributed as follows:

(a) the examinations shall be distributed among the Class 2 systems prorated, to the degree practicable, on the number of nonexempt carbon and low alloy steel welds in each system (i.e., if a system contains 30% of the nonexempt welds, then 30% of the nondestructive examinations required by Examination Category C-F-2 should be performed on that system);

(b) within a system, the examinations shall be distributed among terminal ends and structural discontinuities [see Note (3)] prorated, to the degree practicable, on the number of nonexempt terminal ends and structural discontinuities in that system; and (c) within each system, examinations shall be distributed between line sizes prorated to the degree practicable.

(3) Structural discontinuities include pipe weld joints to vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc., conforming to ANSI B16.9), and pipe branch connections and fittings.

(4) The welds selected for examination shall be reexamined in the same sequence, during subsequent inspection intervals over the service lifetime of the piping component, to the extent practical.

(5) Only those welds showing reportable preservice transverse indications need to be examined by the ultrasonic method for reflectors transverse to the weld length direction, except that circumferential welds with intersecting longitudinal weld shall meet Note (7).

(6) For circumferential welds with intersecting longitudinal welds, surface examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting circumferential welds.

(7) For circumferential welds with intersecting longitudinal welds, volumetric examination of the longitudinal piping welds is required for those portions of the welds within the examination boundaries of intersecting circumferential welds. The following requirements shall also be met:

(a) When longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume.

(b)

When longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWC

SUMMARY

TABLES Page 47 of 77 Examination Category C-G, Pressure Retaining Welds in Pumps and Valves Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination Pumps C6.10 Pumps Casing Welds NA to Unit 2 Valves (1)(2)(3)

C6.20 Valve Body Welds Applicable Surface IWC-2500-8 (4)

IWC-3515 TBD TBD Total Examination Category C-G TBD TBD NOTES:

(1) In case of multiple pumps or valves of similar design, size, function, and service in a system, required weld examinations may be limited to all the welds in one pump or one valve in the same group or distributed among any of the pumps or valves of that same group.

(2) The examination may be performed from either the inside or outside surface of the component.

(3) The pumps and valves initially selected for examination shall be reexamined in the same sequence over the service lifetime of the component, to the extent practical.

(4) 100% welds in all components in each piping run examined under Examination Category C-F, each inspection interval.

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWD

SUMMARY

TABLES Page 48 of 77 SECTION 6.0 IWD

SUMMARY

TABLES for ASME CLASS 3 INDEX CATEGORY D-A, Welded Attachments for Vessels, Piping, Pumps and Valves ASME Section XI items that do not apply to Watts Bar Unit 2 within this Program Plan will be identified with, NA to Unit-2, this documents the item does not apply and will not be referenced further within the program plan, schedule or summary reports.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWD

SUMMARY

TABLES Page 49 of 77 Examination Category D-A, Welded Attachments for Vessels, Piping, Pumps and Valves Inspection Program B Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent and Frequency of Exam Acceptance Standard Total Population Required Examination Pressure Vessels (1)

D1.10 Welded Attachments Applicable VT-1 IWD-2500-1 (2) (4)(5)

IWD-3000 TBD TBD Piping (1)

D1.20 Welded Attachments Applicable VT-1 IWD-2500-1 (2) (4)(5)

IWD-3000 TBD TBD Pumps (1)

D1.30 Welded Attachments NA to Unit-2 Valves (1)

D1.40 Welded Attachments NA to Unit-2 Total Examination Category D-A TBD TBD NOTES:

(1) Examination is limited to those welded attachments that meet the following conditions:

(a) the attachment is on the outside surface of the pressure retaining component; (b) the attachment provides component support as defined in NF-1110; (c) the attachment weld joins the attachment either directly to the surface of the component or to an integrally cast or forged attachment to the component; and (d) the attachment weld is full penetration, fillet, or partial penetration, continuous, or intermittent.

(2) The extent of the examination includes essentially 100% of the length of the attachment weld at each attachment subject to examination.

(3) N/A to WBN-2 Preservice Examination (4) Examination is required whenever component support member deformation, e.g., broken, bent, or pulled out parts, is identified during operation, refueling, maintenance, examination, or testing.

(5) 100% of required area of each welded attachments, each inspection interval or each occurrence identified in note (4).

TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 50 of 77 SECTION 7.0 IWF

SUMMARY

TABLE For ASME CLASS 1, 2, 3 & MC INDEX CATEGORY F-A, Supports ASME Section XI items that do not apply to Watts Bar Unit 2 within this Program Plan will be identified with, NA to Unit-2, this documents the item does not apply and will not be referenced further within the program plan, schedule or summary reports.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 51 of 77 Examination Category F-A, Supports Inspection Program B Item No.

Support Types Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination F1.10 Class 1 Piping Supports (1) (2)

Applicable VT-3 IWF-1300-1 (5)

IWF-3410 TBD TBD F1.20 Class 2 Piping Supports (1) (2)

Applicable VT-3 IWF-1300-1 (5)

IWF-3410 TBD TBD F1.30 Class 3 Piping Supports (1) (2)

Applicable VT-3 IWF-1300-1 (5)

IWF-3410 TBD TBD F1.40 Supports Other Than Piping supports (1)

Class 1, 2 and 3 Applicable VT-3 IWF-1300-1 (5)

IWF-3410 TBD TBD F1.40 MC Supports NA to Unit-2 Total Examination Category F-A TBD TBD NOTES:

(1) Item numbers shall be categorized to identify support types by component support function (e.g., A = supports such as one directional rod hangers; B = supports such as multi-directional restraints; and C = supports that allow thermal movement, such as springs). Reference tables below for each type. This is established for future activities.

(2) The totals shall be comprised of supports from each system (such as Main Steam, Feedwater, or RHR), proportional to the total number of non-exempt supports of each type and function within each system. Reference tables below for each system. This is established for future activities.

(3) N/A to WBN-2 Preservice Inspection.

(4) N/A to WBN-2 Preservice Inspection.

(5) 100% of all supports not exempted TBD = To be determined

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 52 of 77 CLASS 1 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY TYPE Examination Category Item Number Type & Description Exam Method Total Number F-A, Supports Class 1 Piping F1.10A Type A Supports (one directional restraints)

Visual, VT-3 TBD F1.10B Type B Supports (multidirectional restraints)

Visual, VT-3 TBD F1.10C Type C Supports (thermal movement, i.e. variable or constant springs)

Visual, VT-3 TBD F1.10D Type D Supports (Snubber Types)

Visual, VT-3 TBD Totals TBD CLASS 1 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY SYSTEM & TYPE TBD = To Be Determined Sys Type A Type B Type C Type D Totals Total Req.

Total Req.

Total Req.

Total Req.

CVCS 100 100 100 100 RCS 100 100 100 100 RHR 100 100 100 100 RHRS 100 100 100 100 SIS 100 100 100 100 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 53 of 77 CLASS 2 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY TYPE Examination Category Item Number Type & Description Exam Method Total Number F-A, Supports Class 2 Piping F1.20A Type A Supports (one directional restraints)

Visual, VT-3 TBD F1.20B Type B Supports (multidirectional restraints)

Visual, VT-3 TBD F1.20C Type C Supports (thermal movement, i.e. variable or constant springs)

Visual, VT-3 TBD F1.20D Type D Supports (Snubber Types)

Visual, VT-3 TBD Totals TBD CLASS 2 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY SYSTEM & TYPE TBD = To Be Determined Sys Type A Type B Type C Type D Totals Total Req.

Total Req.

Total Req.

Total Req.

AFWS 100 100 100 100 CSS 100 100 100 100 CVCS 100 100 100 100 FWS 100 100 100 100 MSS 100 100 100 100 RHRS 100 100 100 100 SIS 100 100 100 100 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 54 of 77 CLASS 3 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY TYPE Examination Category Item Number Type & Description Exam Method Total Number F-A, Supports Class 3 Piping F1.30A Type A Supports (one directional restraints)

Visual, VT-3 TBD F1.30B Type B Supports (multidirectional restraints)

Visual, VT-3 TBD F1.30C Type C Supports (thermal movement, i.e. variable or constant springs)

Visual, VT-3 TBD F1.30D Type D Supports (Snubber Types)

Visual, VT-3 TBD Totals TBD CLASS 3 NON-EXEMPT PIPING SUPPORT DISTRIBUTION BY SYSTEM & TYPE TBD = To Be Determined Sys Type A Type B Type C Type D Totals Total Req.

Total Req.

Total Req.

Total Req.

AFWS 100 100 100 100 CCS 100 100 100 100 ERCWS 100 100 100 100 FPCS 100 100 100 100 HPFPS 100 100 100 100 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 IWF

SUMMARY

TABLES Page 55 of 77 CLASS 1, 2 & 3 NON-EXEMPT SUPPORTS DISTRIBUTION BY TYPE Examination Category Item Number Type & Description Exam Method Total Number F-A, Supports Class 1, 2 & 3 Components F1.40A Type A Supports (one directional restraints)

Visual, VT-3 TBD F1.40B Type B Supports (multidirectional restraints)

Visual, VT-3 TBD F1.40C Type C Supports (thermal movement, i.e. variable or constant springs)

Visual, VT-3 TBD F1.40D Type D Supports (Snubber Types)

Visual, VT-3 TBD Totals TBD CLASS 1, 2 & 3 NON-EXEMPT SUPPORTS DISTRIBUTION BY SYSTEM & TYPE TBD = To Be Determined Sys Type A Type B Type C Type D Totals Total Req.

Total Req.

Total Req.

Total Req.

TBD 100 100 100 100 TBD TBD

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 AUGMENTED

SUMMARY

TABLES Page 56 of 77 SECTION 8.0 AUGMENTED EXAMINATION REGULATORY COMMITMENTS I.

Letters from TVA to NRC:

1. WBN U2, Initial Response to Bulletins and Generic Letters, dated September 7, 2007, ML072570676
2. WBN U2, Supplemental Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors, dated September 20, 2008, ML082750518
3. WBN U2, Supplemental Information Regarding Certain NRC Generic Letters and Bulletins, dated April 1, 2010, ML100950044 For the ASME Section XI program portion, the letters listed above are divided into Preservice and Inservice requirements, excluding steam generator tubing, below. The Inservice requirements will be incorporated into the first interval ISI program for WBN Unit 2.

Preservice Commitments

1. (Attachment 3 of referenced letter 1 and Enclosure 1 of referenced letter 3) WBN U2 will perform a baseline inspection of the RPV head penetration nozzles prior to fuel load that consists of paragraph IV.C(5)(b) of the First Revised Order EA-03-009.
2. (Attachment 5 of referenced letter 1) TVA will perform a baseline inspection (VT-2) of the lower head penetrations prior to fuel load.
3. (Attachment 6 of referenced letter 1, Enclosure 1 of referenced letter 2, and Enclosure 5 of referenced letter 3) WBN U2 will perform NDE prior to and after completion of mechanical stress improvement process (MSIP) of the pressurizer power operated relief valve connections, the safety relief valve connections, and the spray line nozzle and surge line nozzle connections. Should circumferential cracking be observed in either pressure boundary or non-pressure boundary portions of any of the locations covered by the scope of NRC Bulletin 2004-01, TVA will develop plans to perform an adequate extent-of-condition evaluation, and TVA will discuss those plans with cognizant NRC technical staff prior to starting Unit 2.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 AUGMENTED

SUMMARY

TABLES Page 57 of 77 Inservice Commitments

1. (Enclosure 1 of referenced letter 3) WBN U2 will perform inspections during the first refueling outage according to 10CFR50.55a(g)(6)(ii)(D)(2) through (6) and ASME Code Case N-729-1. NOTE: This commitment may require updating when the Proposed Rules published in Federal Register, Vol. 75 No. 85, dated May 4, 2010, are incorporated into 10CFR50.55a.
2. (Attachment 5 of referenced letter 1) WBN U2 will perform a VT-2 examination of the RPV lower head penetrations during the first refueling outage.
3. (Attachment 6 of referenced letter 1, Enclosure 1 of referenced letter 2, and Enclosure 5 of referenced letter 3) WBN U2 will perform bare metal visual (BMV) inspection of the upper pressurizer Alloy 600 locations at the first refueling outage. If any evidence of apparent reactor coolant pressure boundary leakage is discovered during the BMV examination, then NDE capable of determining crack orientation will be performed in order to accurately characterize the flaw, the orientation, and extent. TVA will develop plans to perform an adequate extent of condition evaluation, and plans to possible expand the scope of NDE to other componennts in the pressurizer, which will be discussed with NRC technical staff prior to restarting Unit 2. TVA will provide the required response for inspections performed within 60 days after completion of the first refueling outage.

II.

Other PSI/ISI commitments Preservice Commitment NCO080008099 - TVA plans to submit PSI related relief requests on or before September 24, 2010.

Inservice Commitment NCO080008038 - Submit Inservice Inspection (ISI) program within 6 months after receiving an operating license.

WATTS BAR UNIT - 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 AUGMENTED

SUMMARY

TABLES Page 58 of 77 Examination Category A-E, Augmented Examination - Preservice Commitment Class 1 PWR Components Containing Alloy 600/82/182 Item No.

Component Examined Component Compliance Exam Method Examination Requirements Fig. No.

Extent of Exam Acceptance Standard Total Population Required Examination RPV Head CRD Nozzle J-Groove welds Vent pipe J-Groove weld EA 03-009 (revised)

UT N/A Note 1 NRC letter April 11, 2003 (ML0309803

22) 78 1

78 1

CRD Nozzle J-Groove welds Vent pipe J-Groove weld EA 03-009 (revised)

Surface N/A Wetted Surface of weld see above 78 1

78 1

RPV Lower Head Instrumentation Nozzle Penetrations NRC Bulletin 2003-02 VT-2 N/A Area around instrument nozzles No Leakage 58 58 Pressurizer Spray Nozzle-to-pipe connection Releif/Safety Nozzle-to-pipe connection Surge Nozzle-to-pipe connection NRC Bulletin 2004-01 UT IWB-2500-8 Pre-and Post-MSIP IWB-3514 1

4 1

1 4

1 Note 1 - Examine weld from 2 above the highest point of the root of the J-groove weld on a horizontal plane and from 2 below the toe of the J-groove weld on a horizontal plane.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Request for Relief Page 59 of 77 SECTION 9.0 REQUESTS FOR RELIEF INDEX RFR Number Subject 10CFR50.55a Status Comments WBN-2/PDI-4 Alternative Examination for RPV Shell-to -Flange 10CFR50.55a(a)(3)(i)

Approved 9/3/09 TAC No. ME0022

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Request for Relief Page 60 of 77 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) SECTION XI, REQUEST FOR RELIEF WBN-2/PDI-4 TVA requests approval for an alternative to ASME Section XI, paragraph IWA-2232 of the ASME Section XI 2001 Edition through the 2003 Addenda, for the Preservice Examinations at Watts Bar Unit 2.

Specifically, for use of Appendix VIII and Performance Demonstration Initiative (PDI) methodologies for performance of the ultrasonic examination of reactor pressure vessel shell-to-flange welds in lieu of the requirement of Appendix I and the associated Article 4, ASME Section V EXECUTIVE

SUMMARY

In accordance with 10 CFR 50.55a(a)(3)(i), TVA is requesting relief from the specific requirements of performing the volumetric examination of the reactor pressure vessel (RPV) circumferential shell-to-flange weld at Watts Bar Unit 2 in accordance with the requirement of Appendix I of Section XI. In lieu of the requirements of Appendix I and its associated sub-requirements of Article 4 of Section V, Watts Bar Unit 2 will use the techniques, personnel, and equipment qualified to meet the requirements of ASME Section XI Appendix VIII, Supplements 4 and 6 of the 2001 Edition through the 2003 Addenda, as administered by the Electric Power Research Institutes (EPRI) Performance Demonstration Initiative (PDI) processes. Watts Bar plans to use the proposed alternative for the Preservice RPV examinations to be performed prior to commercial operations. This proposed alternative represents the best available methodology in qualification of equipment and personnel performing ultrasonic examinations and uses an examination process that has provided and will provide the highest practical quality and greatest amount of coverage for the performance of the shell-to-flange weld examinations. As such, the proposed alternative methodology provides an acceptable level of quality and safety. In addition, the approval of this relief results in savings in the cost of performing the examinations, with not having to incorporate the use of two different sets of examination equipment, and also in future examination will results in lower personnel radiation exposure from not having to use a different methodology for the shell-to-flange weld.

Note that this request for relief is similar to the request granted to Watts Bar Unit 1 during the First and Second 10 Year Intervals submitted most recently in a letter from TVA to the NRC, dated February 7, 2007 and approved by the Staff in a letter dated February 28, 2008 (Ref. ML080630679).

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Request for Relief Page 61 of 77 SYSTEM/COMPONENT(S) FOR WHICH RELIEF IS REQUESTED:

ASME Code Class 1 Reactor Pressure Vessel (RPV) Upper Vessel Shell-to-Flange Welds, Table IWB-2500-1 Category B-A, Item Number B1.30:

APPLICABLE CODE EDITION AND ADDENDA FOR THE GIVEN EXAM The applicable ASME section XI code edition and Addenda of Record for Watts Bar Unit 2 Preservice inspection is the 2001 Edition through 2003 Addenda with applicable amendments from 10CFR50.55a.

CODE REQUIREMENTS FROM WHICH RELIEF IS REQUESTED:

In accordance with ASME Section XI, paragraph IWA-2232, Ultrasonic examinations shall be conducted in accordance with Appendix I.

Further, in accordance with Appendix I, paragraph I-2110(b) Ultrasonic examination of reactor vessel-to-flange welds, closure head-to-flange welds, and integral attachment welds shall be conducted in accordance with Article 4 of Section V, except that alternative examination beam angles may be used.

RELIEF REQUESTED:

Pursuant to 10 CFR 50.55a(a)(3)(i), TVA requests relief from performing the designated vessel shell-to-flange weld examination in accordance with the requirements of ASME Section XI, paragraph IWA-2232, Appendix I, and the associated Article 4 of Section V methodology in accordance with paragraph I-2110(b).

BASIS FOR RELIEF:

In accordance with ASME Section XI, Subarticle IWA-2232, TVA is required to perform ultrasonic examinations (UT) of the RPV upper shell-to-flange welds using Section XI, Appendix I, which in turn requires the use of the NDE methodologies and processes of ASME Section V, Article 4. In addition, the guidance of RG-1.150, Revision 1, was historically applied. The above listed weld is the only circumferential shell weld in the RPV that are not examined in accordance with the requirements of ASME Section XI, Appendix VIII, as mandated in 10 CFR 50.55a. This rule change mandated the use of ASME Section XI, Appendix VIII, Supplements 4 and 6 for the conduct of RPV examinations. It has been recently stated in EPRI PDI coordination meetings between the PDI committee members and the NRC Staff representatives that the NRC Staff expectations are that licensees should submit requests for relief to use the more technically advanced Appendix VIII/PDI processes for the shell-to-flange weld exams, in lieu of the Section XI Appendix I and its associated Section V, Article 4 processes.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Request for Relief Page 62 of 77 PROPOSED ALTERNATIVES TVA proposes to use the procedures, personnel, and equipment qualified to meet the requirements of ASME Section XI Appendix VIII, Supplements 4 and 6 as administered by the Electric Power Research Institutes (EPRI) Performance Demonstration Initiative (PDI), to conduct the required vessel-to-flange weld examinations.

JUSTIFICATION FOR GRANTING RELIEF:

ASME Section V, Article 4, describes the required techniques to be used for the UT of welds in ferretic pressure vessels with wall thicknesses greater than 2 inches. The techniques were first published in ASME Section V in the 1974 Edition, summer 1975 Addenda. The calibration techniques, recording criteria and flaw sizing methods are based upon the use of a distance-amplitude-correction curve (DAC) derived from machined reflectors in a basic calibration block. UT performed in accordance with Section V, Article 4, used recording thresholds of 50 percent DAC for the outer 80 percent of the required examination volume and 20 percent DAC from the clad/base metal interface to the inner 20 percent margin of the examination volume. Indications detected in the designated exam volume portions, with amplitudes below these thresholds, were therefore not required to be recorded. Use of the Appendix VIII/PDI processes would enhance the quality of the examination results reported because the detection sensitivity is more conservative and the procedure requires the examiner to evaluate all indications determined to be flaws regardless of their associated amplitude. The recording thresholds in Section V, Article 4, requirements and in the guidelines of RG-1.150, Revision 1, are generic and somewhat arbitrary and do not take into consideration such factors as flaw orientation, which can influence the amplitude of UT responses.

The EPRI Report NP-6273, Accuracy of Ultrasonic Flaw Sizing Techniques for Reactor Pressure Vessels, dated March 1989, established that UT flaw sizing techniques based on tip diffraction are the most accurate. The qualified prescriptive-based UT procedures of ASME Section V, Article 4 have been applied in a controlled process with mockups of RPVs which contained real flaws and the results statistically analyzed according to the screening criteria in Appendix VIII of ASME Section XI. The results show that the procedures in Section V, Article 4, are less effective in detecting flaws than procedures qualified in accordance with Appendix VIII as administered by the PDI processes. Appendix VIII/PDI qualification procedures use the tip diffraction techniques for flaw sizing. The proposed alternative Appendix VIII/PDI UT methodology uses analysis tools based upon echo dynamic motion and tip diffraction criteria which has been validated, and is considered more accurate than the Section V, Article 4 processes.

UT performed in accordance with the Section V, Article 4 processes requires the use of beam angles of 0o, 45o, 60o, and 70o with recording criteria that precipitates equipment changes. Having to perform these process changes is time consuming and results in increased radiation exposure for the examination personnel. Having to comply with the specific ASME Section XI, Appendix I requirements for the RPV circumferential shell-to-flange weld, when the data is obtained using a less technically advanced process, results in an examination that does not provide a compensating increase in quality and safety for the higher costs and personnel exposures involved.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Request for Relief Page 63 of 77 For future RPV shell-to-flange weld examinations TVA does not anticipate any less coverage than the required minimum of 90 percent of coverage. However, if any such limitations are encountered during the conduct of the examinations, separate individual relief requests will be submitted, as needed.

Procedures, equipment, and personnel qualified through the Appendix VIII, Supplements 4 and 6 PDI programs have shown to have a high probability of detection of flaws and are generally considered superior to the techniques employed earlier for RPV examinations. This results in increased reliability of RPV inspections and conditions where an acceptable level of quality and safety is provided with the proposed alternative methodologies. Accordingly, approval of this alternative evaluation process is requested pursuant to 10 CFR 50.55a(a)(3)(i).

IMPLEMENTATION SCHEDULE AND DURATION:

Upon approval by the NRC staff, TVA will implement the provisions of this request for the Preservice Inspection for Watts Bar Unit 2.

PRECEDENTS Note that this request for relief is similar to the request granted to Watts Bar Unit 1 during the First and Second 10 Year Intervals submitted most recently in a letter from TVA to the NRC, dated February 7, 2007 and approved by the Staff in a letter dated February 28, 2008 (Ref. ML080630679).

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 64 of 77 SECTION 10.0 ASME SECTION XI TECHNICAL POSITIONS Technical determination made during implementation of this PSI program and/or the examinations to clarify a position that is not clearly understandable or exclusive to Watts Bar Unit 2 from the referenced requirements. Each Technical Position should be numbered (1,2,3,ect.)

and reference to the corresponding paragraph in this or any other document that the subject pertains to and signed by as a minimum the program owner and a technical person, if appropriate and inserted in its entirety into this section following the next revision,.

TP Number Subject Reference Comments TP-1 Basis for Section XI Boundary Identification Section XI Class 1, 2 & 3 Components May be used for all Section XI activities or individually as stated in the TP.

TP-2 Retrieval of Historical Records and Radiographs Records Management Lifetime Storage Vault.

May be used for retrieval of Shop Radiograph and other records TP-3 Watts Bar Unit 1 and 2 Memorandum of Understanding, ASME Section XI Interface Section XI R/R activities for Unit 2 Process to follow and document ASME Section XI work on portions of Unit 2 systems

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 65 of 77 Basis for Section XI Boundary Identification Watts Bar Nuclear (WBN) Unit 2 ASME Section XI Preservice Inspection (PSI)

TP-1 This document is a technical position to establish the basis of the interrelationships with TVA classification system and ASME Section XI activities. Nothing in this technical position shall change the overall classification of a system or component from its original design. The intent is to adjoin the design of the plant with the inspection requirements of ASME Section XI requirements for inspection. The overall design of systems structures and components to the appropriate TVA classification is based on the guidelines in the Design Criteria Document, procedure number WB-DC-40-36, The Classification of Piping, Pumps, Valves, and Vessels. These criteria apply to piping, pumps, valves, and other pressure retaining components within fluid systems that perform a safety function. Primary and secondary safety functions are classified according to their relative importance in protecting the health and safety of the general public. The TVA Class A, B, C and D systems are classified as ASME Section III Class 1, 2 and 3 respectively, based on the relationship between the ANS Safety Class, TVA classifications, and Regulatory Guide 1.26 classifications. The Mechanical flow diagrams are labeled with the TVA classification in such a manner that the classification of every portion of a system can be determined from its flow diagram. The flow diagrams are used to designate the TVA classification A, B, C and D to establish the ASME Class 1, 2 or 3 boundaries to determine the ASME Section XI requirements.

ASME Section XI requires components identified for inspection and testing shall be governed by the group classification criteria and provides the inspection requirements for Class 1, 2 and 3 components.

ASME Section XI, IWA-1320 states the rules for IWB shall be applied to those systems whose components are classified ASME Class 1 and the rules for IWC apply to components classified as ASME Class 2 and the rules for IWD apply to components classified as ASME Class 3.

Therefore, based on the guidance of WB-DC-40-36 with reference to the ANS documents and Regulatory Guide 1.26 for classification of components, the labeling and marking of the boundary interface on the flow diagrams for classification of system,Section XI activities shall be determined for ASME Class 1, 2 and 3 systems and components. In reference to the boundary marking on the mechanical flow diagrams,Section XI inspection and testing boundaries will be determined, as required and if needed to farther distinguish the boundaries a color coding method can be used for informational purposes only for the various activities. To further distinguish the activities they are separated to explain the intent of the each and color coding of the boundaries.

1)

ASME Section XI Systems and Components (XISC)

This activity is to identify the system boundaries for components subject to Section XI activities. The boundaries are established based on the WBN -2 design and mechanical flow diagrams that apply to items classified as TVA Class A, B, C and D or ASME Section III Code Class 1, 2 & 3. This activity is not intended to include the Section XI inspection or testing requirements on systems or portions of a system that are optionally upgraded to a high classification, unless specifically directed by other requirements. This applies to systems of nonnuclear safety class to ASME Section III Class 2 or 3 and/or

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 66 of 77 Class 3 to Class 2, Class 2 to Class 1 or any combination there of. All other boundaries on safety Class systems represent the activities associated with Section XI, including Repair and Replacement regardless of the reason or method that detected the condition requiring the repair/replacement. To further distinguish the boundaries a set of color coded drawing can be established and labeled (i.e.2-48W801 XISC) with the XISC to designate the activities for systems and components for this scope of Section XI.

Red will be used to represent TVA Safety Class A or ASME Code Class 1. Yellow will be used to represent TVA Safety Class B or ASME Code Class 2 and finally green to represent TVA Safety Class C

& D or ASME Code Class 3. This set of color coded drawing is for informational use only and should be review for changes during periodic and/or interval updates to correspond with Section XI.

Note: This set of drawings may or may not be needed prior to startup as explained in NGDC PP-15, paragraph 2.0 C, but is needed to establish the ASME Section XI EXaminations (XIEX) and ASME Section XI Pressure Tests (XIPT) color coded drawings.

2)

ASME Section XI Pressure Tests (XIPT)

This activity is to identify the pressure testing requirements based on Section XI and within the previously established boundaries for Systems and Components. The pressure test boundaries are determined and established by the general requirements of Article IWA-5000 for ASME Class 1, 2, & 3 systems and components requiring a pressure test. The boundary limits are generally defined by the location of the safety class interface valves within the system or as describe in IWB, IWC and IWD requirements for Class 1, 2 and 3 systems respectively. This activity is not intended to include the Section XI inspection or testing requirements on systems or portions of a system that are optionally upgraded to a high classification, unless specifically directed by other requirements. This applies to systems of nonnuclear safety class to ASME Section III Class 2 or 3 and/or Class 3 to Class 2, Class 2 to Class 1 or any combination there of. All other boundaries on safety Class systems that represent the activities associated with Section XI are to enhance and distinguish the various pressure test boundaries.

A color coded drawing can be established and labeled (i.e. 2-48W801-1-XIPT) with the XIPT, to designate the system boundaries requiring a pressure tests and a visual VT-2 to be performed. The colors used to represent Class 1, 2 & 3 components are the same as previously established. This set of drawings is for informational use only and should be review for changes during periodic and/or interval updates to correspond with Section XI.

Note: This set of drawings is not needed prior to startup as explained in NGDC PP-15, paragraph 2.0 C, but is needed to establish the ASME Section XI EXaminations (XIEX) color coded drawings.

3)

ASME Section XI EXaminations (XIEX)

This activity is to identify the examination requirements based on Section XI and within the previously established boundaries for systems and components that are not exempted from volumetric, surface or visual requirements on Class 1, 2 and 3 pressure retaining components. This activity is not intended to include the Section XI inspection or testing requirements on systems or portions of a system that are optionally upgraded to a high classification, unless specifically directed by other requirements. This applies to systems of nonnuclear safety class to ASME Section III Class 2 or 3 and/or Class 3 to Class 2, Class 2 to Class 1 or any combination there of. All other boundaries on safety Class systems that represent the activities associated with Section XI are to enhance and distinguish the various examination

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 67 of 77 boundaries. A color coded drawing can be established and labeled (i.e.2-48W801-1-XIEX) with the XIEX, to designate the system boundaries requiring an examination by volumetric, surface or visual VT-1 or VT-3 methods. The colors used to represent Class 1, 2 & 3 components are the same as previously established. This set of drawings is for informational use only and should be review for changes during periodic and/or interval updates to correspond with Section XI. Also, the drawings will be a reference to establish the boundaries when creating the various location drawings to identify the individual examinations that will support the population of WBN Unit 2 Preservice Inspection Program Plan.

4)

ASME Section XI IWE/IWL (XIIWE)

This activity is to identify the examination boundaries based on Section XI IWE (ASME Categories MC) requirements that are determined to be accessible and not exempt. The boundaries will be determined by using the configuration drawing based on the design of WBN-2. To enhance and distinguish the various examination boundaries a color coded drawing can be established and labeled XIIWE, to designate the system boundaries requiring an examination. The boundaries will be represented by an outline of the color blue to designate the boundaries for examination. This set of drawings is for informational use only and should be review for changes during periodic and/or interval updates to correspond with Section XI.

Also, the drawing will be referenced to establish the detailed IWE drawing for PSI and ISI.

Note: The revision on all flow diagrams and the revision (RXX) used on the informational use color coded drawing for Section XI does not have to be the same but shall be reviewed for changes that will effect the overall Section XI configuration for inspection and/or testing. As a minimum these drawing shall be reviewed prior to each period and/or interval change as described in the WBN-2 Program Plan.

Prepared By:

E. Lynn McClain 5/12/2008 Program Owner:

E. Lynn McClain 5/12/2008 Technical Review:

Charlie Driskell 5/12/2008

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 68 of 77 Basis for Retrieval of Historical Records and Radiographs Watts Bar Nuclear (WBN) Unit 2 ASME Section XI Preservice Inspection (PSI)

TP-2 During the course of establishing the baseline inspection or during the inservice inspection certain records are required to be retrieved from time to time. The intent of the retrieval is for conformation of or aid in the inspection activities to qualify, verify or validate the components configuration, i.e. weld map records, retrieval of radiographs, etc. for various reasons.

The following outline may be used to retrieve weld map data and radiographs.

1. Select a weld from the desired PSI/ISI drawing.

Example: Drawing ISI-2068-W-04, weld RCS-025

2. Locate weld on referenced as constructed drawing from BSL.

Example: WBN-E-2282-IC-144. Enter as E2882IC144

3. Identity the weld as a field weld or shop weld.

If the weld is a field weld, order the radiograph from Records Management Lifetime Storage Vault.

If the weld is a shop weld, identify the sketch number and then retrieve from BSL.

Example: SK-E2882-1300. Enter as E2882-1300

4. Identify the weld number and piece mark on the piping fabrication sketch.

Example: Weld K, pc 68-RC-6

5. Identify the box number the radiograph is located in from the Supplier Radiograph Index Manual located in the Records Management Lifetime Storage Vault (Index is sorted like the example).

Example: E-2882, 68-RC-6 PC, SK 1300-K is located in Box number 42

6. Request that Records Management order the required radiograph from the National Underground Storage Facility.

Example: Box 42 is located in Room RC, Section 3, Shelf 2, Bin 6 Prepared By:

E. Lynn McClain 10/13/2009 Program Owner:

E. Lynn McClain 10/13/2009 Technical Review:

M. Darlene Tinley 10/13/2009

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 69 of 77 TP-3 TP-3 Watts Bar Unit 1 and 2 Memorandum of Understanding ASME Section XI Interface WBN Unit 1 systems were completed and licensed under the requirements of the ASME Section III program and since then, ASME Section XI has been Implemented. Portions of several Unit 2 systems were documented on Unit 1ASME NM5 Code Data Reports as being within the Unit 1ASME boundary but are not within the operational boundary for Unit 1.

Boundary calculations and design output (i.e., Unit 2 cross hatching) shows these portions of systems as under unit 2 configuration control. As a result of how these portions of systems were Installed and documented, work that needs to be performed in these areas to startup unit 2 will have to be performed to ASME SectionXI. Returning these portions of systems to ASME Section III Is not an option due to the potential Impact on the Unit 1ASME programs and potential delay to Unit 2.

The following proce8S will be followed to perform and document ASME Section XI work on portions of Unit 2 systems outside of the Unit 1 operating boundary that are documented In Unit 1 ASME N-5 packages.

Work will be performed in accordance with the Unit 1ASME Section XI requirements Configuration control will be under the Unit 2 programs, procedures, and processes.

Changes outside the Unit 1operating boundary will be ISBuedand Implemented by Bechtel using the Unit 2 Work Order process and EDCRs as needed.

Work will be planned and performed using the Unit 2 Work Order (WO) process which invokes the requirements of SPP-9.1, TI-100.014, and MMDP-10.

Bechtel Is designated as the Repair/Replacement organization In accordance with SPP-9.1, Section 3.5.1.

WO's will be reviewed and approved by Bechtel QA, Unit 1Welding and the ASME Section XI Coordlnltor.

Ii Planned WO', will be reviewed by the Unit 1ASME ANI!.

Work will be performed by Bechtel.

Quality Control inspections will be performed by Bechtel. and endorsed by Unit 2 TVA.

Non-destructive Examinations will be performed by Unit 2 TVA ISO/NDE for Section XI Repair/Replacement.

Radiation Protection and Site Support will be performed by TVA Unit 2 staff.

Completed WOts will be reviewed by the Unit 1ANti prior to closure.

Prior to closing the WO and SUbmitting it for ANII review, Bechtel will Issue a Unit 2 WO to punchllst and track to Section XI In-service Leak Test (ISLT).

WO's will be closed by Bechtel and Work Completion Statements (WCS) Issued.

The WCS will be processed and EDCR closed by Bechtel.

The EDCR closure package will reference the ISLTWO.

ISLT shall be performed during or before/after hydrostatic testing of Unit 2 systems in accordance with the Unit 2 WO that was issued at completion of the physical work.

After completion of the system hydro /ISl.T, the completed work will be documented on the Unit 1ASME NIS-1 and NISM2A forms.

TheUnit 11 Unit 2 Interface boundary will continue to be controlled per TI.12.0B, Control of Unit Interfaces. Revision of Unit IPs will be performed using the DeN procesl per SPP-9.3. Operations will isolate U2 components from U1, following Interface point removal, utilizing the SPP-10.2 clearance procesl.

Piping/components In these regions will be added to the Unit 2 ASME Section XI IS!

population prior to Unit 2 startup.

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Technical Positions Page 70 of 77 This document can be found in BSL (Business Support Library) file WBN, Unit 2-NGDC, TVA Unit 2, General Information, MOU-6.

Watts Bar Unit 1 and 2 Memorandum of Understanding ASME Section XI Interface r1 L)~~t'~ kn

'b}7A ~~

G.Ma~

.~

WBN Unit 1 Engineering Mgr

~ -l9:*oq Date Sherr A*~

?-l?~d'l WBN 2

-5 Group

~fitue. ~

~*tq.o1 WBN 2 Welding Engineer Date 8 )1 R Coordinator D e 1\\

..~c:ss c tJ0;(4- ~/f'lJ BN 1 Welding Engineer Date 3)~vld Wait tkaJ?7*¥ ttA5/oj WBN 1 ANII Date

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Drawing Reference List Page 71 of 77 SECTION 11.0 DRAWING REFERENCE LIST Some of the drawings will be included as the preservice inspections are completed and the drawings are updated.

FLOW DIAGRAMS Drawing Number Drawing Title (System)

Code Class 47W801-1 Main & Reheat Steam (1) 2 47W801-2 SG Blowdown (1) 2 47W803-1 Feedwater (3) 2 47W803-2 Auxiliary Feedwater (3) 2&3 47W803-3 Auxiliary Feedwater (3) 3 47W809-1 Chemical & Volume Control (62) 1,2&3 47W809-2 CVC & Boron Recovery (62) 2&3 47W809-3 CVC & Boron Recovery (62) 3 47W809-5 CVC & Boron Recovery (62) 3 47W809-7 Flood Mode Boration Makeup (84) 2&3 47W809-9 Chemical & Volume Control (62) 2 47W810-1 Residual Heat Removal (74) 1,2&3 47W811-1 Safety Injection (63) 1,2&3 47W812-1 Containment Spray (72) 2&3 47W813-1 Reactor Coolant (68) 1&2 47W814-2 Ice Condenser (61) 2 47W819-1 Primary Water (81) 2 47W830-1 Waste Disposal (77) 2 47W832-1 Raw Service Water & HPFP (25/26) 3 47W832-2 Raw Service Water & HPFP (25/26) 3 47W845-1 Essential Raw Cooling Water (67) 3 47W845-2 Essential Raw Cooling Water (67) 3 47W845-3 Essential Raw Cooling Water (67) 2&3 47W845-4 Essential Raw Cooling Water (67) 3 47W845-5 Essential Raw Cooling Water (67) 3 47W850-2 Fire Protection Raw Service Water (26) 3 47W851-1 Floor & Equipment Drains (77) 2&3 47W855-1 Fuel Pool Cooling & Cleaning (78)(62) 2&3 47W856-1 Demin Water & Cask Decon (59) 2 47W859-1 Component Cooling (70) 3 47W859-3 Component Cooling (70) 2&3 47W859-4 Component Cooling (70) 3 47W862-2 SG Wet Layup, Closed Recirculation Loop (41) 2 47W865-5 Air Conditioning Chilled Water (31) 2

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Drawing Reference List Page 72 of 77 COMPONENT LOCATIONS Drawing Number Drawing Title (System)

Code Class ISI-2001-W-01 MSS WELD LOCATIONS 2

ISI-2001-W-02 MSS WELD LOCATIONS 2

ISI-2001-W-03 MSS WELD LOCATIONS 2

ISI-2001-W-04 MSS WELD LOCATIONS 2

ISI-2062-W-01 CVCS WELD LOCATIONS 1

ISI-2062-W-02 CVCS WELD LOCATIONS 1

ISI-2062-W-03 CVCS WELD LOCATIONS 1

ISI-2062-W-04 CVCS WELD LOCATIONS 1

ISI-2062-W-05 CVCS WELD LOCATIONS 1

ISI-2062-W-06 CVCS WELD LOCATIONS 1

ISI-2063-W-01 SIS WELD LOCATIONS 2

ISI-2063-W-02 SIS WELD LOCATIONS 2

ISI-2063-W-03 SIS WELD LOCATIONS 2

ISI-2063-W-04 SIS WELD LOCATIONS 2

ISI-2063-W-05 SIS WELD LOCATIONS 2

ISI-2063-W-06 SIS WELD LOCATIONS 1

ISI-2063-W-07 SIS WELD LOCATIONS 1

ISI-2063-W-08 SIS WELD LOCATIONS 1

ISI-2063-W-09 SIS WELD LOCATIONS 1

ISI-2063-W-10 SIS WELD LOCATIONS 1

ISI-2063-W-11 SIS WELD LOCATIONS 1

ISI-2063-W-12 SIS WELD LOCATIONS 1

ISI-2063-W-13 SIS WELD LOCATIONS 1

ISI-2063-W-14 SIS WELD LOCATIONS 1

ISI-2063-W-15*

SIS WELD LOCATIONS 2

ISI-2063-W-16*

SIS WELD LOCATIONS 2

ISI-2063-W-17*

SIS WELD LOCATIONS 2

ISI-2063-W-18*

SIS WELD LOCATIONS 2

ISI-2063-W-19*

SIS WELD LOCATIONS 2

ISI-2063-W-20*

SIS WELD LOCATIONS 2

ISI-2063-W-21*

SIS WELD LOCATIONS 2

ISI-2063-W-22*

SIS WELD LOCATIONS 2

ISI-2063-W-23*

SIS WELD LOCATIONS 2

ISI-2063-W-24*

SIS WELD LOCATIONS 2

ISI-2063-W-25*

SIS WELD LOCATIONS 2

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Drawing Reference List Page 73 of 77 COMPONENT LOCATIONS Drawing Number Drawing Title (System)

Code Class ISI-2063-W-26*

SIS WELD LOCATIONS 2

ISI-2063-W-27*

SIS WELD LOCATIONS 2

ISI-2063-W-28*

SIS WELD LOCATIONS 2

ISI-2063-W-29*

SIS WELD LOCATIONS 2

ISI-2063-W-30*

SIS WELD LOCATIONS 2

ISI-2063-W-31*

SIS WELD LOCATIONS 2

ISI-2063-W-32*

SIS WELD LOCATIONS 2

ISI-2063-W-33*

SIS WELD LOCATIONS 2

ISI-2063-W-34*

SIS WELD LOCATIONS 2

ISI-2063-W-35*

SIS WELD LOCATIONS 2

ISI-2063-W-36*

SIS WELD LOCATIONS 2

ISI-2068-W-01 RCS WELD LOCATIONS 1

ISI-2068-W-02 RCS WELD LOCATIONS 1

ISI-2068-W-03 RCS WELD LOCATIONS 1

ISI-2068-W-04 RCS WELD LOCATIONS 1

ISI-2068-W-05 RCS WELD LOCATIONS 1

ISI-2068-W-06 RCS WELD LOCATIONS 1

ISI-2072B-E-01 CONT SPRAY HT EXCH WELD LOCATIONS 2

ISI-2072B-E-02 CONT SPRAY HT EXCH SUPPORT DETAILS 2&3 ISI-2074-W-01 RHRS WELD LOCATIONS 1&2 ISI-2074-W-02 RHRS WELD LOCATIONS 2

ISI-2074-W-03 RHRS WELD LOCATIONS 2

ISI-2074-W-04 RHRS WELD LOCATIONS 2

ISI-2074-W-05 RHRS WELD LOCATIONS 2

ISI-2074-W-06 RHRS WELD LOCATIONS 2

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Drawing Reference List Page 74 of 77 COMPONENT LOCATIONS Drawing Number Drawing Title (System)

Code Class ISI-2074-W-07 RHRS WELD LOCATIONS 2

ISI-2074-W-08 RHRS WELD LOCATIONS 1&2 ISI-2074-W-09 RHRS WELD LOCATIONS 1&2

  • Drawing developed (to be issued)

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Program Terms Page 75 of 77 SECTION 12.0 TERMS ACWS:

Air Conditioning Chilled Water System (31)

ALARA:

As Low As Reasonably Achievable ANII:

Authorized Nuclear Inservice Inspector ASME:

American Society of Mechanical Engineers AUG:

Augmented AFW:

Auxiliary Feedwater System (003B)

BC:

Branch Connection CC:

Code Case CFR:

Code of Federal Regulations CH:

Charging CHR:

Containment Heat Removal Circ:

Circumferential CL:

Cold Leg CCS:

Component Cooling System (70)

CRD:

Control Rod Drive CSS:

Containment Spray System (72)

CS:

Carbon Steel CSP:

Containment Spray Pump CVCS:

Chemical and Volume Control System (62)

DWG:

Drawing DM:

Dissimilar Metal E:

Equipment ECCS:

Emergency Core Cooling System ERCW:

Essential Raw Water Cooling System (67)

EL:

Elbow EPRI:

Electric Power research Institute ET:

Eddy Current Examination FW:

Feedwater FWS:

Feedwater System (03A)

FMBMS:

Flood Mode Boration Makeup System (84)

HL:

Hot Leg HPFP:

High Pressure Fire Protection (26)

Hx:

Heat Exchanger

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Program Terms Page 76 of 77 ICS:

Ice Condenser System (61)

IEP:

Inspection and Examination Procedures INPO:

Institute for Nuclear Power Operations ISI:

Inservice Inspection IWA:

Section XI General Requirements IWB:

Section XI Class 1 Components IWC:

Section XI Class 2 Components IWD:

Section XI Class 3 Components IWE:

Section XI Class MC Components IWF:

Section XI Class 1, 2, 3 & MC Component Supports IWL:

Section XI Class CC Components PSI:

Preservice Inspection MOU:

Memorandum of Understanding MSS:

Main Steam System (01)

MT:

Magnetic Particle Examination NDE:

Nondestructive Examination NRC:

Nuclear Regulatory Commission NGDC:

Nuclear Generation Development & Construction PP:

Project Procedure P:

Pipe PENT:

Penetration PSV:

Pressure Relief or Safety Valve PWR:

Pressurized Water Reactor PT:

Penetrant Examination PZR:

Pressurizer PCV:

Pressure Control Valve PWS:

Primary Water System (81)

R:

Reducer RC:

Reactor Coolant RCP:

Reactor Coolant Pump REV:

Revision RHR:

Residual Heat Removal RHRS:

Residual Heat Removal System (74)

RECIRC:

Recirculation RCS:

Reactor Coolant System (68)

RPV:

Reactor Pressure Vessel

NGDC PROJECT PROCEDURE WATTS BAR NUCLEAR PLANT UNIT 2 PRESERVICE INSPECTION PROGRAM PLAN WBN-2 PSI REVISION 3 Program Terms Page 77 of 77 RSW:

Raw Service Water (System 25)

RLV:

Relief Valve RT:

Radiograph Examination RX:

Reactor S:

Supports SCH:

Schedule SDCHX:

Shutdown Cooling Heat Exchanger SD:

Shutdown SER:

Safety Evaluation Report SG:

Steam Generator SGBD:

Steam Generator Blowdown (System 1 & 15)

SH:

Sheet SIS:

Safety Injection System (63)

SI:

Safety Injection SUR:

Surface Examination SFPC:

Spent Fuel Pit Cooling (System 84)

SS:

Stainless Steel SXI:

Section XI, Rules for Inservice Inspection Tee:

Tee TK:

Thickness Tech. Spec:

Technical Specification TRM:

Technical Requirements Manual TVA Tennessee Valley Authority UFSAR:

Updated Final Safety Analysis Report UHIS:

Upper Head Injection System (87)

UT:

Ultrasonic Examination VCT:

Volume Control Tank VOL:

Volumetric Examination VT:

Visual Examination VT-1:

Visual Examination for Detection of Surface Conditions VT-2:

Visual Examination for Evidence of Leakage VT-3:

Visual Examination for General Mechanical and Structural Condition VE:

Visual Examination (VT-2 Augmented Type)

WDS:

Waste Disposal System (77)

WBN:

Watts Bar Nuclear W:

Welds

ENCLOSURE 2 Tennessee Valley Authority Watts Bar Nuclear Plant - Unit 2 Exams Scheduled For Preservice Inspection (PSI)

ISO Program Manuals NDE Procedures Table of Contents

WATTS BAR NUCLEAR PLANT - UNIT 2 EXAMS SCHEDULED FOR Preservice Inspection (PSI)

Total Examinations:

1927 06/07/2010 Revision: draft TENNESSEE VALLEY AUTHORITY SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV W02-03 B1.11 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 1

RV W03-04 B1.11 B-A UT Vendor 173 8.621~

ISI-2068A-E-02 PSI 2

RV W04-05 B1.11 B-A UT Vendor 173 8.621~

ISI-2068A-E-02 PSI 3

RV W05-06 B1.11 B-A UT Vendor 173 10.983~

ISI-2068A-E-02 PSI 4

RV W01-02 B1.21 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 1

RV W09-10 B1.21 B-A UT N-UT-78 WB-51 173 7.300~

ISI-2068A-E-04 PSI 2

RV W2A B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 1

RV W2B B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 2

RV W2C B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 3

RV W2D B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 4

RV W2E B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 5

RV W2F B1.22 B-A UT Vendor 173 5.392~

ISI-2068A-E-02 PSI 6

RV W06-07 B1.30 B-A UT Vendor 173 10.983~

ISI-2068A-E-02 PSI 1

RV W08-09 B1.40 B-A MT N-MT-6 173 7.300~

ISI-2068A-E-04 PSI R-1023 1

RV W08-09 B1.40 B-A UT N-UT-19 WB-51 173 7.300~

ISI-2068A-E-04 PSI R-P1014 2

PZR WP-01 B2.11 B-B UT N-UT-19 WB-55 0

3.880 ISI-2068C-E-01 PSI 1

PZR WP-05 B2.11 B-B UT N-UT-19 WB-55 0

3.880 ISI-2068C-E-01 PSI 2

PZR WP-06 B2.12 B-B UT N-UT-19 WB-55 0

3.880 ISI-2068C-E-01 PSI 1

PZR WP-09 B2.12 B-B UT N-UT-19 WB-56 0

3.880 ISI-2068C-E-01 PSI 2

SG SG-1-2-1 B2.40 B-B UT N-UT-19 WB-57 135.88 5.430 ISI-2001-E-01 PSI 1

SG SG-1-2-2 B2.40 B-B UT N-UT-19 WB-57 135.88 5.430 ISI-2001-E-01 PSI 2

SG SG-1-2-3 B2.40 B-B UT N-UT-19 WB-57 135.88 5.410 ISI-2001-E-01 PSI 3

SG SG-1-2-4 B2.40 B-B UT N-UT-19 WB-57 135.88 5.410 ISI-2001-E-01 PSI 4

Page 1 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV N11-IR B3.100 B-D UT Vendor 29.75 NA ISI-2068A-E-03 PSI 1

RV N12-IR B3.100 B-D UT Vendor 29.75 NA ISI-2068A-E-03 PSI 2

RV N13-IR B3.100 B-D UT Vendor 29.75 NA ISI-2068A-E-03 PSI 3

RV N14-IR B3.100 B-D UT Vendor 29.75 NA ISI-2068A-E-03 PSI 4

RV N15-IR B3.100 B-D UT Vendor 31 NA ISI-2068A-E-03 PSI 5

RV N16-IR B3.100 B-D UT Vendor 31 NA ISI-2068A-E-03 PSI 6

RV N17-IR B3.100 B-D UT Vendor 31 NA ISI-2068A-E-03 PSI 7

RV N18-IR B3.100 B-D UT Vendor 31 NA ISI-2068A-E-03 PSI 8

PZR WP-10 B3.110 B-D UT N-UT-19 WB-55 14 3.350 ISI-2068C-E-01 PSI 1

PZR WP-11 B3.110 B-D UT N-UT-19 WB-55 4

2.850 ISI-2068C-E-01 PSI 2

PZR WP-12 B3.110 B-D UT N-UT-19 WB-55 6

2.850 ISI-2068C-E-01 PSI 3

PZR WP-13 B3.110 B-D UT N-UT-19 WB-55 6

2.850 ISI-2068C-E-01 PSI 4

PZR WP-14 B3.110 B-D UT N-UT-19 WB-55 6

2.850 ISI-2068C-E-01 PSI 5

PZR WP-15 B3.110 B-D UT N-UT-19 WB-55 6

2.850 ISI-2068C-E-01 PSI 6

PZR WP-10-IR B3.120 B-D UT N-UT-55 WB-77 14 3.350 ISI-2068C-E-01 PSI 1

PZR WP-11-IR B3.120 B-D UT N-UT-55 WB-77 4

2.850 ISI-2068C-E-01 PSI 2

PZR WP-12-IR B3.120 B-D UT N-UT-55 WB-77 6

2.850 ISI-2068C-E-01 PSI 3

PZR WP-13-IR B3.120 B-D UT N-UT-55 WB-77 6

2.850 ISI-2068C-E-01 PSI 4

PZR WP-14-IR B3.120 B-D UT N-UT-55 WB-77 6

2.850 ISI-2068C-E-01 PSI 5

PZR WP-15-IR B3.120 B-D UT N-UT-55 WB-77 6

2.850 ISI-2068C-E-01 PSI 6

SG SG-1-C-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 1

SG SG-1-H-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 2

SG SG-2-C-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 3

SG SG-2-H-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 4

SG SG-3-C-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 5

SG SG-3-H-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 6

SG SG-4-C-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 7

SG SG-4-H-IR B3.140 B-D VT-1 N-VT-1 31 NA ISI-2001-E-01 PSI 8

RV N11 B3.90 B-D UT Vendor 29.75 10.98 ISI-2068A-E-03 PSI 1

RV N12 B3.90 B-D UT Vendor 29.75 10.98 ISI-2068A-E-03 PSI 2

RV N13 B3.90 B-D UT Vendor 29.75 10.98 ISI-2068A-E-03 PSI 3

RV N14 B3.90 B-D UT Vendor 29.75 10.98 ISI-2068A-E-03 PSI 4

RV N15 B3.90 B-D UT Vendor 31 10.98 ISI-2068A-E-03 PSI 5

RV N16 B3.90 B-D UT Vendor 31 10.98 ISI-2068A-E-03 PSI 6

RV N17 B3.90 B-D UT Vendor 31 10.98 ISI-2068A-E-03 PSI 7

RV N18 B3.90 B-D UT Vendor 31 10.98 ISI-2068A-E-03 PSI 8

Page 2 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS N11-SE B5.10 B-F PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0018 1

RCS N11-SE B5.10 B-F UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 2

RCS N12-SE B5.10 B-F PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0001 3

RCS N12-SE B5.10 B-F UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 4

RCS N13-SE B5.10 B-F PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0005 5

RCS N13-SE B5.10 B-F UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 6

RCS N14-SE B5.10 B-F PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0009 7

RCS N14-SE B5.10 B-F UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 8

RCS N15-SE B5.10 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0015 9

RCS N15-SE B5.10 B-F UT Vendor 29 2.33 ISI-2068-W-01 PSI 10 RCS N16-SE B5.10 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0003 11 RCS N16-SE B5.10 B-F UT Vendor 29 2.33 ISI-2068-W-01 PSI 12 RCS N17-SE B5.10 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0002 13 RCS N17-SE B5.10 B-F UT Vendor 29 2.33 ISI-2068-W-01 PSI 14 RCS N18-SE B5.10 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0013 15 RCS N18-SE B5.10 B-F UT Vendor 29 2.33 ISI-2068-W-01 PSI 16 PZR WP-10-SE B5.40 B-F PT N-PT-9 14 1.500 ISI-2068-W-01 PSI 1

PZR WP-10-SE B5.40 B-F UT N-UT-82 14 1.500 ISI-2068-W-01 PSI 2

PZR WP-11-SE B5.40 B-F PT N-PT-9 4

0.620 ISI-2068-W-05 PSI 3

PZR WP-11-SE B5.40 B-F UT N-UT-82 4

0.620 ISI-2068-W-05 PSI 4

PZR WP-12-SE B5.40 B-F PT N-PT-9 6

1.150 ISI-2068-W-04 PSI 5

PZR WP-12-SE B5.40 B-F UT N-UT-82 6

1.150 ISI-2068-W-04 PSI 6

PZR WP-13-SE B5.40 B-F PT N-PT-9 6

1.150 ISI-2068-W-04 PSI 7

PZR WP-13-SE B5.40 B-F UT N-UT-82 6

1.150 ISI-2068-W-04 PSI 8

PZR WP-14-SE B5.40 B-F PT N-PT-9 6

1.150 ISI-2068-W-04 PSI 9

PZR WP-14-SE B5.40 B-F UT N-UT-82 6

1.150 ISI-2068-W-04 PSI 10 PZR WP-15-SE B5.40 B-F PT N-PT-9 6

1.150 ISI-2068-W-04 PSI 11 PZR WP-15-SE B5.40 B-F UT N-UT-82 6

1.150 ISI-2068-W-04 PSI 12 Page 3 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-E1-2-SE B5.70 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0139 1

RCS RCF-E1-2-SE B5.70 B-F UT Vendor 29 2.33 ISI-2068-W-01 PSI 2

RCS RCF-E2-2-SE B5.70 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI 3

RCS RCF-E2-2-SE B5.70 B-F UT N-UT-87 29 2.33 ISI-2068-W-01 PSI 4

RCS RCF-E3-2-SE B5.70 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI 5

RCS RCF-E3-2-SE B5.70 B-F UT N-UT-87 29 2.33 ISI-2068-W-01 PSI 6

RCS RCF-E4-2-SE B5.70 B-F PT N-PT-9 29 2.33 ISI-2068-W-01 PSI 7

RCS RCF-E4-2-SE B5.70 B-F UT N-UT-87 29 2.33 ISI-2068-W-01 PSI 8

RCS RCF-G1-1-SE B5.70 B-F PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0138 9

RCS RCF-G1-1-SE B5.70 B-F UT N-UT-87 31 2.48 ISI-2068-W-01 PSI 10 RCS RCF-G2-1-SE B5.70 B-F PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0148 11 RCS RCF-G2-1-SE B5.70 B-F UT N-UT-87 31 2.48 ISI-2068-W-01 PSI 12 RCS RCF-G3-1-SE B5.70 B-F PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 13 RCS RCF-G3-1-SE B5.70 B-F UT N-UT-87 31 2.48 ISI-2068-W-01 PSI 14 RCS RCF-G4-1-SE B5.70 B-F PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 15 RCS RCF-G4-1-SE B5.70 B-F UT N-UT-87 31 2.48 ISI-2068-W-01 PSI 16 Page 4 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVNUT-01 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 1

RV RVNUT-02 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 2

RV RVNUT-03 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 3

RV RVNUT-04 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 4

RV RVNUT-05 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 5

RV RVNUT-06 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 6

RV RVNUT-07 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 7

RV RVNUT-08 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 8

RV RVNUT-09 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 9

RV RVNUT-10 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 10 RV RVNUT-11 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 11 RV RVNUT-12 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 12 RV RVNUT-13 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 13 RV RVNUT-14 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 14 RV RVNUT-15 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 15 RV RVNUT-16 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 16 RV RVNUT-17 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 17 RV RVNUT-18 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 18 RV RVNUT-19 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 19 RV RVNUT-20 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 20 RV RVNUT-21 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 21 RV RVNUT-22 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 22 RV RVNUT-23 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 23 RV RVNUT-24 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 24 RV RVNUT-25 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 25 RV RVNUT-26 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 26 RV RVNUT-27 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 27 RV RVNUT-28 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 28 RV RVNUT-29 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 29 RV RVNUT-30 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 30 RV RVNUT-31 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 31 RV RVNUT-32 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 32 RV RVNUT-33 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 33 RV RVNUT-34 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 34 RV RVNUT-35 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 35 RV RVNUT-36 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 36 RV RVNUT-37 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 37 RV RVNUT-38 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 38 RV RVNUT-39 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 39 RV RVNUT-40 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 40 Page 5 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVNUT-41 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 41 RV RVNUT-42 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 42 RV RVNUT-43 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 43 RV RVNUT-44 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 44 RV RVNUT-45 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 45 RV RVNUT-46 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 46 RV RVNUT-47 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 47 RV RVNUT-48 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 48 RV RVNUT-49 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 49 RV RVNUT-50 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 50 RV RVNUT-51 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 51 RV RVNUT-52 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 52 RV RVNUT-53 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 53 RV RVNUT-54 B6.10 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 54 Page 6 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP1MFBLT-01 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 1

RCP RCP1MFBLT-02 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 2

RCP RCP1MFBLT-03 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 3

RCP RCP1MFBLT-04 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 4

RCP RCP1MFBLT-05 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 5

RCP RCP1MFBLT-06 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 6

RCP RCP1MFBLT-07 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 7

RCP RCP1MFBLT-08 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 8

RCP RCP1MFBLT-09 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 9

RCP RCP1MFBLT-10 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 10 RCP RCP1MFBLT-11 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 11 RCP RCP1MFBLT-12 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 12 RCP RCP1MFBLT-13 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 13 RCP RCP1MFBLT-14 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 14 RCP RCP1MFBLT-15 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 15 RCP RCP1MFBLT-16 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 16 RCP RCP1MFBLT-17 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 17 RCP RCP1MFBLT-18 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 18 RCP RCP1MFBLT-19 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 19 RCP RCP1MFBLT-20 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 20 RCP RCP1MFBLT-21 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 21 RCP RCP1MFBLT-22 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 22 RCP RCP1MFBLT-23 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 23 RCP RCP1MFBLT-24 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 24 RCP RCP2MFBLT-01 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 25 RCP RCP2MFBLT-02 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 26 RCP RCP2MFBLT-03 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 27 RCP RCP2MFBLT-04 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 28 RCP RCP2MFBLT-05 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 29 RCP RCP2MFBLT-06 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 30 RCP RCP2MFBLT-07 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 31 RCP RCP2MFBLT-08 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 32 RCP RCP2MFBLT-09 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 33 RCP RCP2MFBLT-10 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 34 RCP RCP2MFBLT-11 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 35 RCP RCP2MFBLT-12 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 36 RCP RCP2MFBLT-13 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 37 RCP RCP2MFBLT-14 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 38 RCP RCP2MFBLT-15 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 39 RCP RCP2MFBLT-16 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 40 Page 7 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP2MFBLT-17 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 41 RCP RCP2MFBLT-18 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 42 RCP RCP2MFBLT-19 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 43 RCP RCP2MFBLT-20 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 44 RCP RCP2MFBLT-21 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 45 RCP RCP2MFBLT-22 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 46 RCP RCP2MFBLT-23 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 47 RCP RCP2MFBLT-24 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 48 RCP RCP3MFBLT-01 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 49 RCP RCP3MFBLT-02 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 50 RCP RCP3MFBLT-03 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 51 RCP RCP3MFBLT-04 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 52 RCP RCP3MFBLT-05 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 53 RCP RCP3MFBLT-06 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 54 RCP RCP3MFBLT-07 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 55 RCP RCP3MFBLT-08 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 56 RCP RCP3MFBLT-09 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 57 RCP RCP3MFBLT-10 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 58 RCP RCP3MFBLT-11 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 59 RCP RCP3MFBLT-12 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 60 RCP RCP3MFBLT-13 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 61 RCP RCP3MFBLT-14 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 62 RCP RCP3MFBLT-15 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 63 RCP RCP3MFBLT-16 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 64 RCP RCP3MFBLT-17 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 65 RCP RCP3MFBLT-18 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 66 RCP RCP3MFBLT-19 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 67 RCP RCP3MFBLT-20 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 68 RCP RCP3MFBLT-21 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 69 RCP RCP3MFBLT-22 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 70 RCP RCP3MFBLT-23 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 71 RCP RCP3MFBLT-24 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 72 RCP RCP4MFBLT-01 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 73 RCP RCP4MFBLT-02 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 74 RCP RCP4MFBLT-03 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 75 RCP RCP4MFBLT-04 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 76 RCP RCP4MFBLT-05 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 77 RCP RCP4MFBLT-06 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 78 RCP RCP4MFBLT-07 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 79 RCP RCP4MFBLT-08 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 80 Page 8 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP4MFBLT-09 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 81 RCP RCP4MFBLT-10 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 82 RCP RCP4MFBLT-11 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 83 RCP RCP4MFBLT-12 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 84 RCP RCP4MFBLT-13 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 85 RCP RCP4MFBLT-14 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 86 RCP RCP4MFBLT-15 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 87 RCP RCP4MFBLT-16 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 88 RCP RCP4MFBLT-17 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 89 RCP RCP4MFBLT-18 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 90 RCP RCP4MFBLT-19 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 91 RCP RCP4MFBLT-20 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 92 RCP RCP4MFBLT-21 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 93 RCP RCP4MFBLT-22 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 94 RCP RCP4MFBLT-23 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 95 RCP RCP4MFBLT-24 B6.180 B-G-1 UT N-UT-67 WB-75 4.5"Dia 4.500 ISI-2068B-E-01 PSI 96 Page 9 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP1FLG B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 1

RCP RCP1MFSUR-01 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 2

RCP RCP1MFSUR-02 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 3

RCP RCP1MFSUR-03 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 4

RCP RCP1MFSUR-04 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 5

RCP RCP1MFSUR-05 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 6

RCP RCP1MFSUR-06 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 7

RCP RCP1MFSUR-07 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 8

RCP RCP1MFSUR-08 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 9

RCP RCP1MFSUR-09 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 10 RCP RCP1MFSUR-10 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 11 RCP RCP1MFSUR-11 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 12 RCP RCP1MFSUR-12 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 13 RCP RCP1MFSUR-13 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 14 RCP RCP1MFSUR-14 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 15 RCP RCP1MFSUR-15 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 16 RCP RCP1MFSUR-16 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 17 RCP RCP1MFSUR-17 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 18 RCP RCP1MFSUR-18 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 19 RCP RCP1MFSUR-19 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 20 RCP RCP1MFSUR-20 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 21 RCP RCP1MFSUR-21 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 22 RCP RCP1MFSUR-22 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 23 RCP RCP1MFSUR-23 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 24 RCP RCP1MFSUR-24 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 25 RCP RCP2FLG B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 26 RCP RCP2MFSUR-01 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 27 RCP RCP2MFSUR-02 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 28 RCP RCP2MFSUR-03 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 29 RCP RCP2MFSUR-04 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 30 RCP RCP2MFSUR-05 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 31 RCP RCP2MFSUR-06 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 32 RCP RCP2MFSUR-07 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 33 RCP RCP2MFSUR-08 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 34 RCP RCP2MFSUR-09 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 35 RCP RCP2MFSUR-10 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 36 RCP RCP2MFSUR-11 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 37 RCP RCP2MFSUR-12 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 38 RCP RCP2MFSUR-13 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 39 RCP RCP2MFSUR-14 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 40 Page 10 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP2MFSUR-15 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 41 RCP RCP2MFSUR-16 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 42 RCP RCP2MFSUR-17 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 43 RCP RCP2MFSUR-18 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 44 RCP RCP2MFSUR-19 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 45 RCP RCP2MFSUR-20 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 46 RCP RCP2MFSUR-21 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 47 RCP RCP2MFSUR-22 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 48 RCP RCP2MFSUR-23 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 49 RCP RCP2MFSUR-24 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 50 RCP RCP3FLG B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 SCRATC R-P0992 51 RCP RCP3MFSUR-01 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 52 RCP RCP3MFSUR-02 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 53 RCP RCP3MFSUR-03 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 54 RCP RCP3MFSUR-04 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 55 RCP RCP3MFSUR-05 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 56 RCP RCP3MFSUR-06 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 57 RCP RCP3MFSUR-07 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 58 RCP RCP3MFSUR-08 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 59 RCP RCP3MFSUR-09 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 60 RCP RCP3MFSUR-10 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 61 RCP RCP3MFSUR-11 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 62 RCP RCP3MFSUR-12 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 63 RCP RCP3MFSUR-13 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 64 RCP RCP3MFSUR-14 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 65 RCP RCP3MFSUR-15 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 66 RCP RCP3MFSUR-16 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 67 RCP RCP3MFSUR-17 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 68 RCP RCP3MFSUR-18 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 69 RCP RCP3MFSUR-19 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 70 RCP RCP3MFSUR-20 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 71 RCP RCP3MFSUR-21 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 72 RCP RCP3MFSUR-22 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 73 RCP RCP3MFSUR-23 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 74 RCP RCP3MFSUR-24 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 75 RCP RCP4FLG B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 76 RCP RCP4MFSUR-01 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 77 RCP RCP4MFSUR-02 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 78 RCP RCP4MFSUR-03 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 79 RCP RCP4MFSUR-04 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 80 Page 11 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCP RCP4MFSUR-05 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 81 RCP RCP4MFSUR-06 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 82 RCP RCP4MFSUR-07 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 83 RCP RCP4MFSUR-08 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 84 RCP RCP4MFSUR-09 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 85 RCP RCP4MFSUR-10 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 86 RCP RCP4MFSUR-11 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 87 RCP RCP4MFSUR-12 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 88 RCP RCP4MFSUR-13 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 89 RCP RCP4MFSUR-14 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 90 RCP RCP4MFSUR-15 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 91 RCP RCP4MFSUR-16 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 92 RCP RCP4MFSUR-17 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 93 RCP RCP4MFSUR-18 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 94 RCP RCP4MFSUR-19 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 95 RCP RCP4MFSUR-20 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 96 RCP RCP4MFSUR-21 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 97 RCP RCP4MFSUR-22 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 98 RCP RCP4MFSUR-23 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 99 RCP RCP4MFSUR-24 B6.190 B-G-1 VT-1 N-VT-1 68.5"Dia ISI-2068B-E-01 PSI 100 Page 12 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVSTUD-01 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 1

RV RVSTUD-02 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 2

RV RVSTUD-03 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 3

RV RVSTUD-04 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 4

RV RVSTUD-05 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 5

RV RVSTUD-06 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 6

RV RVSTUD-07 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 7

RV RVSTUD-08 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 8

RV RVSTUD-09 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 9

RV RVSTUD-10 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 10 RV RVSTUD-11 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 11 RV RVSTUD-12 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 12 RV RVSTUD-13 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 13 RV RVSTUD-14 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 14 RV RVSTUD-15 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 15 RV RVSTUD-16 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 16 RV RVSTUD-17 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 17 RV RVSTUD-18 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 18 RV RVSTUD-19 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 19 RV RVSTUD-20 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 20 RV RVSTUD-21 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 21 RV RVSTUD-22 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 22 RV RVSTUD-23 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 23 RV RVSTUD-24 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 24 RV RVSTUD-25 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 25 RV RVSTUD-26 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 26 RV RVSTUD-27 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 27 RV RVSTUD-28 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 28 RV RVSTUD-29 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 29 RV RVSTUD-30 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 30 RV RVSTUD-31 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 31 RV RVSTUD-32 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 32 RV RVSTUD-33 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 33 RV RVSTUD-34 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 34 RV RVSTUD-35 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 35 RV RVSTUD-36 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 36 RV RVSTUD-37 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 37 RV RVSTUD-38 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 38 RV RVSTUD-39 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 39 RV RVSTUD-40 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 40 Page 13 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVSTUD-41 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 41 RV RVSTUD-42 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 42 RV RVSTUD-43 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 43 RV RVSTUD-44 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 44 RV RVSTUD-45 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 45 RV RVSTUD-46 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 46 RV RVSTUD-47 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 47 RV RVSTUD-48 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 48 RV RVSTUD-49 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 49 RV RVSTUD-50 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 50 RV RVSTUD-51 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 51 RV RVSTUD-52 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 52 RV RVSTUD-53 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 53 RV RVSTUD-54 B6.20 B-G-1 UT N-UT-67 WB-76 7"Dia 7.000 ISI-2068A-E-09 PSI 54 Page 14 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVLIG-01 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 1

RV RVLIG-02 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 2

RV RVLIG-03 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 3

RV RVLIG-04 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 4

RV RVLIG-05 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 5

RV RVLIG-06 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 6

RV RVLIG-07 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 7

RV RVLIG-08 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 8

RV RVLIG-09 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 9

RV RVLIG-10 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 10 RV RVLIG-11 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 11 RV RVLIG-12 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 12 RV RVLIG-13 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 13 RV RVLIG-14 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 14 RV RVLIG-15 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 15 RV RVLIG-16 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 16 RV RVLIG-17 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 17 RV RVLIG-18 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 18 RV RVLIG-19 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 19 RV RVLIG-20 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 20 RV RVLIG-21 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 21 RV RVLIG-22 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 22 RV RVLIG-23 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 23 RV RVLIG-24 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 24 RV RVLIG-25 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 25 RV RVLIG-26 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 26 RV RVLIG-27 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 27 RV RVLIG-28 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 28 RV RVLIG-29 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 29 RV RVLIG-30 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 30 RV RVLIG-31 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 31 RV RVLIG-32 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 32 RV RVLIG-33 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 33 RV RVLIG-34 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 34 RV RVLIG-35 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 35 RV RVLIG-36 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 36 RV RVLIG-37 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 37 RV RVLIG-38 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 38 RV RVLIG-39 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 39 RV RVLIG-40 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 40 Page 15 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVLIG-41 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 41 RV RVLIG-42 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 42 RV RVLIG-43 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 43 RV RVLIG-44 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 44 RV RVLIG-45 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 45 RV RVLIG-46 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 46 RV RVLIG-47 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 47 RV RVLIG-48 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 48 RV RVLIG-49 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 49 RV RVLIG-50 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 50 RV RVLIG-51 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 51 RV RVLIG-52 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 52 RV RVLIG-53 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 53 RV RVLIG-54 B6.40 B-G-1 UT N-UT-67 WB-76 7"Dia 0.000 ISI-2068A-E-09 PSI 54 Page 16 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVWASHER-01 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 1

RV RVWASHER-02 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 2

RV RVWASHER-03 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 3

RV RVWASHER-04 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 4

RV RVWASHER-05 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 5

RV RVWASHER-06 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 6

RV RVWASHER-07 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 7

RV RVWASHER-08 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 8

RV RVWASHER-09 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 9

RV RVWASHER-10 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 10 RV RVWASHER-11 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 11 RV RVWASHER-12 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 12 RV RVWASHER-13 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 13 RV RVWASHER-14 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 14 RV RVWASHER-15 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 15 RV RVWASHER-16 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 16 RV RVWASHER-17 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 17 RV RVWASHER-18 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 18 RV RVWASHER-19 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 19 RV RVWASHER-20 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 20 RV RVWASHER-21 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 21 RV RVWASHER-22 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 22 RV RVWASHER-23 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 23 RV RVWASHER-24 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 24 RV RVWASHER-25 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 25 RV RVWASHER-26 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 26 RV RVWASHER-27 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 27 RV RVWASHER-28 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 28 RV RVWASHER-29 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 29 RV RVWASHER-30 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 30 RV RVWASHER-31 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 31 RV RVWASHER-32 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 32 RV RVWASHER-33 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 33 RV RVWASHER-34 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 34 RV RVWASHER-35 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 35 RV RVWASHER-36 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 36 RV RVWASHER-37 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 37 RV RVWASHER-38 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 38 RV RVWASHER-39 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 39 RV RVWASHER-40 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 40 Page 17 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV RVWASHER-41 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 41 RV RVWASHER-42 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 42 RV RVWASHER-43 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 43 RV RVWASHER-44 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 44 RV RVWASHER-45 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 45 RV RVWASHER-46 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 46 RV RVWASHER-47 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 47 RV RVWASHER-48 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 48 RV RVWASHER-49 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 49 RV RVWASHER-50 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 50 RV RVWASHER-51 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 51 RV RVWASHER-52 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 52 RV RVWASHER-53 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 53 RV RVWASHER-54 B6.50 B-G-1 VT-1 N-VT-1 7"Dia 7.000 ISI-2068A-E-09 PSI 54 PZR MWC-BOLT-01 B7.20 B-G-2 VT-1 N-VT-1 16" manway 1.880 ISI-2068C-E-02 PSI 1

PZR MWC-BOLT-01-16 B7.20 B-G-2 VT-1 N-VT-1 16" manway 1.880 ISI-2068C-E-02 PSI 2

PZR MWC-BOLT-02 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 3

PZR MWC-BOLT-03 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 4

PZR MWC-BOLT-04 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 5

PZR MWC-BOLT-05 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 6

PZR MWC-BOLT-06 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 7

PZR MWC-BOLT-07 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 8

PZR MWC-BOLT-08 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 9

PZR MWC-BOLT-09 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 10 PZR MWC-BOLT-10 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 11 PZR MWC-BOLT-11 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 12 PZR MWC-BOLT-12 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 13 PZR MWC-BOLT-13 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 14 PZR MWC-BOLT-14 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 15 PZR MWC-BOLT-15 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 16 PZR MWC-BOLT-16 B7.20 B-G-2 VT-1 N-VT-1 9.00 1.880 ISI-2068C-E-02 PSI 17 Page 18 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SG MWCB-2-1-01-16-H B7.30 B-G-2 VT-1 N-VT-1 1.88 1.880 ISI-2001-E-02 PSI 1

SG MWCB-2-1-01-20-C B7.30 B-G-2 VT-1 N-VT-1 1.25 1.880 ISI-2001-E-02 PSI 2

SG MWCB-2-2-01-16-H B7.30 B-G-2 VT-1 N-VT-1 1.88 1.880 ISI-2001-E-02 PSI 3

SG MWCB-2-2-01-20-C B7.30 B-G-2 VT-1 N-VT-1 1.25 1.880 ISI-2001-E-02 PSI 4

SG MWCB-2-3-01-16-H B7.30 B-G-2 VT-1 N-VT-1 1.88 1.880 ISI-2001-E-02 PSI 5

SG MWCB-2-3-01-20-C B7.30 B-G-2 VT-1 N-VT-1 1.25 1.880 ISI-2001-E-02 PSI 6

SG MWCB-2-4-01-16-H B7.30 B-G-2 VT-1 N-VT-1 1.88 1.880 ISI-2001-E-02 PSI 7

SG MWCB-2-4-01-20-C B7.30 B-G-2 VT-1 N-VT-1 1.25 1.880 ISI-2001-E-02 PSI 8

RCS 68-563-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2068-W-04 PSI 1

RCS 68-564-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2068-W-04 PSI 2

RCS 68-565-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2068-W-04 PSI 3

RHRS 63-640-BC B7.70 B-G-2 VT-1 N-VT-1 8

0.906 ISI-2074-W-08 PSI 1

RHRS 63-641-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2074-W-08 PSI 2

RHRS 63-643-BC B7.70 B-G-2 VT-1 N-VT-1 8

0.906 ISI-2074-W-09 PSI R-P1065 3

RHRS 63-644-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2074-W-09 PSI 4

RHRS 74-001-BC B7.70 B-G-2 VT-1 N-VT-1 14 1.250 ISI-2074-W-01 PSI 5

RHRS 74-002-BC B7.70 B-G-2 VT-1 N-VT-1 14 1.250 ISI-2074-W-01 PSI 6

RHRS 74-008-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2074-W-01 PSI 7

RHRS 74-009-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2074-W-01 PSI 8

SIS 63-067-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-08 PSI 1

SIS 63-080-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-07 PSI 2

SIS 63-098-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-06 PSI 3

SIS 63-118-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-09 PSI 4

SIS 63-558-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-10 PSI 5

SIS 63-559-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-10 PSI 6

SIS 63-560-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-09 PSI 7

SIS 63-561-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-06 PSI 8

SIS 63-562-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-07 PSI 9

SIS 63-563-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-08 PSI 10 SIS 63-622-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-09 PSI R-P1069 11 SIS 63-623-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-06 PSI R-P1066 12 SIS 63-624-BC B7.70 B-G-2 VT-1 N-VT-1 10 1.000 ISI-2063-W-07 PSI 13 SIS 63-625-BC B7.70 B-G-2 VT-1 N-VT-1 10 0.719 ISI-2063-W-08 PSI R-P1068 14 SIS 63-632-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-06 PSI R-P1056 15 SIS 63-633-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-09 PSI 16 SIS 63-634-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-07 PSI 17 SIS 63-635-BC B7.70 B-G-2 VT-1 N-VT-1 6

0.719 ISI-2063-W-08 PSI 18 Page 19 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS 2-087B-W001-01 B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI 1

RCS 2-087B-W001-01 B9.11 B-J UT N-UT-64 ALT-SS 6.28 0.640 ISI-2068A-E-06 PSI 2

RCS 2-087B-W001-02 B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI 3

RCS 2-087B-W001-02 B9.11 B-J UT N-UT-64 ALT-SS 6.28 0.640 ISI-2068A-E-06 PSI 4

RCS 2-087B-W001-03 B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI 5

RCS 2-087B-W001-03 B9.11 B-J UT N-UT-64 ALT-SS 6.28 0.640 ISI-2068A-E-06 PSI 6

RCS 2-087B-W001-04 B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI 7

RCS 2-087B-W001-04 B9.11 B-J UT N-UT-64 ALT-SS 6.28 0.640 ISI-2068A-E-06 PSI 8

RCS RCF-C1-1 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0008 9

RCS RCF-C1-1 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI 10 RCS RCF-C1-2 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI 11 RCS RCF-C1-2 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI 12 RCS RCF-C2-1 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0019 13 RCS RCF-C2-1 B9.11 B-J UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 14 RCS RCF-C2-2 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0144 15 RCS RCF-C2-2 B9.11 B-J UT N-UT-33 WB-60 27.5 2.21 ISI-2068-W-01 PSI R-P0147 16 RCS RCF-C3-1 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0011 17 RCS RCF-C3-1 B9.11 B-J UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 18 RCS RCF-C3-2 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0133 19 RCS RCF-C3-2 B9.11 B-J UT N-UT-33 WB-60 27.5 2.21 ISI-2068-W-01 PSI R-P0149 20 RCS RCF-C4-1 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0006 21 RCS RCF-C4-1 B9.11 B-J UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 22 RCS RCF-C4-2 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI 23 RCS RCF-C4-2 B9.11 B-J UT Vendor 27.5 2.21 ISI-2068-W-01 PSI 24 RCS RCF-D144-01 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0214 25 RCS RCF-D144-01 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0243 26 RCS RCF-D144-01A B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 27 RCS RCF-D144-01A B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 28 RCS RCF-D144-01B B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0210 29 RCS RCF-D144-01B B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0251 30 RCS RCF-D144-01D B9.11 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI 31 RCS RCF-D144-01D B9.11 B-J UT N-UT-64 WB-83 3

0.438 ISI-2068-W-04 PSI 32 RCS RCF-D144-01E B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 33 RCS RCF-D144-01E B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 34 RCS RCF-D144-01F B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0215 35 RCS RCF-D144-01F B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0244 36 RCS RCF-D144-10 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0220 37 RCS RCF-D144-10 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0250 38 RCS RCF-D144-11 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0240 39 RCS RCF-D144-11 B9.11 B-J UT N-UT-64 ALT SS 6

0.719 ISI-2068-W-04 PSI 40 Page 20 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-D144-12 B9.11 B-J PT N-PT-9 NBA 6

0.719 ISI-2068-W-04 PSI R-P0235 41 RCS RCF-D144-12 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0263 42 RCS RCF-D145-01 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0172 43 RCS RCF-D145-01 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0195 44 RCS RCF-D145-02 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0168 45 RCS RCF-D145-02 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0191 46 RCS RCF-D145-02A B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 47 RCS RCF-D145-02A B9.11 B-J UT N-UT-64 ALT-SS 4

0.531 ISI-2068-W-05 PSI 48 RCS RCF-D145-02B B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0169 49 RCS RCF-D145-02B B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0225 50 RCS RCF-D145-03 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 51 RCS RCF-D145-03 B9.11 B-J UT N-UT-64 ALT-SS 4

0.531 ISI-2068-W-05 PSI 52 RCS RCF-D145-04 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0182 53 RCS RCF-D145-04 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0224 54 RCS RCF-D145-05 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0181 55 RCS RCF-D145-05 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0228 56 RCS RCF-D145-05A B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0177 57 RCS RCF-D145-05A B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0199 58 RCS RCF-D145-05B B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0180 59 RCS RCF-D145-05B B9.11 B-J UT N-UT-84 ALT SS 6

0.719 ISI-2068-W-05 PSI R-P0213 60 RCS RCF-D145-05C B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0178 61 RCS RCF-D145-05C B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0227 62 RCS RCF-D145-05D B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 63 RCS RCF-D145-05D B9.11 B-J UT N-UT-64 ALT-SS 4

0.531 ISI-2068-W-05 PSI 64 RCS RCF-D145-05E B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0175 65 RCS RCF-D145-05E B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0200 66 RCS RCF-D145-06 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0176 67 RCS RCF-D145-06 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0201 68 RCS RCF-D145-06A B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0174 69 RCS RCF-D145-06A B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0202 70 RCS RCF-D145-07 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0229 71 RCS RCF-D145-07 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0242 72 RCS RCF-D145-07A B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0230 73 RCS RCF-D145-07A B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0241 74 RCS RCF-D145-07B B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0231 75 RCS RCF-D145-07B B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0246 76 RCS RCF-D145-07C B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI 77 RCS RCF-D145-07C B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-05 PSI 78 RCS RCF-D145-07D B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-05 PSI R-P0236 79 RCS RCF-D145-07D B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2068-W-05 PSI R-P0245 80 Page 21 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-D145-08 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0179 81 RCS RCF-D145-08 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0226 82 RCS RCF-D145-09 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 83 RCS RCF-D145-09 B9.11 B-J UT N-UT-64 ALT-SS 4

0.531 ISI-2068-W-05 PSI 84 RCS RCF-D145-10 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0158 85 RCS RCF-D145-10 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0188 86 RCS RCF-D145-10A B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0157 87 RCS RCF-D145-10A B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0192 88 RCS RCF-D145-11 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0166 89 RCS RCF-D145-11 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0189 90 RCS RCF-D145-12 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0164 91 RCS RCF-D145-12 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0183 92 RCS RCF-D145-13 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0160 93 RCS RCF-D145-13 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0198 94 RCS RCF-D145-14 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0171 95 RCS RCF-D145-14 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0197 96 RCS RCF-E1-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0004 97 RCS RCF-E1-1 B9.11 B-J UT Vendor 29 2.33 ISI-2068-W-01 PSI 98 RCS RCF-E2-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0016 99 RCS RCF-E2-1 B9.11 B-J UT Vendor 29 2.33 ISI-2068-W-01 PSI 100 RCS RCF-E3-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0012 101 RCS RCF-E3-1 B9.11 B-J UT Vendor 29 2.33 ISI-2068-W-01 PSI 102 RCS RCF-E4-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0007 103 RCS RCF-E4-1 B9.11 B-J UT Vendor 29 2.33 ISI-2068-W-01 PSI 104 RCS RCF-G1-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0137 105 RCS RCF-G1-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0146 106 RCS RCF-G1-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0109 107 RCS RCF-G1-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0118 108 RCS RCF-G1-4 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0145 109 RCS RCF-G1-4 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0152 110 RCS RCF-G2-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0141 111 RCS RCF-G2-2 B9.11 B-J UT N-UT-33 WB-59 31 2.48 ISI-2068-W-01 PSI R-P0154 112 RCS RCF-G2-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0127 113 RCS RCF-G2-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0140 114 RCS RCF-G2-4 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0143 115 RCS RCF-G2-4 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0156 116 RCS RCF-G3-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 117 RCS RCF-G3-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 118 RCS RCF-G3-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0124 119 RCS RCF-G3-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0129 120 Page 22 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-G3-4 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0131 121 RCS RCF-G3-4 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0150 122 RCS RCF-G4-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 123 RCS RCF-G4-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 124 RCS RCF-G4-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0122 125 RCS RCF-G4-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0130 126 RCS RCF-G4-4 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0132 127 RCS RCF-G4-4 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0155 128 RCS RCF-I2-3 B9.11 B-J PT N-PT-9 14 1.406 ISI-2068-W-01 PSI 129 RCS RCF-I2-3 B9.11 B-J UT N-UT-64 ALT-SS 14 1.406 ISI-2068-W-01 PSI 130 RCS RCF-I2-4 B9.11 B-J PT N-PT-9 14 1.406 ISI-2068-W-01 PSI 131 RCS RCF-I2-4 B9.11 B-J UT N-UT-64 ALT-SS 14 1.406 ISI-2068-W-01 PSI 132 RCS RCF-I2-5 B9.11 B-J PT N-PT-9 14" 1.406" ISI-2068-W-01 PSI R-P0827 133 RCS RCF-I2-5 B9.11 B-J UT N-UT-64 WB-83 14" 1.406" ISI-2068-W-01 PSI R-P0828 134 RCS RCS-002 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0211 135 RCS RCS-002 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0252 136 RCS RCS-005 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0239 137 RCS RCS-005 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0253 138 RCS RCS-006 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0238 139 RCS RCS-006 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0254 140 RCS RCS-007 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0237 141 RCS RCS-007 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0255 142 RCS RCS-008 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 143 RCS RCS-008 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 144 RCS RCS-009 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 145 RCS RCS-009 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 146 RCS RCS-010 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 147 RCS RCS-010 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 148 RCS RCS-011 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 149 RCS RCS-011 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 150 RCS RCS-012 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0234 151 RCS RCS-012 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0260 152 RCS RCS-013 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0233 153 RCS RCS-013 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0261 154 RCS RCS-014 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0232 155 RCS RCS-014 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0262 156 RCS RCS-015 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 157 RCS RCS-015 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 158 RCS RCS-016 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 159 RCS RCS-016 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 160 Page 23 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCS-017 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 161 RCS RCS-017 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 162 RCS RCS-018 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI 163 RCS RCS-018 B9.11 B-J UT N-UT-64 ALT-SS 6

0.719 ISI-2068-W-04 PSI 164 RCS RCS-019 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0223 165 RCS RCS-019 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0249 166 RCS RCS-020 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0222 167 RCS RCS-020 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0247 168 RCS RCS-021 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0221 169 RCS RCS-021 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0248 170 RCS RCS-022 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0216 171 RCS RCS-022 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0256 172 RCS RCS-023 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0217 173 RCS RCS-023 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0257 174 RCS RCS-024 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0218 175 RCS RCS-024 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0259 176 RCS RCS-025 B9.11 B-J PT N-PT-9 6

0.719 ISI-2068-W-04 PSI R-P0219 177 RCS RCS-025 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2068-W-04 PSI R-P0258 178 RCS RCS-026 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0159 179 RCS RCS-026 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0185 180 RCS RCS-027 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0163 181 RCS RCS-027 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0184 182 RCS RCS-028 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0165 183 RCS RCS-028 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0193 184 RCS RCS-030 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 185 RCS RCS-030 B9.11 B-J UT N-UT-64 ALT-SS 4

0.531 ISI-2068-W-05 PSI 186 RCS RCS-032 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0170 187 RCS RCS-032 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0194 188 RCS RCS-033 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0173 189 RCS RCS-033 B9.11 B-J UT N-UT-64 ALT SS 4

0.531 ISI-2068-W-05 PSI R-P0186 190 RCS RCS-034 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0167 191 RCS RCS-034 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0196 192 RCS RCS-036 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0161 193 RCS RCS-036 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0187 194 RCS RCS-037 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI R-P0162 195 RCS RCS-037 B9.11 B-J UT N-UT-64 WB-83 4

0.531 ISI-2068-W-05 PSI R-P0190 196 RCS RCS-038 B9.11 B-J PT N-PT-9 4

0.531 ISI-2068-W-05 PSI 197 RCS RCS-038 B9.11 B-J UT N-PT-9 ALT-SS 4

0.531 ISI-2068-W-05 PSI 198 RCS RCS-1-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0112 199 RCS RCS-1-1 B9.11 B-J UT N-UT-33 WB-60 29 2.33 ISI-2068-W-01 PSI R-P0134 200 Page 24 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCS-1-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 201 RCS RCS-1-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 202 RCS RCS-1-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0110 203 RCS RCS-1-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0117 204 RCS RCS-1-4 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0020 205 RCS RCS-1-4 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI R-P0082 206 RCS RCS-2-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0120 207 RCS RCS-2-1 B9.11 B-J UT N-UT-33 WB-60 29 2.33 ISI-2068-W-01 PSI R-P0136 208 RCS RCS-2-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0142 209 RCS RCS-2-2 B9.11 B-J UT N-UT-33 WB-59 31 2.48 ISI-2068-W-01 PSI R-P0153 210 RCS RCS-2-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0126 211 RCS RCS-2-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 212 RCS RCS-2-4 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0017 213 RCS RCS-2-4 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI R-P0083 214 RCS RCS-3-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0121 215 RCS RCS-3-1 B9.11 B-J UT N-UT-33 WB-60 29 2.33 ISI-2068-W-01 PSI R-P0135 216 RCS RCS-3-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 217 RCS RCS-3-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 218 RCS RCS-3-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0125 219 RCS RCS-3-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0128 220 RCS RCS-3-4 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0010 221 RCS RCS-3-4 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI R-P0084 222 RCS RCS-4-1 B9.11 B-J PT N-PT-9 29 2.33 ISI-2068-W-01 PSI R-P0115 223 RCS RCS-4-1 B9.11 B-J UT N-UT-33 WB-60 29 2.33 ISI-2068-W-01 PSI R-P0119 224 RCS RCS-4-2 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI 225 RCS RCS-4-2 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI 226 RCS RCS-4-3 B9.11 B-J PT N-PT-9 31 2.48 ISI-2068-W-01 PSI R-P0114 227 RCS RCS-4-3 B9.11 B-J UT N-UT-33 WB-60 31 2.48 ISI-2068-W-01 PSI R-P0116 228 RCS RCS-4-4 B9.11 B-J PT N-PT-9 27.5 2.21 ISI-2068-W-01 PSI R-P0014 229 RCS RCS-4-4 B9.11 B-J UT N-UT-33 WB-59 27.5 2.21 ISI-2068-W-01 PSI R-P0081 230 RCS RCS-P-2 B9.11 B-J PT N-PT-9 14 1.406 ISI-2068-W-01 PSI 231 RCS RCS-P-2 B9.11 B-J UT N-UT-64 ALT SS 14 1.406 ISI-2068-W-01 PSI 232 RCS RCS-P-3 B9.11 B-J PT N-PT-9 14 1.406 ISI-2068-W-01 PSI R-P0151 233 RCS RCS-P-3 B9.11 B-J UT N-UT-64 ALT SS 14 1.406 ISI-2068-W-01 PSI 234 RCS UPIAH-2/3A B9.11 B-J PT N-PT-9 6.5 0.880 ISI-2068A-E-06 PSI R-P1009 235 RCS UPIAH-2/3A B9.11 B-J UT N-UT-87 WB-71

& WB72 6.5 0.880 ISI-2068A-E-06 PSI 236 RCS UPIAH-2/3B B9.11 B-J PT N-PT-9 6.5 0.880 ISI-2068A-E-06 PSI R-P1010 237 RCS UPIAH-2/3B B9.11 B-J UT N-UT-87 WB-71

& WB-72 6.5 0.880 ISI-2068A-E-06 PSI 238 Page 25 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS UPIAH-2/3C B9.11 B-J PT N-PT-9 6.5 0.880 ISI-2068A-E-06 PSI R-P1011 239 RCS UPIAH-2/3C B9.11 B-J UT N-UT-87 WB-71

& WB-72 6.5 0.880 ISI-2068A-E-06 PSI 240 RCS UPIAH-2/3D B9.11 B-J PT N-PT-9 6.5 0.880 ISI-2068A-E-06 PSI R-P1008 241 RCS UPIAH-2/3D B9.11 B-J UT N-UT-87 WB-71

& WB-72 6.5 0.880 ISI-2068A-E-06 PSI 242 RCS UPIAH-4A B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI R-P1005 243 RCS UPIAH-4A B9.11 B-J UT N-UT-87 WB-72 6.28 0.640 ISI-2068A-E-06 PSI R-P1024 244 RCS UPIAH-4B B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI R-P1006 245 RCS UPIAH-4B B9.11 B-J UT N-UT-87 WB-72 6.28 0.640 ISI-2068A-E-06 PSI R-P1025 246 RCS UPIAH-4C B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI R-P1012 247 RCS UPIAH-4C B9.11 B-J UT N-UT-87 WB-72 6.28 0.640 ISI-2068A-E-06 PSI R-P1026 248 RCS UPIAH-4D B9.11 B-J PT N-PT-9 6.28 0.640 ISI-2068A-E-06 PSI R-P1007 249 RCS UPIAH-4D B9.11 B-J UT N-UT-87 WB-72 6.28 0.640 ISI-2068A-E-06 PSI R-P1027 250 Page 26 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRF-D031-01 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0764 1

RHRS RHRF-D031-01 B9.11 B-J UT N-UT-64 SQ-116 14 1.250 ISI-2074-W-01 PSI R-P0765 2

RHRS RHRF-D031-02 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0653 3

RHRS RHRF-D031-02 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0691 4

RHRS RHRF-D031-03 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 5

RHRS RHRF-D031-03 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 6

RHRS RHRF-D031-04 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0684 7

RHRS RHRF-D031-04 B9.11 B-J UT N-UT-84 SQ-116 14 1.250 ISI-2074-W-01 PSI R-P0689 8

RHRS RHRF-D031-05 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0763 9

RHRS RHRF-D031-05 B9.11 B-J UT N-UT-64 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0768 10 RHRS RHRF-D031-06 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0686 11 RHRS RHRF-D031-06 B9.11 B-J UT N-UT-84 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0690 12 RHRS RHRF-D031-07 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0683 13 RHRS RHRF-D031-07 B9.11 B-J UT N-UT-84 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0760 14 RHRS RHRF-D031-08 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 15 RHRS RHRF-D031-08 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 16 RHRS RHRF-D031-09 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0731 17 RHRS RHRF-D031-09 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0733 18 RHRS RHRF-D031-11 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0654 19 RHRS RHRF-D031-11 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0687 20 RHRS RHRF-D031-12 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0721 21 RHRS RHRF-D031-12 B9.11 B-J UT N-UT-84 SQ-116 14 1.250 ISI-2074-W-01 PSI R-P0770 22 RHRS RHRF-D031-13 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0719 23 RHRS RHRF-D031-13 B9.11 B-J UT N-UT-84 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0766 24 RHRS RHRF-D031-14 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0725 25 RHRS RHRF-D031-14 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2074-W-01 PSI R-P0767 26 RHRS RHRF-D031-15 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0718 27 RHRS RHRF-D031-15 B9.11 B-J UT N-UT-64 ALT SS 10 1.000 ISI-2074-W-01 PSI 28 RHRS RHRF-D031-17 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0730 29 RHRS RHRF-D031-17 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0734 30 RHRS RHRF-D031-19 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0655 31 RHRS RHRF-D031-19 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0692 32 RHRS RHRF-D031-20 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 33 RHRS RHRF-D031-20 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 34 RHRS RHRF-D031-21 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0656 35 RHRS RHRF-D031-21 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0688 36 RHRS RHRF-D032-08 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0679 37 RHRS RHRF-D032-08 B9.11 B-J UT N-UT-84 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0706 38 RHRS RHRF-D032-09 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0678 39 RHRS RHRF-D032-09 B9.11 B-J UT N-UT-84 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0707 40 Page 27 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRF-D032-10 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0703 41 RHRS RHRF-D032-10 B9.11 B-J UT N-UT-64 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0742 42 RHRS RHRF-D032-11 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0704 43 RHRS RHRF-D032-11 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2074-W-08 PSI R-P0769 44 RHRS RHRF-D032-12 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI 45 RHRS RHRF-D032-12 B9.11 B-J UT N-UT-64 ALT SS 6

0.719 ISI-2074-W-08 PSI 46 RHRS RHRF-D032-13 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0705 47 RHRS RHRF-D032-13 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2074-W-08 PSI R-P0749 48 RHRS RHRF-D033-10 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0665 49 RHRS RHRF-D033-10 B9.11 B-J UT N-UT-84 WB-83 8

0.906 ISI-2074-W-09 PSI R-P0708 50 RHRS RHRF-D033-11 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0666 51 RHRS RHRF-D033-11 B9.11 B-J UT N-UT-84 WB-83 8

0.906 ISI-2074-W-09 PSI R-P0709 52 RHRS RHRF-D033-12 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0717 53 RHRS RHRF-D033-12 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0757 54 RHRS RHRF-D033-13 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI 55 RHRS RHRF-D033-13 B9.11 B-J UT N-UT-64 ALT SS 8

0.906 ISI-2074-W-09 PSI 56 RHRS RHRF-D033-14 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0716 57 RHRS RHRF-D033-14 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0750 58 RHRS RHRF-D033-15 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0711 59 RHRS RHRF-D033-15 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0751 60 RHRS RHRF-D033-16 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0728 61 RHRS RHRF-D033-16 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0741 62 RHRS RHRF-D033-20 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0715 63 RHRS RHRF-D033-20 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0758 64 RHRS RHRS-001 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0677 65 RHRS RHRS-001 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0693 66 RHRS RHRS-002 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0675 67 RHRS RHRS-002 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0694 68 RHRS RHRS-003 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0676 69 RHRS RHRS-003 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0695 70 RHRS RHRS-004 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0652 71 RHRS RHRS-004 B9.11 B-J UT N-UT-64 WB-83 14 1.250 ISI-2074-W-01 PSI R-P0696 72 RHRS RHRS-005 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 73 RHRS RHRS-005 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 74 RHRS RHRS-006 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0682 75 RHRS RHRS-006 B9.11 B-J UT N-UT-84 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0762 76 RHRS RHRS-007 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0685 77 RHRS RHRS-007 B9.11 B-J UT N-UT-84 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0761 78 RHRS RHRS-008 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0729 79 RHRS RHRS-008 B9.11 B-J UT N-UT-84 SQ-116 10 1.000 ISI-2074-W-01 PSI R-P0735 80 Page 28 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRS-009 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI 81 RHRS RHRS-009 B9.11 B-J UT N-UT-64 ALT SS 10 1.000 ISI-2074-W-01 PSI 82 RHRS RHRS-010 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 83 RHRS RHRS-010 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 84 RHRS RHRS-011 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI R-P0732 85 RHRS RHRS-011 B9.11 B-J UT N-UT-84 SQ-116 14 1.250 ISI-2074-W-01 PSI R-P0736 86 RHRS RHRS-014 B9.11 B-J PT N-PT-9 14 1.250 ISI-2074-W-01 PSI 87 RHRS RHRS-014 B9.11 B-J UT N-UT-64 ALT SS 14 1.250 ISI-2074-W-01 PSI 88 RHRS RHRS-015 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0720 89 RHRS RHRS-015 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2074-W-01 PSI R-P0759 90 RHRS RHRS-016 B9.11 B-J PT N-PT-9 10 1.000 ISI-2074-W-01 PSI R-P0722 91 RHRS RHRS-016 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2074-W-01 PSI R-P0753 92 RHRS RHRS-163 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0697 93 RHRS RHRS-163 B9.11 B-J UT N-UT-64 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0743 94 RHRS RHRS-164 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI 95 RHRS RHRS-164 B9.11 B-J UT N-UT-64 ALT SS 8

0.906 ISI-2074-W-08 PSI 96 RHRS RHRS-165 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-08 PSI 97 RHRS RHRS-165 B9.11 B-J UT N-UT-64 ALT SS 8

0.906 ISI-2074-W-08 PSI 98 RHRS RHRS-166 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0698 99 RHRS RHRS-166 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2074-W-08 PSI R-P0744 100 RHRS RHRS-167 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0699 101 RHRS RHRS-167 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2074-W-08 PSI R-P0745 102 RHRS RHRS-168 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0700 103 RHRS RHRS-168 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2074-W-08 PSI R-P0746 104 RHRS RHRS-169 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0701 105 RHRS RHRS-169 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2074-W-08 PSI R-P0748 106 RHRS RHRS-170 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-08 PSI R-P0702 107 RHRS RHRS-170 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2074-W-08 PSI R-P0747 108 RHRS RHRS-179 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0710 109 RHRS RHRS-179 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0754 110 RHRS RHRS-180 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0712 111 RHRS RHRS-180 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0755 112 RHRS RHRS-181 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI 113 RHRS RHRS-181 B9.11 B-J UT N-UT-64 ALT SS 8

0.906 ISI-2074-W-09 PSI 114 RHRS RHRS-182 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0713 115 RHRS RHRS-182 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0756 116 RHRS RHRS-183 B9.11 B-J PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0714 117 RHRS RHRS-183 B9.11 B-J UT N-UT-64 SQ-116 8

0.906 ISI-2074-W-09 PSI R-P0752 118 RHRS RHRS-184 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0727 119 RHRS RHRS-184 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0737 120 Page 29 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRS-185 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0726 121 RHRS RHRS-185 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0738 122 RHRS RHRS-186 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0723 123 RHRS RHRS-186 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0739 124 RHRS RHRS-187 B9.11 B-J PT N-PT-9 6

0.719 ISI-2074-W-09 PSI R-P0724 125 RHRS RHRS-187 B9.11 B-J UT N-UT-64 SQ-116 6

0.719 ISI-2074-W-09 PSI R-P0740 126 Page 30 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-D196-03 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0422 1

SIS SIF-D196-03 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0437 2

SIS SIF-D196-04 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0406 3

SIS SIF-D196-04 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0436 4

SIS SIF-D196-05 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0447 5

SIS SIF-D196-05 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0472 6

SIS SIF-D196-06 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0448 7

SIS SIF-D196-06 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0486 8

SIS SIF-D196-06A B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0378 9

SIS SIF-D196-06A B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 10 SIS SIF-D196-07 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0410 11 SIS SIF-D196-07 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0440 12 SIS SIF-D196-08 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0407 13 SIS SIF-D196-08 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0439 14 SIS SIF-D196-09 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0446 15 SIS SIF-D196-09 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0482 16 SIS SIF-D196-10 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0377 17 SIS SIF-D196-10 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0487 18 SIS SIF-D196-11 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0442 19 SIS SIF-D196-11 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0488 20 SIS SIF-D196-12 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 21 SIS SIF-D196-12 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 22 SIS SIF-D197-03 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0276 23 SIS SIF-D197-03 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0304 24 SIS SIF-D197-04 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0285 25 SIS SIF-D197-04 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0289 26 SIS SIF-D197-05 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0286 27 SIS SIF-D197-05 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0287 28 SIS SIF-D197-06 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-06 PSI 29 SIS SIF-D197-06 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-06 PSI 30 SIS SIF-D197-07 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-06 PSI R-P0282 31 SIS SIF-D197-07 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-06 PSI R-P0290 32 SIS SIF-D197-08 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0293 33 SIS SIF-D197-08 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0306 34 SIS SIF-D197-09 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0296 35 SIS SIF-D197-09 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0305 36 SIS SIF-D197-10 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0299 37 SIS SIF-D197-10 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0310 38 SIS SIF-D197-11 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0463 39 SIS SIF-D197-11 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-10 PSI R-P0623 40 Page 31 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-D197-11A B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0464 41 SIS SIF-D197-11A B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-10 PSI R-P0620 42 SIS SIF-D197-12 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0476 43 SIS SIF-D197-12 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-10 PSI R-P0621 44 SIS SIF-D197-13 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0477 45 SIS SIF-D197-13 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-10 PSI R-P0622 46 SIS SIF-D198-03 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0327 47 SIS SIF-D198-03 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0348 48 SIS SIF-D198-04 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0335 49 SIS SIF-D198-04 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0341 50 SIS SIF-D198-05 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0336 51 SIS SIF-D198-05 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0344 52 SIS SIF-D198-06 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0326 53 SIS SIF-D198-06 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0349 54 SIS SIF-D198-07 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0318 55 SIS SIF-D198-07 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0350 56 SIS SIF-D198-08 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0329 57 SIS SIF-D198-08 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0339 58 SIS SIF-D198-09 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI 59 SIS SIF-D198-09 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI 60 SIS SIF-D198-10 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0333 61 SIS SIF-D198-10 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0343 62 SIS SIF-D198-11 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI 63 SIS SIF-D198-11 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI 64 SIS SIF-D199-03 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0388 65 SIS SIF-D199-03 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0434 66 SIS SIF-D199-04 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0387 67 SIS SIF-D199-04 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0430 68 SIS SIF-D199-04A B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0385 69 SIS SIF-D199-04A B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0429 70 SIS SIF-D199-05 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0355 71 SIS SIF-D199-05 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0369 72 SIS SIF-D199-06 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0356 73 SIS SIF-D199-06 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0370 74 SIS SIF-D199-07 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0401 75 SIS SIF-D199-07 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI R-P0405 76 SIS SIF-D199-08 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0402 77 SIS SIF-D199-08 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI 78 SIS SIF-D199-09 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0358 79 SIS SIF-D199-09 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI R-P0367 80 Page 32 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-D199-10 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0362 81 SIS SIF-D199-10 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0382 82 SIS SIF-D199-11 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0359 83 SIS SIF-D199-11 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0383 84 SIS SIF-D199-12 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0371 85 SIS SIF-D199-12 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0373 86 SIS SIF-D199-13 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI 87 SIS SIF-D199-13 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-10 PSI 88 SIS SIF-D199-14 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0469 89 SIS SIF-D199-14 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-10 PSI R-P0490 90 SIS SIF-D199-15 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0470 91 SIS SIF-D199-15 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-10 PSI R-P0491 92 SIS SIS-072 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-06 PSI R-P0284 93 SIS SIS-072 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-06 PSI R-P0291 94 SIS SIS-073 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-06 PSI R-P0283 95 SIS SIS-073 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-06 PSI R-P0292 96 SIS SIS-07A B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0325 97 SIS SIS-07A B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0351 98 SIS SIS-083 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0264 99 SIS SIS-083 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0300 100 SIS SIS-084 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0277 101 SIS SIS-084 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0303 102 SIS SIS-085 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0278 103 SIS SIS-085 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0302 104 SIS SIS-086 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0279 105 SIS SIS-086 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0301 106 SIS SIS-087 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0281 107 SIS SIS-087 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0288 108 SIS SIS-088 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0295 109 SIS SIS-088 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0307 110 SIS SIS-089 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0294 111 SIS SIS-089 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0308 112 SIS SIS-090 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0297 113 SIS SIS-090 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0309 114 SIS SIS-091 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-06 PSI R-P0298 115 SIS SIS-091 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-06 PSI R-P0311 116 SIS SIS-092 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0324 117 SIS SIS-092 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0353 118 SIS SIS-093 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0319 119 SIS SIS-093 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0352 120 Page 33 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIS-094 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0330 121 SIS SIS-094 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0338 122 SIS SIS-095 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-07 PSI R-P0328 123 SIS SIS-095 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-07 PSI R-P0340 124 SIS SIS-104 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0337 125 SIS SIS-104 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0347 126 SIS SIS-105 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0331 127 SIS SIS-105 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0346 128 SIS SIS-106 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0332 129 SIS SIS-106 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0345 130 SIS SIS-107 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI 131 SIS SIS-107 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI 132 SIS SIS-108 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI R-P0334 133 SIS SIS-108 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI R-P0342 134 SIS SIS-109 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI 135 SIS SIS-109 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI 136 SIS SIS-110 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-07 PSI 137 SIS SIS-110 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-07 PSI 138 SIS SIS-111 B9.11 B-J PT N-PT-9 6"

0.719" ISI-2063-W-08 PSI R-P0399 139 SIS SIS-111 B9.11 B-J UT N-UT-64 WB-83 6"

0.719" ISI-2063-W-08 PSI R-P0404 140 SIS SIS-112 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0400 141 SIS SIS-112 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI R-P0403 142 SIS SIS-112A B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0365 143 SIS SIS-112A B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI R-P0374 144 SIS SIS-113 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-08 PSI R-P0357 145 SIS SIS-113 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-08 PSI R-P0366 146 SIS SIS-119 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0386 147 SIS SIS-119 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0432 148 SIS SIS-120 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0384 149 SIS SIS-120 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0431 150 SIS SIS-121 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0354 151 SIS SIS-121 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0368 152 SIS SIS-122 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0364 153 SIS SIS-122 B9.11 B-J UT N-UT-84 WB-84 10 1.000 ISI-2063-W-08 PSI R-P0380 154 SIS SIS-123 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0363 155 SIS SIS-123 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0379 156 SIS SIS-124 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0361 157 SIS SIS-124 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0381 158 SIS SIS-125 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0360 159 SIS SIS-125 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0376 160 Page 34 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIS-126 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-08 PSI R-P0372 161 SIS SIS-126 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-08 PSI R-P0375 162 SIS SIS-127 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0409 163 SIS SIS-127 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0433 164 SIS SIS-128 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0408 165 SIS SIS-128 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0438 166 SIS SIS-129 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0444 167 SIS SIS-129 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0480 168 SIS SIS-130 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-09 PSI R-P0445 169 SIS SIS-130 B9.11 B-J UT N-UT-64 WB-83 6

0.719 ISI-2063-W-09 PSI R-P0481 170 SIS SIS-136 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 171 SIS SIS-136 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 172 SIS SIS-137 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0411 173 SIS SIS-137 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0435 174 SIS SIS-138 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 175 SIS SIS-138 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 176 SIS SIS-139 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 177 SIS SIS-139 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 178 SIS SIS-140 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 179 SIS SIS-140 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 180 SIS SIS-141 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI R-P0443 181 SIS SIS-141 B9.11 B-J UT N-UT-84 WB-83 10 1.000 ISI-2063-W-09 PSI R-P0489 182 SIS SIS-142 B9.11 B-J PT N-PT-9 10 1.000 ISI-2063-W-09 PSI 183 SIS SIS-142 B9.11 B-J UT N-UT-64 WB-83 10 1.000 ISI-2063-W-09 PSI 184 SIS SIS-144 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0462 185 SIS SIS-144 B9.11 B-J UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-10 PSI R-P0624 186 SIS SIS-145 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0473 187 SIS SIS-145 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-10 PSI R-P0483 188 SIS SIS-147 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0474 189 SIS SIS-147 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-10 PSI R-P0484 190 SIS SIS-148 B9.11 B-J PT N-PT-9 6

0.719 ISI-2063-W-10 PSI R-P0471 191 SIS SIS-148 B9.11 B-J UT N-UT-84 WB-83 6

0.719 ISI-2063-W-10 PSI R-P0485 192 Page 35 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT CVCS CVCF-B-T284-06 B9.21 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0000 1

CVCS CVCF-B-T284-07 B9.21 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0813 2

CVCS CVCF-D136-10 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI 3

CVCS CVCF-D136-11 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0771 4

CVCS CVCF-D136-11B B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0774 5

CVCS CVCF-D136-12 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0775 6

CVCS CVCF-D137-12 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0782 7

CVCS CVCF-D137-13 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0784 8

CVCS CVCF-D137-13A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0783 9

CVCS CVCF-D137-14 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0785 10 CVCS CVCF-D137-14A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0786 11 CVCS CVCF-D137-15 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0793 12 CVCS CVCF-D139-04 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 13 CVCS CVCF-D139-05 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 14 CVCS CVCF-D139-09A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0917 15 CVCS CVCF-D139-09B B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0916 16 CVCS CVCF-D139-10 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0798 17 CVCS CVCF-D139-10A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0799 18 CVCS CVCF-D139-10B B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0797 19 CVCS CVCF-D139-10C B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0794 20 CVCS CVCF-D139-10D B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0915 21 CVCS CVCF-D139-10E B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0914 22 CVCS CVCF-D139-10F B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0913 23 CVCS CVCF-D139-10G B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0912 24 CVCS CVCF-D139-10H B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0911 25 CVCS CVCF-D139-10I B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0910 26 CVCS CVCF-D139-10J B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0909 27 CVCS CVCF-D139-11 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0908 28 CVCS CVCF-D139-11A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0801 29 CVCS CVCF-D139-11B B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0802 30 CVCS CVCF-D139-11C B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0803 31 CVCS CVCF-D139-11D B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0800 32 CVCS CVCF-D139-12 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0804 33 CVCS CVCF-D139-13 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0805 34 CVCS CVCF-D139-13A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0808 35 CVCS CVCF-D139-13B B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0807 36 CVCS CVCF-D139-13C B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0806 37 CVCS CVCF-D139-14 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0809 38 CVCS CVCS-01 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0772 39 CVCS CVCS-02 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0773 40 Page 36 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT CVCS CVCS-10 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0795 41 CVCS CVCS-12 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI R-P0796 42 CVCS CVCS-25A B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 43 CVCS CVCS-26 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 44 CVCS CVCS-27 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 45 CVCS CVCS-28 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 46 CVCS CVCS-29 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 47 CVCS CVCS-30 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 48 CVCS CVCS-31 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-02 PSI 49 CVCS CVCS-32 B9.21 B-J PT N-PT-9 3

0.438 ISI-2062-W-01 PSI R-P0787 50 RCS RCF-D144-02 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0209 1

RCS RCF-D144-03 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0208 2

RCS RCF-D144-04 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0207 3

RCS RCF-D144-06 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0204 4

RCS RCF-D144-07 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0205 5

RCS RCF-D144-08 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0206 6

RCS RCF-G-T013-01 B9.21 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0054 7

RCS RCS-003 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0212 8

RCS RCS-004 B9.21 B-J PT N-PT-9 3

0.438 ISI-2068-W-04 PSI R-P0203 9

Page 37 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T076-01 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0592 1

SIS SIF-B-T076-06 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0590 2

SIS SIF-B-T076-23 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0591 3

SIS SIF-B-T077-01 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-13 PSI R-P0650 4

SIS SIF-B-T095-01 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-12 PSI R-P0588 5

SIS SIF-B-T097-12 B9.22 B-J UT N-UT-64 WB-20 1.5 0.281 ISI-2063-W-12 PSI 6

SIS SIF-B-T097-13 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-12 PSI R-P0589 7

SIS SIF-B-T107-04 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0646 8

SIS SIF-B-T107-05 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0649 9

SIS SIF-B-T107-26 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0647 10 SIS SIF-B-T142-01 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-13 PSI R-P0651 11 SIS SIF-B-T142-24 B9.22 B-J UT N-UT-64 WB-20 1.5 0.281 ISI-2063-W-13 PSI 12 SIS SIF-B-T142-25 B9.22 B-J UT N-UT-64 WB-20 1.5 0.281 ISI-2063-W-13 PSI 13 SIS SIF-B-T154-01 B9.22 B-J UT N-UT-84 WB-20 1.5 0.281 ISI-2063-W-14 PSI R-P0648 14 SIS SIF-D193-03 B9.22 B-J UT N-UT-64 WB-06 3

0.438 ISI-2063-W-11 PSI R-P0508 15 SIS SIF-D193-04 B9.22 B-J UT N-UT-64 WB-06 3

0.438 ISI-2063-W-11 PSI R-P0505 16 SIS SIF-D193-05 B9.22 B-J UT N-UT-64 WB-05 3

0.438 ISI-2063-W-11 PSI 17 SIS SIF-D193-06 B9.22 B-J UT N-UT-64 WB-06 3

0.438 ISI-2063-W-11 PSI 18 SIS SIF-D193-06A B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0545 19 SIS SIF-D193-07 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0548 20 SIS SIF-D193-07A B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI 21 SIS SIF-D193-08 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0549 22 SIS SIF-D193-09 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0551 23 SIS SIF-D193-10 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0553 24 SIS SIF-D193-11 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0557 25 SIS SIF-D193-12 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0558 26 SIS SIF-D193-12A B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0559 27 SIS SIF-D193-13 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0550 28 SIS SIS-149 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0504 29 SIS SIS-150 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0506 30 SIS SIS-151 B9.22 B-J UT N-UT-64 WB-06 3

0.438 ISI-2063-W-11 PSI R-P0507 31 SIS SIS-152 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0509 32 SIS SIS-153 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0546 33 SIS SIS-154 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0547 34 SIS SIS-155 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0552 35 SIS SIS-156 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0554 36 SIS SIS-157 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0555 37 SIS SIS-158 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0556 38 SIS SIS-159 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0560 39 SIS SIS-160 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0561 40 Page 38 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIS-161 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0562 41 SIS SIS-162 B9.22 B-J UT N-UT-64 WB-06 2.5 0.375 ISI-2063-W-11 PSI R-P0563 42 RCS RCS-1-5 B9.31 B-J PT N-PT-9 10"/27.5" 2.21" ISI-2068-W-02 PSI 1

RCS RCS-1-5 B9.31 B-J UT N-UT-33 WB-59 10"/27.5" 2.21" ISI-2068-W-02 PSI 2

RCS RCS-1-6 B9.31 B-J PT N-PT-9 6"/29" 2.33" ISI-2068-W-02 PSI R-P0087 3

RCS RCS-1-6 B9.31 B-J UT N-UT-33 WB-60 6"/29" 2.33" ISI-2068-W-02 PSI R-P0101 4

RCS RCS-2-5 B9.31 B-J PT N-PT-9 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0094 5

RCS RCS-2-5 B9.31 B-J UT N-UT-33 WB-60 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0103 6

RCS RCS-2-6 B9.31 B-J PT N-PT-9 6"/29" 2.33" ISI-2068-W-02 PSI R-P0092 7

RCS RCS-2-6 B9.31 B-J UT N-UT-33 WB-60 6"/29" 2.33" ISI-2068-W-02 PSI R-P0105 8

RCS RCS-3-5 B9.31 B-J PT N-PT-9 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0098 9

RCS RCS-3-5 B9.31 B-J UT N-UT-33 WB-60 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0102 10 RCS RCS-3-6 B9.31 B-J PT N-PT-9 6"/29" 2.33" ISI-2068-W-02 PSI R-P0100 11 RCS RCS-3-6 B9.31 B-J UT N-UT-33 WB-60 6"/29" 2.33" ISI-2068-W-02 PSI R-P0106 12 RCS RCS-4-5 B9.31 B-J PT N-PT-9 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0090 13 RCS RCS-4-5 B9.31 B-J UT N-UT-33 WB-60 10"/27.5" 2.21" ISI-2068-W-02 PSI R-P0104 14 RCS RCS-4-6 B9.31 B-J PT N-PT-9 14"/29" 2.33" ISI-2068-W-02 PSI 15 RCS RCS-4-6 B9.31 B-J UT N-UT-33 WB-60 14"/29" 2.33" ISI-2068-W-02 PSI 16 RCS RCS-P-1 B9.31 B-J PT N-PT-9 29"/14" 2.33" ISI-2068-W-01 PSI 17 RCS RCS-P-1 B9.31 B-J UT N-UT-33 WB-60 29"/14" 2.33" ISI-2068-W-01 PSI 18 RCS RCW-01 B9.31 B-J PT N-PT-9 4"/27.5" 2.21"

  • ISI-2068-W-02 PSI R-P0079 19 RCS RCW-01 B9.31 B-J UT N-UT-64 ALT SS 4"/27.5" 2.21"
  • ISI-2068-W-02 PSI R-P0107 20 RCS RCW-02 B9.31 B-J PT N-PT-9 4"/27.5" 2.21"
  • ISI-2068-W-02 PSI R-P0095 21 RCS RCW-02 B9.31 B-J UT N-UT-64 WB-83 4"/27.5" 2.21"
  • ISI-2068-W-02 PSI R-P0108 22 Page 39 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS CVCW-01 B9.32 B-J PT N-PT-9 3"/27.5" 2.21" ISI-2068-W-02 PSI R-P0078 1

RCS CVCW-02 B9.32 B-J PT N-PT-9 3"/31" 2.48" ISI-2068-W-02 PSI R-P0099 2

RCS CVCW-03 B9.32 B-J PT N-PT-9 3"/27.5" 2.21" ISI-2068-W-02 PSI R-P0089 3

RCS RCW-03 B9.32 B-J PT N-PT-9 2"/6" 0.718" ISI-2068-W-05 PSI 4

RCS RCW-04 B9.32 B-J PT N-PT-9 2"/27.5" 2.21" ISI-2068-W-02 PSI R-P0080 5

RCS RCW-05 B9.32 B-J PT N-PT-9 3"/31" 2.48" ISI-2068-W-02 PSI R-P0111 6

RCS RCW-06 B9.32 B-J PT N-PT-9 2"/27.5" 2.21" ISI-2068-W-02 PSI R-P0091 7

RCS RCW-07 B9.32 B-J PT N-PT-9 3"/31" 2.48" ISI-2068-W-02 PSI 8

RCS RCW-08 B9.32 B-J PT N-PT-9 2"/27.5" 2.21" ISI-2068-W-02 PSI R-P0096 9

RCS RCW-09 B9.32 B-J PT N-PT-9 3"/31" 2.48" ISI-2068-W-02 PSI R-P0123 10 RCS RCW-10 B9.32 B-J PT N-PT-9 2"/27.5" 2.21" ISI-2068-W-02 PSI R-P0086 11 RCS RCW-11 B9.32 B-J PT N-PT-9 3"/31" 2.48" ISI-2068-W-02 PSI R-P0113 12 RCS RCW-12 B9.32 B-J PT N-PT-9 2"/31" 2.48" ISI-2068-W-02 PSI R-P0038 13 RCS RCW-13 B9.32 B-J PT N-PT-9 2"/31" 2.48" ISI-2068-W-02 PSI R-P0039 14 RCS RCW-14 B9.32 B-J PT N-PT-9 2"/31" 2.48" ISI-2068-W-02 PSI R-P0077 15 RCS SIW-1 B9.32 B-J PT N-PT-9 1.5"/27.5" 2.21" ISI-2068-W-02 PSI R-P0085 16 RCS SIW-2 B9.32 B-J PT N-PT-9 1.5"/27.5" 2.21" ISI-2068-W-02 PSI R-P0093 17 RCS SIW-3 B9.32 B-J PT N-PT-9 1.5"/27.5" 2.21" ISI-2068-W-02 PSI R-P0097 18 RCS SIW-4 B9.32 B-J PT N-PT-9 1.5"/27.5" 2.21" ISI-2068-W-02 PSI R-P0088 19 RHRS RHRS-162A B9.32 B-J PT N-PT-9 2"/8" 0.906" ISI-2074-W-08 PSI R-P0667 1

RHRS RHRS-177A B9.32 B-J PT N-PT-9 2"/8" 0.906" ISI-2074-W-09 PSI R-P0664 2

SIS SIS-056A B9.32 B-J PT N-PT-9 6"/2" 0.718" ISI-2063-W-06 PSI R-P0272 1

SIS SIS-092A B9.32 B-J PT N-PT-9 2/6" 0.719 ISI-2063-W-07 PSI R-P0323 2

SIS SIS-111A B9.32 B-J PT N-PT-9 2"/6" 0.719" ISI-2063-W-08 PSI R-P0389 3

SIS SIS-127A B9.32 B-J PT N-PT-9 2"/6" 0.718" ISI-2063-W-09 PSI R-P0412 4

SIS SIS-143 B9.32 B-J PT N-PT-9 2"/6" 0.718" ISI-2063-W-10 PSI R-P0461 5

SIS SIS-146 B9.32 B-J PT N-PT-9 2"/6" 0.719 ISI-2063-W-10 PSI R-P0441 6

SIS SIS-148A B9.32 B-J PT N-PT-9 1 1/2"/3" 0.438" ISI-2063-W-12 PSI R-P0564 7

SIS SIS-150A B9.32 B-J PT N-PT-9 1.5/3" 0.432" ISI-2063-W-14 PSI R-P0604 8

Page 40 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT CVCS CVCF-B-T284-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0776 1

CVCS CVCF-B-T284-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0815 2

CVCS CVCF-B-T284-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0816 3

CVCS CVCF-B-T284-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0812 4

CVCS CVCF-B-T284-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0811 5

CVCS CVCF-B-T284-014 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0810 6

CVCS CVCF-B-T284-015 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI 7

CVCS CVCF-B-T284-016 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0778 8

CVCS CVCF-B-T284-017 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0779 9

CVCS CVCF-B-T284-018 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0780 10 CVCS CVCF-B-T284-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0777 11 CVCS CVCF-B-T284-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0790 12 CVCS CVCF-B-T284-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0789 13 CVCS CVCF-B-T284-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0788 14 CVCS CVCF-B-T284-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0817 15 CVCS CVCF-B-T284-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0814 16 CVCS CVCF-B-T297-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0819 17 CVCS CVCF-B-T306-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0839 18 CVCS CVCF-B-T306-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0838 19 CVCS CVCF-B-T306-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0837 20 CVCS CVCF-B-T306-012A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0844 21 CVCS CVCF-B-T306-012B B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0845 22 CVCS CVCF-B-T306-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0842 23 CVCS CVCF-B-T306-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0865 24 CVCS CVCF-B-T306-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0860 25 CVCS CVCF-B-T306-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0840 26 CVCS CVCF-B-T315-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0864 27 CVCS CVCF-B-T315-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0875 28 CVCS CVCF-B-T315-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0876 29 CVCS CVCF-B-T315-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0877 30 CVCS CVCF-B-T315-014 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0878 31 CVCS CVCF-B-T315-015 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0879 32 CVCS CVCF-B-T315-016 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0880 33 CVCS CVCF-B-T315-017 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0881 34 CVCS CVCF-B-T315-018 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0882 35 CVCS CVCF-B-T315-019 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0871 36 CVCS CVCF-B-T315-020 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0872 37 CVCS CVCF-B-T315-021 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0874 38 CVCS CVCF-B-T315-022 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0873 39 CVCS CVCF-B-T315-023 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0867 40 Page 41 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT CVCS CVCF-B-T315-024 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0868 41 CVCS CVCF-B-T315-025 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-05 PSI R-P0869 42 CVCS CVCF-B-T315-026 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-05 PSI R-P0870 43 CVCS CVCF-B-T315-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0862 44 CVCS CVCF-B-T315-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0861 45 CVCS CVCF-B-T315-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-05 PSI R-P0863 46 CVCS CVCF-B-T322-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI 47 CVCS CVCF-B-T322-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI 48 CVCS CVCF-B-T322-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI 49 CVCS CVCF-B-T322-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0887 50 CVCS CVCF-B-T322-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI 51 CVCS CVCF-B-T322-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0883 52 CVCS CVCF-B-T322-08A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0884 53 CVCS CVCF-B-T322-08B B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0885 54 CVCS CVCF-B-T322-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0886 55 CVCS CVCF-B-T327-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0818 56 CVCS CVCF-B-T327-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0821 57 CVCS CVCF-B-T327-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0822 58 CVCS CVCF-B-T327-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0823 59 CVCS CVCF-B-T327-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0824 60 CVCS CVCF-B-T327-014 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-03 PSI R-P0825 61 CVCS CVCF-B-T327-015 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-03 PSI R-P0826 62 CVCS CVCF-B-T327-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI 63 CVCS CVCF-B-T327-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0835 64 CVCS CVCF-B-T327-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0836 65 CVCS CVCF-B-T327-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0834 66 CVCS CVCF-B-T327-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0833 67 CVCS CVCF-B-T327-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0829 68 CVCS CVCF-B-T327-07A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0830 69 CVCS CVCF-B-T327-07B B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0831 70 CVCS CVCF-B-T327-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0832 71 CVCS CVCF-B-T327-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-03 PSI R-P0820 72 CVCS CVCF-B-T339-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0843 73 CVCS CVCF-B-T339-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0849 74 CVCS CVCF-B-T339-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0850 75 CVCS CVCF-B-T339-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0851 76 CVCS CVCF-B-T339-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0852 77 CVCS CVCF-B-T339-014 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-04 per WR R-P0853 78 CVCS CVCF-B-T339-015 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-04 PSI R-P0854 79 CVCS CVCF-B-T339-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0857 80 Page 42 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT CVCS CVCF-B-T339-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0856 81 CVCS CVCF-B-T339-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0855 82 CVCS CVCF-B-T339-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0858 83 CVCS CVCF-B-T339-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0841 84 CVCS CVCF-B-T339-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0846 85 CVCS CVCF-B-T339-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0847 86 CVCS CVCF-B-T339-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0848 87 CVCS CVCF-B-T346-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0888 88 CVCS CVCF-B-T346-010 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0900 89 CVCS CVCF-B-T346-011 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0901 90 CVCS CVCF-B-T346-012 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0902 91 CVCS CVCF-B-T346-013 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0903 92 CVCS CVCF-B-T346-014 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0904 93 CVCS CVCF-B-T346-015 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0905 94 CVCS CVCF-B-T346-016 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-06 PSI R-P0906 95 CVCS CVCF-B-T346-017 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2062-W-06 PSI R-P0907 96 CVCS CVCF-B-T346-01A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI 97 CVCS CVCF-B-T346-01B B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0889 98 CVCS CVCF-B-T346-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0890 99 CVCS CVCF-B-T346-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0891 100 CVCS CVCF-B-T346-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0892 101 CVCS CVCF-B-T346-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0893 102 CVCS CVCF-B-T346-05A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0895 103 CVCS CVCF-B-T346-05B B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0894 104 CVCS CVCF-B-T346-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0896 105 CVCS CVCF-B-T346-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0897 106 CVCS CVCF-B-T346-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0898 107 CVCS CVCF-B-T346-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-06 PSI R-P0899 108 CVCS CVCF-D142-25 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0866 109 CVCS CVCF-D142-26 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-04 PSI R-P0859 110 CVCS CVCF-D142-27 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI 111 CVCS CVCF-D142-28 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0791 112 CVCS CVCF-D142-28A B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0792 113 CVCS CVCF-D142-29 B9.40 B-J PT N-PT-9 2

0.344 ISI-2062-W-01 PSI R-P0781 114 Page 43 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-A-T040-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0021 1

RCS RCF-A-T040-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0022 2

RCS RCF-A-T040-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0023 3

RCS RCF-A-T040-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0024 4

RCS RCF-A-T040-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0025 5

RCS RCF-A-T040-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0026 6

RCS RCF-A-T040-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0036 7

RCS RCF-A-T040-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0035 8

RCS RCF-A-T040-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0034 9

RCS RCF-A-T040-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0037 10 RCS RCF-A-T040-12 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0027 11 RCS RCF-A-T040-13 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0028 12 RCS RCF-A-T040-14 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0029 13 RCS RCF-A-T040-15 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0030 14 RCS RCF-A-T040-16 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0033 15 RCS RCF-A-T040-17 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0032 16 RCS RCF-A-T040-18 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0031 17 RCS RCF-A-T047-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0040 18 RCS RCF-A-T047-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0041 19 RCS RCF-A-T047-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0042 20 RCS RCF-A-T047-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0043 21 RCS RCF-A-T047-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0044 22 RCS RCF-A-T047-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0045 23 RCS RCF-A-T047-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0046 24 RCS RCF-A-T047-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0047 25 RCS RCF-A-T047-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0048 26 RCS RCF-A-T047-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0049 27 RCS RCF-A-T047-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0050 28 RCS RCF-A-T047-12 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0051 29 RCS RCF-A-T047-13 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0052 30 RCS RCF-A-T047-14 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0053 31 RCS RCF-G-T011-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0064 32 RCS RCF-G-T011-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0065 33 RCS RCF-G-T011-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0066 34 RCS RCF-G-T011-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0067 35 RCS RCF-G-T011-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0068 36 RCS RCF-G-T011-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0069 37 RCS RCF-G-T011-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0070 38 RCS RCF-G-T011-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0071 39 RCS RCF-G-T011-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0072 40 Page 44 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RCS RCF-G-T011-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0073 41 RCS RCF-G-T011-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI 42 RCS RCF-G-T011-12 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0074 43 RCS RCF-G-T011-13 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0075 44 RCS RCF-G-T011-14 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0076 45 RCS RCF-G-T013-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0055 46 RCS RCF-G-T013-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0056 47 RCS RCF-G-T013-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0057 48 RCS RCF-G-T013-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0058 49 RCS RCF-G-T013-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0059 50 RCS RCF-G-T013-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0060 51 RCS RCF-G-T013-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0061 52 RCS RCF-G-T013-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0062 53 RCS RCF-G-T013-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2068-W-06 PSI R-P0063 54 RHRS RHRF-B-T082-1 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0668 1

RHRS RHRF-B-T082-2 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0669 2

RHRS RHRF-B-T082-3 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0670 3

RHRS RHRF-B-T082-4 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0680 4

RHRS RHRF-B-T082-5 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0681 5

RHRS RHRF-B-T082-6 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0671 6

RHRS RHRF-B-T082-7 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0672 7

RHRS RHRF-B-T082-8 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0673 8

RHRS RHRF-B-T082-9 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-08 PSI R-P0674 9

RHRS SIF-B-T135-1 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0663 10 RHRS SIF-B-T135-2 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0662 11 RHRS SIF-B-T135-3 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0661 12 RHRS SIF-B-T135-4 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0657 13 RHRS SIF-B-T135-5 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0658 14 RHRS SIF-B-T135-6 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0659 15 RHRS SIF-B-T135-7 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI R-P0660 16 RHRS SIF-B-T135-8 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI 17 RHRS SIF-B-T135-9 B9.40 B-J PT N-PT-9 2

0.344 ISI-2074-W-09 PSI 18 Page 45 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T070-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0322 1

SIS SIF-B-T070-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0321 2

SIS SIF-B-T070-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0320 3

SIS SIF-B-T070-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0317 4

SIS SIF-B-T070-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0316 5

SIS SIF-B-T070-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0315 6

SIS SIF-B-T070-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0314 7

SIS SIF-B-T070-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0312 8

SIS SIF-B-T070-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-07 PSI R-P0313 9

SIS SIF-B-T076-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0582 10 SIS SIF-B-T076-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0583 11 SIS SIF-B-T076-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0584 12 SIS SIF-B-T076-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0585 13 SIS SIF-B-T076-24 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0586 14 SIS SIF-B-T077-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 15 SIS SIF-B-T077-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 16 SIS SIF-B-T077-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 17 SIS SIF-B-T077-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 18 SIS SIF-B-T077-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 19 SIS SIF-B-T092-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0413 20 SIS SIF-B-T092-01A B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0414 21 SIS SIF-B-T092-01B B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0415 22 SIS SIF-B-T092-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0416 23 SIS SIF-B-T092-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0417 24 SIS SIF-B-T092-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0418 25 SIS SIF-B-T092-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0419 26 SIS SIF-B-T092-05A B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0420 27 SIS SIF-B-T092-05B B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0421 28 SIS SIF-B-T092-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0427 29 SIS SIF-B-T092-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0428 30 SIS SIF-B-T092-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0426 31 SIS SIF-B-T092-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0423 32 SIS SIF-B-T092-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0425 33 SIS SIF-B-T092-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-09 PSI R-P0424 34 SIS SIF-B-T095-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0492 35 SIS SIF-B-T095-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0493 36 SIS SIF-B-T095-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0494 37 SIS SIF-B-T095-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0495 38 SIS SIF-B-T095-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0496 39 SIS SIF-B-T095-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0497 40 Page 46 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T095-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0498 41 SIS SIF-B-T095-09 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0499 42 SIS SIF-B-T095-10 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0510 43 SIS SIF-B-T095-11 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0511 44 SIS SIF-B-T095-12 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0512 45 SIS SIF-B-T095-13 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0513 46 SIS SIF-B-T095-14 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0514 47 SIS SIF-B-T095-15 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0515 48 SIS SIF-B-T095-16 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0516 49 SIS SIF-B-T095-17 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0517 50 SIS SIF-B-T095-18 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0518 51 SIS SIF-B-T095-19 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI 52 SIS SIF-B-T095-21A B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0523 53 SIS SIF-B-T095-21B B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0524 54 SIS SIF-B-T095-21C B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0525 55 SIS SIF-B-T095-21D B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0526 56 SIS SIF-B-T095-21E B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0527 57 SIS SIF-B-T095-21F B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0528 58 SIS SIF-B-T095-21G B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0529 59 SIS SIF-B-T095-21H B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0530 60 SIS SIF-B-T095-22 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0500 61 SIS SIF-B-T095-23 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0501 62 SIS SIF-B-T095-24 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0519 63 SIS SIF-B-T095-25 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0520 64 SIS SIF-B-T095-26 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0521 65 SIS SIF-B-T095-27 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0522 66 SIS SIF-B-T095-28 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0502 67 SIS SIF-B-T095-29 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0503 68 SIS SIF-B-T097-01 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0531 69 SIS SIF-B-T097-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0532 70 SIS SIF-B-T097-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0533 71 SIS SIF-B-T097-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0534 72 SIS SIF-B-T097-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0573 73 SIS SIF-B-T097-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0572 74 SIS SIF-B-T097-09 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0571 75 SIS SIF-B-T097-10 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI 76 SIS SIF-B-T097-11 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI 77 SIS SIF-B-T097-14 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0535 78 SIS SIF-B-T097-15 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0536 79 SIS SIF-B-T103-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0452 80 Page 47 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T103-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0453 81 SIS SIF-B-T103-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0454 82 SIS SIF-B-T103-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0455 83 SIS SIF-B-T103-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0456 84 SIS SIF-B-T103-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0457 85 SIS SIF-B-T103-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0458 86 SIS SIF-B-T103-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0459 87 SIS SIF-B-T103-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0460 88 SIS SIF-B-T103-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0478 89 SIS SIF-B-T103-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0479 90 SIS SIF-B-T103-12 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 91 SIS SIF-B-T103-13 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 92 SIS SIF-B-T103-14 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 93 SIS SIF-B-T103-15 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 94 SIS SIF-B-T106-01 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0565 95 SIS SIF-B-T106-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0566 96 SIS SIF-B-T106-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0567 97 SIS SIF-B-T106-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0568 98 SIS SIF-B-T106-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0569 99 SIS SIF-B-T106-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI 100 SIS SIF-B-T106-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI 101 SIS SIF-B-T106-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-12 PSI R-P0570 102 SIS SIF-B-T107-01 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0605 103 SIS SIF-B-T107-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0606 104 SIS SIF-B-T107-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0607 105 SIS SIF-B-T107-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0608 106 SIS SIF-B-T107-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0609 107 SIS SIF-B-T107-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0610 108 SIS SIF-B-T107-09 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0611 109 SIS SIF-B-T107-10 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0612 110 SIS SIF-B-T107-11 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0613 111 SIS SIF-B-T107-16 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0614 112 SIS SIF-B-T107-17 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0615 113 SIS SIF-B-T107-18 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0637 114 SIS SIF-B-T107-19 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0638 115 SIS SIF-B-T107-19A B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0639 116 SIS SIF-B-T107-19B B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0640 117 SIS SIF-B-T107-20 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P00625 118 SIS SIF-B-T107-21 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0641 119 SIS SIF-B-T107-22 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0616 120 Page 48 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T107-23 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0617 121 SIS SIF-B-T107-24 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0642 122 SIS SIF-B-T107-25 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0643 123 SIS SIF-B-T114-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0390 124 SIS SIF-B-T114-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0391 125 SIS SIF-B-T114-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0392 126 SIS SIF-B-T114-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0393 127 SIS SIF-B-T114-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0394 128 SIS SIF-B-T114-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0395 129 SIS SIF-B-T114-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0396 130 SIS SIF-B-T114-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0397 131 SIS SIF-B-T114-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-08 PSI R-P0398 132 SIS SIF-B-T132-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI 133 SIS SIF-B-T132-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI 134 SIS SIF-B-T132-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI 135 SIS SIF-B-T132-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0271 136 SIS SIF-B-T132-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0270 137 SIS SIF-B-T132-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0269 138 SIS SIF-B-T132-07 B9.40 B-J PT N-PT-9 N/A 2

0.344 ISI-2063-W-06 PSI R-P0268 139 SIS SIF-B-T132-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0267 140 SIS SIF-B-T132-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0266 141 SIS SIF-B-T132-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0265 142 SIS SIF-B-T132-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI 143 SIS SIF-B-T132-11A B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0273 144 SIS SIF-B-T132-15 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0274 145 SIS SIF-B-T132-16 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0275 146 SIS SIF-B-T132-17 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-06 PSI R-P0280 147 SIS SIF-B-T141-01 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0467 148 SIS SIF-B-T141-02 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 149 SIS SIF-B-T141-03 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0468 150 SIS SIF-B-T141-04 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0449 151 SIS SIF-B-T141-05 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0450 152 SIS SIF-B-T141-06 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 153 SIS SIF-B-T141-07 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0451 154 SIS SIF-B-T141-08 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0465 155 SIS SIF-B-T141-09 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0466 156 SIS SIF-B-T141-10 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI R-P0475 157 SIS SIF-B-T141-11 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 158 SIS SIF-B-T141-12 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 159 SIS SIF-B-T141-13 B9.40 B-J PT N-PT-9 2

0.344 ISI-2063-W-10 PSI 160 Page 49 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T142-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0537 161 SIS SIF-B-T142-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0538 162 SIS SIF-B-T142-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0539 163 SIS SIF-B-T142-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0540 164 SIS SIF-B-T142-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0541 165 SIS SIF-B-T142-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0542 166 SIS SIF-B-T142-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0543 167 SIS SIF-B-T142-09 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0544 168 SIS SIF-B-T142-10 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0581 169 SIS SIF-B-T142-11 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0580 170 SIS SIF-B-T142-12 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0579 171 SIS SIF-B-T142-13 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0578 172 SIS SIF-B-T142-14 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0644 173 SIS SIF-B-T142-15 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0645 174 SIS SIF-B-T142-16 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 175 SIS SIF-B-T142-17 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 176 SIS SIF-B-T142-17A B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0574 177 SIS SIF-B-T142-17B B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0575 178 SIS SIF-B-T142-17C B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0576 179 SIS SIF-B-T142-17D B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0577 180 SIS SIF-B-T142-18 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0626 181 SIS SIF-B-T142-19 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0627 182 SIS SIF-B-T142-20 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0628 183 SIS SIF-B-T142-21 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 184 SIS SIF-B-T142-26 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0629 185 SIS SIF-B-T142-27 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0630 186 SIS SIF-B-T142-28 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0631 187 SIS SIF-B-T142-29 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0632 188 SIS SIF-B-T142-30 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0633 189 SIS SIF-B-T142-31 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0634 190 SIS SIF-B-T142-32 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0635 191 SIS SIF-B-T142-33 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI R-P0636 192 SIS SIF-B-T142-34 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-13 PSI 193 SIS SIF-B-T154-02 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0593 194 SIS SIF-B-T154-03 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0594 195 SIS SIF-B-T154-04 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0595 196 SIS SIF-B-T154-05 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI r-p0619 197 SIS SIF-B-T154-06 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0596 198 SIS SIF-B-T154-07 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0618 199 SIS SIF-B-T154-08 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0597 200 Page 50 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T154-08A B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI 201 SIS SIF-B-T154-08B B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0598 202 SIS SIF-B-T154-09 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0599 203 SIS SIF-B-T154-10 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0600 204 SIS SIF-B-T154-11 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0601 205 SIS SIF-B-T154-12 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0602 206 SIS SIF-B-T154-13 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0603 207 SIS SIF-B-T154-14 B9.40 B-J PT N-PT-9 1.5 0.281 ISI-2063-W-14 PSI R-P0587 208 PZR PZRLUG-1 B10.10 B-K MT N-MT-6 4"x6.44" 6"

ISI-2068C-E-01 PSI 1

PZR PZRLUG-2 B10.10 B-K MT N-MT-6 4"x6.44" 6"

ISI-2068C-E-01 PSI 2

PZR PZRLUG-3 B10.10 B-K MT N-MT-6 4"x6.44" 6"

ISI-2068C-E-01 PSI 3

PZR PZRLUG-4 B10.10 B-K MT N-MT-6 4"x6.44" 6"

ISI-2068C-E-01 PSI 4

PZR WP-17-IA B10.10 B-K MT N-MT-6 84" 1.500 ISI-2068C-E-06 PSI 5

RCP 2-RCW-RCP-1 B12.10 B-L-1 VT-1 N-VT-1 0

0.000 ISI-2068B-E-03 PSI 1

RCP 2-RCW-RCP-2 B12.10 B-L-1 VT-1 N-VT-1 0

0.000 ISI-2068B-E-03 PSI 2

RCP 2-RCW-RCP-3 B12.10 B-L-1 VT-1 N-VT-1 0

0.000 ISI-2068B-E-03 PSI R-P0991 3

RCP 2-RCW-RCP-4 B12.10 B-L-1 VT-1 N-VT-1 0

0.000 ISI-2068B-E-03 PSI 4

RCS INTERIOR B13.10 B-N-1 VT-3 N-VT-1 0.00 0.000 ISI-2068-E-02 PSI 1

RV BBR-1 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 1

RV BBR-2 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 2

RV BBR-3 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 3

RV BBR-4 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 4

RV BBR-5 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 5

RV BBR-6 B13.60 B-N-2 VT-3 N-VT-1 173 0.000 ISI-2068-E-02 PSI 6

RV CORE-SUPPORT-1 B13.70 B-N-3 VT-3 N-VT-1 0.000 NEED DWG PSI 1

Page 51 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RV CRDW-54 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1030 1

RV CRDW-58 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1031 2

RV CRDW-60 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1032 3

RV CRDW-62 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1033 4

RV CRDW-63 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1035 5

RV CRDW-64 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1034 6

RV CRDW-65 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1036 7

RV CRDW-66 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1037 8

RV CRDW-67 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1038 9

RV CRDW-68 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1039 10 RV CRDW-69 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1040 11 RV CRDW-70 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1041 12 RV CRDW-71 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1042 13 RV CRDW-72 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1028 14 RV CRDW-73 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI R-P1029 15 RV CRDW-74 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI 16 RV CRDW-75 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI 17 RV CRDW-76 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI 18 RV CRDW-77 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI 19 RV CRDW-78 B14.10 B-O UT N-UT-87 WB-52 4

.67" ISI-2068A-E-05 PSI 20 Page 52 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRF-D024-04 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0953 1

RHRS RHRF-D024-04 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0956 2

RHRS RHRF-D024-05 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0944 3

RHRS RHRF-D024-05 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0955 4

RHRS RHRF-D024-06A C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0947 5

RHRS RHRF-D024-06A C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0961 6

RHRS RHRF-D024-07 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0941 7

RHRS RHRF-D024-07 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0957 8

RHRS RHRF-D024-11 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0945 9

RHRS RHRF-D024-11 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0954 10 RHRS RHRF-D025-07B C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-02 PSI R-P0949 11 RHRS RHRF-D025-07B C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-02 PSI R-P0960 12 RHRS RHRF-D025-11 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-02 PSI R-P0952 13 RHRS RHRF-D025-11 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-02 PSI R-P0965 14 RHRS RHRF-D025-15 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-02 PSI R-P0951 15 RHRS RHRF-D025-15 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-02 PSI R-P0964 16 RHRS RHRF-D032-02 C5.11 C-F-1 PT N-PT-9 12 1.125 ISI-2074-W-08 PSI R-P0920 17 RHRS RHRF-D032-02 C5.11 C-F-1 UT N-UT-84 WB-83 12 1.125 ISI-2074-W-08 PSI R-P0931 18 RHRS RHRF-D033-01 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0919 19 RHRS RHRF-D033-01 C5.11 C-F-1 UT N-UT-84 WB-83 8

0.906 ISI-2074-W-09 PSI R-P0930 20 RHRS RHRS-020 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-01 PSI R-P0921 21 RHRS RHRS-020 C5.11 C-F-1 UT N-UT-84 WB-83 14 0.438 ISI-2074-W-01 PSI R-P0929 22 RHRS RHRS-023 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-02 PSI R-P0950 23 RHRS RHRS-023 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-02 PSI R-P0966 24 RHRS RHRS-032 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-02 PSI R-P0948 25 RHRS RHRS-032 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-02 PSI R-P0959 26 RHRS RHRS-042 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0942 27 RHRS RHRS-042 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0958 28 RHRS RHRS-058 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0940 29 RHRS RHRS-058 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0962 30 RHRS RHRS-061 C5.11 C-F-1 PT N-PT-9 14 0.438 ISI-2074-W-03 PSI R-P0943 31 RHRS RHRS-061 C5.11 C-F-1 UT N-UT-64 WBN-97 14 0.438 ISI-2074-W-03 PSI R-P0963 32 RHRS RHRS-153 C5.11 C-F-1 PT N-PT-9 12 1.125 ISI-2074-W-08 PSI R-P0946 33 RHRS RHRS-153 C5.11 C-F-1 UT N-UT-64 ALT SS 12 1.125 ISI-2074-W-08 PSI 34 RHRS RHRS-158 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0924 35 RHRS RHRS-158 C5.11 C-F-1 UT N-UT-84 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0933 36 RHRS RHRS-162 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2074-W-08 PSI R-P0923 37 RHRS RHRS-162 C5.11 C-F-1 UT N-UT-84 WB-83 8

0.906 ISI-2074-W-08 PSI R-P0934 38 RHRS RHRS-171 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0927 39 RHRS RHRS-171 C5.11 C-F-1 UT N-UT-64 WBN-98 8

0.906 ISI-2074-W-09 PSI R-P0967 40 Page 53 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT RHRS RHRS-176 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2074-W-09 PSI R-P0926 41 RHRS RHRS-176 C5.11 C-F-1 UT N-UT-84 WB-83 8

0.906 ISI-2074-W-09 PSI R-P0935 42 Page 54 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-D123-07 C5.11 C-F-1 PT N-PT-9 12 0.500" ISI-2063-W-01 PSI R-P0972 1

SIS SIF-D123-07 C5.11 C-F-1 UT N-UT-64 WBN-97 12 0.500" ISI-2063-W-01 PSI R-P0975 2

SIS SIF-D124-07 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-02 PSI R-P0974 3

SIS SIF-D124-07 C5.11 C-F-1 UT N-UT-64 WBN-97 8

0.906 ISI-2063-W-02 PSI R-P0978 4

SIS SIF-D125-08 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-03 PSI R-P0973 5

SIS SIF-D125-08 C5.11 C-F-1 UT N-UT-64 WBN-97 8

0.906 ISI-2063-W-03 PSI R-P0979 6

SIS SIF-D194-01B C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-04 PSI 7

SIS SIF-D194-01B C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-04 PSI 8

SIS SIF-D194-02 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-04 PSI 9

SIS SIF-D194-02 C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-04 PSI 10 SIS SIF-D195-03 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-05 PSI R-P0922 11 SIS SIF-D195-03 C5.11 C-F-1 UT N-UT-84 WB-83 8

0.906 ISI-2063-W-05 PSI R-P0932 12 SIS SIF-D195-04 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-05 PSI 13 SIS SIF-D195-04 C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-05 PSI 14 SIS SIF-D195-05 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-05 PSI 15 SIS SIF-D195-05 C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-05 PSI 16 SIS SIF-D195-11 C5.11 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-05 PSI 17 SIS SIF-D195-11 C5.11 C-F-1 UT N-UT-64 ALT SS 6

0.719 ISI-2063-W-05 PSI 18 SIS SIF-D195-13 C5.11 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-05 PSI R-P0918 19 SIS SIF-D195-13 C5.11 C-F-1 UT N-UT-64 ALT SS 6

0.719 ISI-2063-W-05 PSI 20 SIS SIS-028 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-02 PSI R-P0969 21 SIS SIS-028 C5.11 C-F-1 UT N-UT-64 WBN-97 8

0.906 ISI-2063-W-02 PSI R-P0980 22 SIS SIS-030 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-02 PSI R-P0968 23 SIS SIS-030 C5.11 C-F-1 UT N-UT-64 WBN-97 8

0.906 ISI-2063-W-02 PSI R-P0977 24 SIS SIS-044 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-03 PSI R-P0971 25 SIS SIS-044 C5.11 C-F-1 UT N-UT-64 WBN-97 8

0.906 ISI-2063-W-03 PSI R-P0976 26 SIS SIS-050 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-04 PSI 27 SIS SIS-050 C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-04 PSI 28 SIS SIS-053 C5.11 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-04 PSI R-P0925 29 SIS SIS-053 C5.11 C-F-1 UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-04 PSI R-P0936 30 SIS SIS-056 C5.11 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-04 PSI R-P0938 31 SIS SIS-056 C5.11 C-F-1 UT N-UT-84 WB-83 6

0.719 ISI-2063-W-04 PSI R-P0939 32 SIS SIS-059 C5.11 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-04 PSI R-P0928 33 SIS SIS-059 C5.11 C-F-1 UT N-UT-84 SQ-116 6

0.719 ISI-2063-W-04 PSI R-P0937 34 SIS SIS-067 C5.11 C-F-1 PT N-PT-9 8

0.906 ISI-2063-W-05 PSI 35 SIS SIS-067 C5.11 C-F-1 UT N-UT-64 ALT SS 8

0.906 ISI-2063-W-05 PSI 36 SIS SIS-163 C5.11 C-F-1 PT N-PT-9 16 0.500" ISI-2063-W-01 PSI R-P0970 37 SIS SIS-163 C5.11 C-F-1 UT N-UT-64 ALT SS 16 0.500" ISI-2063-W-01 PSI 38 Page 55 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-B-T071-08 C5.21 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-19 PSI 1

SIS SIF-B-T071-08 C5.21 C-F-1 UT N-UT-64 ALT SS 2

0.343 ISI-2063-W-19 PSI 2

SIS SIF-B-T071-09 C5.21 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-19 PSI 3

SIS SIF-B-T071-09 C5.21 C-F-1 UT N-UT-64 ALT SS 2

0.343 ISI-2063-W-19 PSI 4

SIS SIF-B-T090-06 C5.21 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-22 PSI 5

SIS SIF-B-T090-06 C5.21 C-F-1 UT N-UT-64 ALT SS 2

0.343 ISI-2063-W-22 PSI 6

SIS SIF-B-T090-07 C5.21 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-22 PSI 7

SIS SIF-B-T090-07 C5.21 C-F-1 UT N-UT-64 ALT SS 2

0.343 ISI-2063-W-22 PSI 8

SIS SIF-D116-01D C5.21 C-F-1 PT N-PT-9 3

0.300 ISI-2063-W-30 PSI 9

SIS SIF-D116-01D C5.21 C-F-1 UT N-UT-64 ALT SS 3

0.300 ISI-2063-W-30 PSI 10 SIS SIF-D116-06 C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1061 11 SIS SIF-D116-06 C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1079 12 SIS SIF-D116-07B C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1063 13 SIS SIF-D116-07B C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1072 14 SIS SIF-D116-07C C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1062 15 SIS SIF-D116-07C C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1071 16 SIS SIF-D116-10 C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1067 17 SIS SIF-D116-10 C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1075 18 SIS SIF-D116-10A C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1064 19 SIS SIF-D116-10A C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1076 20 SIS SIF-D116-10B C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1060 21 SIS SIF-D116-10B C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1077 22 SIS SIF-D116-11 C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1057 23 SIS SIF-D116-11 C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1078 24 SIS SIF-D116-11C C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1059 25 SIS SIF-D116-11C C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1070 26 SIS SIF-D116-11D C5.21 C-F-1 PT N-PT-9 4

0.337 ISI-2063-W-28 PSI R-P1058 27 SIS SIF-D116-11D C5.21 C-F-1 UT N-UT-64 WBN-98 4

0.337 ISI-2063-W-28 PSI R-P1073 28 SIS SIF-D116-17 C5.21 C-F-1 PT N-PT-9 3

0.438 ISI-2063-W-37 PSI 29 SIS SIF-D116-17 C5.21 C-F-1 UT N-UT-64 ALT SS 3

0.438 ISI-2063-W-37 PSI 30 SIS SIF-D116-18 C5.21 C-F-1 PT N-PT-9 3

0.438 ISI-2063-W-37 PSI 31 SIS SIF-D116-18 C5.21 C-F-1 UT N-UT-64 ALT SS 3

0.438 ISI-2063-W-37 PSI 32 SIS SIF-D118-01 C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 33 SIS SIF-D118-01 C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 34 SIS SIF-D118-02 C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 35 SIS SIF-D118-02 C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 36 SIS SIF-D118-02B C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 37 SIS SIF-D118-02B C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 38 SIS SIF-D118-02D C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 39 SIS SIF-D118-02D C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 40 Page 56 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-D118-02E C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 41 SIS SIF-D118-02E C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 42 SIS SIF-D118-03A C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 43 SIS SIF-D118-03A C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 44 SIS SIF-D118-03C C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 45 SIS SIF-D118-03C C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 46 SIS SIF-D118-05 C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 47 SIS SIF-D118-05 C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 48 SIS SIF-D118-05A C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 49 SIS SIF-D118-05A C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 50 SIS SIF-D118-05B C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 51 SIS SIF-D118-05B C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 52 SIS SIF-D118-05C C5.21 C-F-1 PT N-PT-9 4

0.531 ISI-2063-W-15 PSI 53 SIS SIF-D118-05C C5.21 C-F-1 UT N-UT-64 ALT SS 4

0.531 ISI-2063-W-15 PSI 54 SIS SIF-D118-06 C5.21 C-F-1 PT N-PT-9 6

0.719 ISI-2063-W-15 PSI R-P1083 55 SIS SIF-D118-06 C5.21 C-F-1 UT N-UT-64 WBN-98 6

0.719 ISI-2063-W-15 PSI R-P1074 56 SIS SIF-D193-02 C5.21 C-F-1 PT N-PT-9 3

0.438 ISI-2063-W-15 PSI 57 SIS SIF-D193-02 C5.21 C-F-1 UT N-UT-64 ALT CS 3

0.438 ISI-2063-W-15 PSI 58 Page 57 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT SIS SIF-A-T006-23 C5.30 C-F-1 PT N-PT-9 2

0.218 ISI-2063-W-37 PSI 1

SIS SIF-A-T006-26 C5.30 C-F-1 PT N-PT-9 2

0.218 ISI-2063-W-37 PSI 2

SIS SIF-A-T007-36 C5.30 C-F-1 PT N-PT-9 2

0.218 ISI-2063-W-38 PSI 3

SIS SIF-A-T008-02 C5.30 C-F-1 PT N-PT-9 2

0.218 ISI-2063-W-39 PSI 4

SIS SIF-A-T008-03 C5.30 C-F-1 PT N-PT-9 2

0.154 ISI-2063-W-39 PSI 5

SIS SIF-A-T008-04 C5.30 C-F-1 PT N-PT-9 2

0.154 ISI-2063-W-39 PSI 6

SIS SIF-B-T071-03 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-19 PSI 7

SIS SIF-B-T071-04 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-19 PSI 8

SIS SIF-B-T071-05 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-19 PSI 9

SIS SIF-B-T080-14 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-26 PSI R-1080 10 SIS SIF-B-T080-15 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-26 PSI R-P1081 11 SIS SIF-B-T080-16 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-26 PSI R-P1082 12 SIS SIF-B-T090-08 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-22 PSI 13 SIS SIF-B-T090-09 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-22 PSI 14 SIS SIF-B-T090-10 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-22 PSI 15 SIS SIF-B-T104-02 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-18 PSI 16 SIS SIF-B-T104-03 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-18 PSI 17 SIS SIF-B-T112-07 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-23 PSI 18 SIS SIF-B-T112-08 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-23 PSI 19 SIS SIF-B-T112-09 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-23 PSI 20 SIS SIF-D200-01 C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-18 PSI 21 SIS SIF-D200-35A C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-16 PSI 22 SIS SIF-D200-35B C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-16 PSI 23 SIS SIF-D200-35C C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-16 PSI 24 SIS SIF-D200-35D C5.30 C-F-1 PT N-PT-9 2

0.343 ISI-2063-W-16 PSI 25 Page 58 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT FWS FWF-D001-02 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-01 PSI R-P0990 1

FWS FWF-D001-02 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-01 PSI R-P1020 2

FWS FWF-D002-03 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-02 PSI R-P0993 3

FWS FWF-D002-03 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-02 PSI R-P1054 4

FWS FWF-D002-21 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-03 PSI R-P1002 5

FWS FWF-D002-21 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-03 PSI R-P1053 6

FWS FWF-D003-02 C5.51 C-F-2 MT N-MT-6 18 0.937 ISI-2003A-W-04 PSI R-P0981 7

FWS FWF-D003-02 C5.51 C-F-2 UT N-UT-84 WBN-95 18 0.937 ISI-2003A-W-04 PSI R-1017 8

FWS FWF-D003-12 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-04 PSI R-P1000 9

FWS FWF-D003-12 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-04 PSI R-P1049 10 FWS FWS-004A C5.51 C-F-2 MT N-MT-6 6

0.432 ISI-2003A-W-01 PSI R-0982 11 FWS FWS-004A C5.51 C-F-2 UT N-UT-76 WBN-95 6

0.432 ISI-2003A-W-01 PSI R-P1018 12 FWS FWS-008 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-01 PSI R-P0985 13 FWS FWS-008 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-01 PSI R-P1048 14 FWS FWS-015 C5.51 C-F-2 MT N-MT-6 18 0.937 ISI-2003A-W-02 PSI R-P0994 15 FWS FWS-015 C5.51 C-F-2 UT N-UT-84 WBN-95 18 0.937 ISI-2003A-W-02 PSI R-P1055 16 FWS FWS-036 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-03 PSI R-P1001 17 FWS FWS-036 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-03 PSI R-P1052 18 FWS FWS-047 C5.51 C-F-2 MT N-MT-6 16 0.844 ISI-2003A-W-04 PSI R-P0983 19 FWS FWS-047 C5.51 C-F-2 UT N-UT-84 WBN-95 16 0.844 ISI-2003A-W-04 PSI R-P1016 20 Page 59 of 60 SORT ORDER: Category, Itemno, System, Componen

SYSTEM COMPONENT ISONO ITEMNO CATEGORY EXSCHD NDEPROC CALSTD COMPDIA NOMTHCK EXREQ REPORT MSS MSF-D001-01 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-01 PSI R-P0988 1

MSS MSF-D001-01 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-01 PSI R-P1047 2

MSS MSF-D001-04 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-01 PSI R-P0986 3

MSS MSF-D001-04 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-01 PSI R-P1044 4

MSS MSF-D003-04 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-02 PSI R-P1003 5

MSS MSF-D003-04 C5.51 C-F-2 UT 76 WBN-95 32 1.175" ISI-2001-W-02 PSI R-P1051 6

MSS MSF-D006-04 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-03 PSI R-P1004 7

MSS MSF-D006-04 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-03 PSI R-P1050 8

MSS MSF-D009-04 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-04 PSI R-P0989 9

MSS MSF-D009-04 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-04 PSI R-P1045 10 MSS MSF-D009-07 C5.51 C-F-2 MT N-MT-6 6

0.756 ISI-2001-W-04 PSI R-P0999 11 MSS MSF-D009-07 C5.51 C-F-2 UT N-UT-84 WBN-95 6

0.756 ISI-2001-W-04 PSI R-P1019 12 MSS MSS-01 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-01 PSI R-P0987 13 MSS MSS-01 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-01 PSI R-P1046 14 MSS MSS-051 C5.51 C-F-2 MT N-MT-6 30/32" 2.875" ISI-2001-W-03 PSI R-P0995 15 MSS MSS-051 C5.51 C-F-2 UT N-UT-76 SQ-40 30/32" 2.875" ISI-2001-W-03 PSI R-P1043 16 MSS MSS-052 C5.51 C-F-2 MT N-MT-6 30 1.109" ISI-2001-W-03 PSI R-P0996 17 MSS MSS-052 C5.51 C-F-2 UT N-UT-76 WBN-95 30 1.109" ISI-2001-W-03 PSI R-P1015 18 MSS MSS-057 C5.51 C-F-2 MT N-MT-6 6"

1.469" ISI-2001-W-03 PSI R-P0997 19 MSS MSS-057 C5.51 C-F-2 UT N-UT-76 WBN-95 6"

1.469" ISI-2001-W-03 PSI R-P1021 20 MSS MSS-058 C5.51 C-F-2 MT N-MT-6 6"

1.469" ISI-2001-W-03 PSI R-P0998 21 MSS MSS-058 C5.51 C-F-2 UT N-UT-76 WBN-95 6"

1.469" ISI-2001-W-03 PSI R-P1022 22 MSS MSS-08 C5.51 C-F-2 MT N-MT-6 32 1.175" ISI-2001-W-01 PSI R-P0984 23 MSS MSS-08 C5.51 C-F-2 UT N-UT-76 WBN-95 32 1.175" ISI-2001-W-01 PSI R-P1013 24 Page 60 of 60 SORT ORDER: Category, Itemno, System, Componen

ISO Program Manuals NDE Procedures Table of Contents

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 1

Procedure Title VOLUME 1 NDE Procedures Manual Procedure/Design Requirement Cross-Reference Matrix 1/29/99, 6 pgs.

(Part 1 of 2) 1/29/99, 3 pgs.

(Part 2 of 2)

N-ET-6 Eddy Current Examination of Tubing in Balance of Plant Components Rev. 6, 9 pgs.

N-ET-8 Eddy Current Examination for the Location of Discontinuities In Ferrous and Nonferromagnetic Materials Utilizing a Hand-Held Surface Probe Rev. 3, 8 pgs.

N-ET-9 Eddy Current Examination For Depth Sizing Linear Surface-Connected Indications In Non-Ferromagnetic Materials Rev. 3, 12 pgs.

N-GP-1 Marking and Identification Procedure for CSSC Components Rev. 9, 8 pgs.

N-GP-2 Electrochemical Etching of Austenitic Stainless Steel Piping Rev. 3, 5 pgs.

N-GP-5 Etching of Carbon Steel Piping Rev. 2, 5 pgs.

N-GP-6 Preparation of NDE Data Sheets Rev. 10, 7 pgs.

N-GP-7 Computation of Component Support Settings in Accordance with ASME Section XI Rev. 7, 8 pgs.

N-GP-8 Weld Reference System Rev. 5, 9 pgs.

N-GP-9 Approved Materials - All NDE Methods Rev. 18, 12 pgs.

N-GP-10 Examination for Arc Strike Removal Rev. 5, 8 pgs.

N-GP-11 Thickness Measurements of Pressure-Retaining Parts and Components Rev. 5, 15 pgs.

N-GP-12 Measurement of Delta Ferrite Content in Austenitic Stainless Steel Welds Cancel 07-10-08

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 2

Procedure Title N-GP-16 Section XI NDE Programs Drawing Preparation Instruction Rev. 3, 6 pgs.

N-GP-17 Ultrasonic Measurement of Wall Thickness Rev. 5, 15 pgs.

N-GP-18 Ultrasonic Testing Supplements Rev. 17, 25 pgs.

N-GP-19 Verification of Spring Can Settings Rev. 2, 13 pgs.

N-GP-21 Evaluation and Resolution of Ultrasonic Piping Data Rev. 5, 11 pgs.

N-GP-23 Locating Long Seams in Austenitic Materials Using Ultrasonic Testing Cancel 07-10-08 N-GP-24 Hardness Testing Rev. 5, 25 pgs N-GP-25 Curing And Compressive Strength Testing Of Concrete And Grout Test Specimens Rev. 2, 9 pgs.

N-GP-28 Calculation of ASME Code Coverage For Section XI NDE Examinations Rev. 6, 10 pgs.

N-GP-29 Approved Appendix VIII Ultrasonic Equipment Rev. 4, 4 pgs.

N-GP-30 Guideline For Ultrasonic Hands-On Practice Rev. 2, 6 pgs.

N-GP-31 Calculation of ASME Code Coverage for Section XI, Appendix VIII Ultrasonic Examinations Rev. 2, 24 pgs.

BOP-LT-1 Generic Ultrasonic Leak Detection Rev. 1, 8 pgs.

N-LT-1 Vacuum Box Leak Detection Examination Rev. 2, 8 pgs.

N-LT-2 Pressure Bubble Leak Detection Examination Rev. 2, 7 pgs.

BOP-MT-1 Wet Fluorescent Magnetic Particle Examination Of Turbine Components Rev. 4, 17 pgs.

N-MT-4 Magnetic Particle Examination of Terry Turbine Components Rev. 4, 13 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 3

Procedure Title N-MT-5 Magnetic Particle Examination of Crane Hooks Rev. 4, 9 pgs.

N-MT-6 Magnetic Particle Examination for ASME and ANSI Code Components and Welds Rev. 32, 60 pgs.

N-MT-7 Magnetic Particle Examination of AWS D1.1 and D1.5 Welded Joints Rev. 8, 24 pgs.

N-MT-8 Magnetic Particle Examination of Steam Turbine Rotor Wheel Finger Dovetails Rev. 4, 14 pgs.

BOP-PT-1 Wet Fluorescent Water Washable Liquid Penetrant Examination Rev. 5, 10 pgs.

BOP-PT-2 Solvent Removable Liquid Penetrant Examination of Turbine Components Rev. 3, 12 pgs.

N-PT-7 Liquid Penetrant Examination of Threaded Fasteners (Studs or Bolts), Two Inches and Smaller in Diameter And Other Components As Applicable Using the Fluorescent Water-Washable Method Rev. 13, 9 pgs.

N-PT-9 Liquid Penetrant Examination of ASME and ANSI Code Components and Welds Rev. 33, 56 pgs.

N-PT-10 Liquid Penetrant Examination of AWS D1.1 Welded Joints Rev. 6, 14 pgs.

VOLUME II N-RT-1 Radiographic Examination of Nuclear Power Plant Components Rev. 27, 69 pgs.

N-RT-2 Radiographic Examination of Structures, Systems, and Components (Nonmandatory)

Rev. 9, 15 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 4

Procedure Title N-RT-3 Radiographic Examination of Bridge and Structural Steel Welds Rev. 4, 22 pgs.

N-RT-4 Radiographic Examination of Microbiologically Induced Corrosion (MIC)

(Nonmandatory)

Rev. 1, 33 pgs.

BOP-UT-1 Ultrasonic Examination of Bearings With Babbitt To Steel Bond Rev. 3, 8 pgs.

BOP-UT-2 Ultrasonic Examination of Soldered Joints Rev. 3, 8 pgs.

BOP-UT-3 Ultrasonic Inspection of Turbine Dovetail Pins Rev. 2, 9 pgs.

BOP-UT-4 Balance of Plant (BOP) Ultrasonic Examination of Bolts and Studs Rev. 3, 5 pgs.

BOP-UT-6 Balance of Plant (BOP) Ultrasonic Examination of Expansion Bellows for Evidence of Circumferential Cracking Rev. 1, 6 pgs.

BOP-UT-7 Balance of Plant (BOP) Ultrasonic Examination of Bolts in the Main Generator Bus Output Terminal Coupler Rev. 1, 7 pgs.

BOP-UT-8 Ultrasonic Examination of Safety Related Bearings with Babbitt to Steel Bond Rev. 0, 10 pgs.

N-UT-7 Ultrasonic Examination of Vessel Support Skirt Welds Rev. 15, 13 pgs.

N-UT-9 Ultrasonic Examination of Reactor Vessel Welds Inactive 07-10-08 N-UT-11 Ultrasonic Examination for Detecting and Measuring Fluid Levels in Austenitic and Ferritic Systems Rev. 5, 11 pgs.

N-UT-18 Manual Ultrasonic Examination Piping Welds and Vessels with Wall Thicknesses 2 Inches and Less That Are Not Required to be Examined in Accordance with Appendix VIII Rev. 29, 23 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 5

Procedure Title N-UT-19 TC 10-01 04-01-2010, 2 pgs N-UT-19 Ultrasonic Examination of Welds in Vessels Greater Than 2-Inches in Wall Thickness Other Than Reactor Vessels Rev. 17, 21 pgs.

N-UT-21 Ultrasonic Examination of RCP Flywheels Rev. 9, 15 pgs.

N-UT-24 Ultrasonic Measurement of Wall Thickness Rev. 16, 8 pgs.

N-UT-26 Ultrasonic Examination for the Detection of I.D. Pitting, Erosion, and Corrosion Rev. 26, 13 pgs.

N-UT-30 Ultrasonic Examination of Tubing Installed in Header Drums Cancel 07-31-08 N-UT-31 Ultrasonic Measurement of Threaded Fasteners for Determining Length and Stretch Rev. 5, 10 pgs.

N-UT-33 Manual Ultrasonic Examination of Static and Centrifugally Cast Stainless Steel Piping Welds Rev. 11, 14 pgs.

N-UT-34 Ultrasonic Examination of Pipe and Tubing for Nuclear and Other Special Applications 2-1/2-Inch Diameter and Less Rev. 4, 7 pgs.

N-UT-37 Ultrasonic Examination of Bolts and Studs Greater Than 2 Diameter and RPV Flange Ligaments Rev. 9, 12 pgs.

N-UT-43 Ultrasonic Measurement of Stainless Steel Butter Rev. 5, 5 pgs.

VOLUME III N-UT-50 Ultrasonic Examination of ASME Section I, ASME Section III, and ASME Section VIII Rev. 10, 12 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 6

Procedure Title N-UT-51 Manual Ultrasonic Examination of Plates Rev. 5, 11 pgs.

N-UT-52 Ultrasonic Examination of AWS D1.1 Welded Joints Rev. 4, 25 pgs.

N-UT-53 Ultrasonic Examination of Base Material for Lamellar Tearing and Laminations Cancel 07-10-08 N-UT-54 Ultrasonic Examination to Determine Weld Overlay Cladding Thickness Rev. 3, 7 pgs.

N-UT-55 Ultrasonic Examination of Nozzle Inner Radius Sections from the Blend Radius Rev. 14, 22 pgs.

N-UT-58 Ultrasonic Examination of Lifting Rig Pins Rev. 6, 18 pgs.

N-UT-60 TC 09-02 04-10-09, 3 pgs N-UT-60 Ultrasonic Examination of Socket Welds to Detect Cracks Initiating At The Pipe I.D.

Beneath The Socket Weld Heel to Toe Area Rev. 2, 7 pgs.

N-UT-63 Ultrasonic Examination Of Safety Related Bearings With Babbitt To Steel Bond Cancel 07-31-08 N-UT-64 Generic Procedure For The Ultrasonic Examination Of Austenitic Pipe Welds Rev. 11, 6 pgs.

N-UT-65 Generic Procedure For the Ultrasonic Through Wall Sizing In Pipe Welds Rev. 5, 5 pgs.

N-UT-66 Generic Procedure for the Ultrasonic Examination of Weld Overlaid Austenitic Pipe Welds Rev. 6, 5 pgs.

N-UT-67 Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs Rev.4, 5 pgs.

N-UT-68 Generic Procedure for Ultrasonic Examination of Piping Welds Using the Instraspect Automated Imaging System Cancel 07-10-08 N-UT-69 Generic Procedure for Ultrasonic Flaw Sizing in Piping Welds Using the Instraspect (I/UX)

Automated Imaging System Cancel 07-10-08

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 7

Procedure Title N-UT-70 Generic Procedure for Ultrasonic Examination of Weld Overlaid Piping Using the Automated (I/UX) Imaging System Cancel 07-10-08 N-UT-71 Manual Ultrasonic Through Wall and Length Sizing of Ultrasonic Indications in Vessels Inactive 07-10-08 N-UT-72 Measuring Fluid Levels on Number 4 Hot Leg Rev. 3, 10 pgs.

N-UT-73 Manual Ultrasonic Examination of Welds and Inner Radiused Areas from the Inner Diameter (ID)

Cancel 07-10-08 N-UT-74 Manual Ultrasonic Examination of Heavy Steel Forgings Inactive 07-10-08 N-UT-75 Ultrasonic Examination of AWS Welded Joints Rev. 3, 31 pgs.

N-UT-76 Generic Procedure For The Ultrasonic Examination Of Ferritic Pipe Welds Rev. 7, 6 pgs.

N-UT-77 Ultrasonic Examination Of Welds In Vessels Greater Than 2-Inches In Wall Thickness Made From Austenitic Or High Nickle Alloy Materials Cancel 07-31-08 N-UT-78 PDI Generic Procedure for the Manual Ultrasonic Examination of Reactor Pressure Vessel Welds PDI-UT-6 Rev. 5, 5 pgs.

N-UT-79 PDI Generic Procedure for the Manual Ultrasonic Through Wall and Length Sizing of Ultrasonic Indications in Reactor Pressure Vessel Welds PDI-UT-7 Rev. 2, 5 pgs.

N-UT-80 Ultrasonic Examination of Westinghouse Reactor Coolant Pump Shafts (PWR)

Rev. 3, 15 pgs.

N-UT-81 Ultrasonic Examination of Piping Welds in Compliance with ASME Section III Rev. 1, 10 pgs.

N-UT-82 Generic Procedure for the Ultrasonic Examination of Dissimilar Pipe Welds Rev. 3, 6 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 8

Procedure Title N-UT-83 Automated Ultrasonic Examination of Reactor Coolant Pump Shafts (PWR)

Rev. 2, 18 pgs.

N-UT-84 Procedure for the Phased Array Ultrasonic Examination of Austenitic and Ferritic Pipe Welds Rev. 0, 7 pgs N-UT-85 Manual Ultrasonic Examination of Piping for Thermal Fatigue to Meet MRP-146 Requirements Rev. 0, 9 pgs

Rev. 0, 4 pgs N-UT-87 Generic Procedure for the Phased Array Ultrasonic Examination of Dissimilar Metal Welds Rev.0, 6 pgs BOP-VT-1 Visual Examination Of Turbine Components Rev. 2, 5 pgs.

BOP-VT-2 Visual Examination of Cross-under/Crossover Piping On Nuclear Turbines and Balance of Plant Components Rev. 4, 6 pgs.

N-VT-1 Visual Examination Procedure For ASME Section XI Preservice And Inservice Rev. 44, 32 pgs.

N-VT-2 Visual Examination of AWS Welds and HVAC Welds Rev. 17, 33 pgs.

N-VT-3 Visual Examination of Weld Ends, Fit-Ups, and Dimensional Examination of Weld Joints Rev. 26, 27 pgs.

N-VT-4 System Pressure Test Visual Examination Procedure Rev. 24, 13 pgs.

N-VT-6 Visual Examination of Structural Welds Using the Criteria of NCIG-01 Rev. 7, 25 pgs.

N-VT-7 Visual Examination of BWR Reactor Vessel and Core Support Structure Inactive 07-31-08 N-VT-8 Visual Examination of PWR Reactor Vessel Interiors and Core Support Structures Rev. 10, 18 pgs.

N-VT-9 Visual Examination of ASME III Bolts, Studs, and Nuts Rev. 2, 7 pgs.

ISO PROGRAM MANUALS NDE PROCEDURES TABLE OF CONTENTS 04/08/10, 9 Pages QA RECORD W47 100408 002

  • Revision 9

Procedure Title N-VT-10 Visual Examination of AWS and ASME Stud Welds Rev. 4, 18 pgs.

N-VT-11 Watts Bar Nuclear Plant Fit-up and Final Visual Weld Examination Rev. 6, 23 pgs.

N-VT-12 Watts Bar Nuclear Plant Fit-Up and Visual Weld on HVAC Duct Rev. 4, 28 pgs.

N-VT-13 Visual Examination of Brazed and Soldered Joints Rev. 3, 8 pgs.

N-VT-14 Visual Examination To Detect Erosion/Corrosion Damage Rev. 3, 6 pgs.

N-VT-15 Visual Examination Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Plants Rev. 10, 18 pgs.

N-VT-16 General Visual Examination Containment Vessel Integrity Verification Rev. 3, 9 pgs.

N-VT-17 Visual Examination For Leakage of PWR Reactor Head Penetrations Rev. 7, 10 pgs.

N-VT-18 Visual Examination of AWS Welds and HVAC Welds Rev. 1, 34 pgs.

N-VT-19 Visual Inspection of Alloy 600/82/182 Pressure Boundary Components Rev. 4, 8 pgs.

N-VT-20 Visual Weld Examination Dry Cask Assembly Rev. 1, 9 pgs.

BOP-Tank Examination Procedure for Storage Tanks And Low Pressure Vessels Rev. 2, 44 pgs.