Letter Sequence Request |
|---|
TAC:MD6311, Clarify Application of Setpoint Methodology for LSSS Functions, Control Room Habitability, Steam Generator Tube Integrity (Approved, Closed) TAC:MD8314, Elimination of Requirements for a Post Accident Sampling System (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement, Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, ML080860026, ML080860040, ML081700293, ML082410088, ML083460177, ML090480486, ML101200204, ML101260469, ML101600477, ML101680561, ML102170077, ML103010299, ML11213A130, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists Project stage: Request ML0732401242007-11-26026 November 2007 Summary of Meeting with Tennessee Valley Authority on Use of Eagle 21 at Watts Bar Unit 2 Project stage: Meeting ML0733900862007-12-0404 December 2007 Risk Informed Inservice Inspection Program Project stage: Request ML0734400222007-12-0505 December 2007 Westinghouse Eagle - 21 Process Protection System Project stage: Request ML0801705432008-01-0303 January 2008 Summary of December 12, 2007, Meeting with Tennessee Valley Authority on Reconstruction of the Licensing Basis for Watts Bar Unit 2 Project stage: Meeting ML0735209712008-01-0303 January 2008 Summary of Meeting with Tennessee Valley Authority on Reconstitution of the Licensing Basis for Watts Bar, Unit 2 Project stage: Meeting ML0803204432008-01-29029 January 2008 Regulatory Framework for the Completion of Construction and Licensing Activities Project stage: Request ML0803701852008-02-0101 February 2008 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-520-2, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction Project stage: Other ML0733300822008-02-15015 February 2008 IMC 2517, Watts Bar Unit 2 Construction Inspection Program Project stage: Request ML0807702372008-03-13013 March 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Restructured Tables Project stage: Request ML0812105062008-05-0707 May 2008 Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) Project stage: RAI ML0808600262008-05-0808 May 2008 Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0808600402008-05-0808 May 2008 Enclosure 1- Watts Bar Nuclear Plant, Unit 2 - Assessment of Remaining Operating License Application Review Scope Project stage: Other ML0810101162008-05-0808 May 2008 Review Topics for Safety Evaluation, Attachment 1 Project stage: Approval ML0814300282008-05-14014 May 2008 Transmittal of Annual Radiological Environmental Operating Report of 2007 Project stage: Request ML0813008092008-05-22022 May 2008 Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants Project stage: RAI ML0814901102008-05-28028 May 2008 Status of Generic Communications for Review (Tac No. MD8314) Project stage: Other ML0814901182008-05-28028 May 2008 NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 Project stage: Other ML0817002932008-06-16016 June 2008 Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 Project stage: Other ML0818504602008-07-0202 July 2008 Final Supplemental Environmental Impact Statement - Request for Additional Information Project stage: Supplement ML0818504592008-07-0202 July 2008 Response to Request for Additional Information Project stage: Response to RAI ML0821402382008-07-29029 July 2008 Generic Communications Status, Revision 1 Project stage: Other ML0824100882008-08-25025 August 2008 Westinghouse Eagle-21 Process Protection System Project stage: Other ML0827500192008-09-26026 September 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues Project stage: Other ML0825603732008-10-0202 October 2008 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates Project stage: Other ML0834601772008-12-0909 December 2008 Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs) Project stage: Other ML0904804362009-02-23023 February 2009 Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities Project stage: Meeting ML0904804662009-02-23023 February 2009 NRR - Public Meeting WBN2 Status 12-11-08 Project stage: Meeting ML0904804712009-02-23023 February 2009 Region II - December 2008 Public Meeting with Notes Project stage: Meeting ML0904804862009-02-23023 February 2009 TVA December 11, 2008 - Public MtgR1 Project stage: Other ML1012002042010-04-20020 April 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1016004772010-06-0303 June 2010 Final Safety Analysis Report (FSAR) - Response to Preliminary Requests for Additional Information Project stage: Other ML1015903722010-06-0303 June 2010 Information Regarding Buried Piping/Cable Project stage: Request ML1016805612010-06-17017 June 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1017602222010-06-25025 June 2010 Request to Use ASME Boiler and Pressure Vessel Code, Code Case N-520-3, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction, Section III, Division 1 Project stage: Other ML1020404822010-06-30030 June 2010 WNA-DS-01667-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - Design Specification Project stage: Request ML1020404842010-06-30030 June 2010 Enclosure 5, WNA-DS-01617-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification Project stage: Request ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022403822010-08-11011 August 2010 NRC August 3-4, 2010 Instrumentation and Controls Meeting - Request for Additional Information Project stage: Meeting ML1022900752010-08-16016 August 2010 Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies Project stage: Request ML1022801282010-08-16016 August 2010 OL - FW: 7-30-10_GL 95-07 RAI Response to NRC Project stage: Request ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification Project stage: Other ML1027404372010-10-12012 October 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 Project stage: RAI ML1030102992010-10-28028 October 2010 – Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1032100192010-10-31031 October 2010 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System (Nonproprietary), WNA-AR-001 80-WBT-NP, Revision 0, Dated October 2010. Attachment 2 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1106910592010-12-16016 December 2010 Request for Comments Project stage: Request 2008-08-25
[Table View] |
Text
1 WBN2Public Resource From:
Clark, Mark Steven [msclark0@tva.gov]
Sent:
Friday, February 11, 2011 7:24 AM To:
Hilmes, Steven A; Raley, Thomas R; Crouch, William D; Smith, Roger Edward; Stockton, Rickey A; Drake, Andrew P.; Solich, Benjamin D; Enis, Robert O; Brown, Robert G; Morgan, Christopher E.; Berner, Paul Cc:
Poole, Justin; McNeil, Douglas Ray; Merten, Mathew Arthur; Knuettel, Edward Terry; Elton, Thomas L; Mather, Dale C; Temples, Joe T Jr; Kepler, Jeffrey T
Subject:
RE: NRC I&C RAI metrics All:
To the best of my knowledge these are the current I&C RAI statistics based on Todays matrix update.
314 Closed 46 Total Open Items Broken down as follows:
8 NRC Review 1 TVA Oversight Review 1 TVA Oversight/WEC resolve document revision issue.
1 TVA Unit 2 Licensing - Update FSAR Figure in amendment 103 2 TVA/Bechtel Open - Civil on qualification of RM-1000 monitors (R.
Brown/R. Enis) 10 TVA/Bechtel Open - General Atomics on qualification of RM-1000 monitors (J. Temples/D. Mather) Includes 8 new questions.
1 TVA/Bechtel question on Valve Power Lockout 1 TVA/Bechtel Reopened question on Foxboro I/A COMS 1 TVA/Bechtel Open Pending Submittal of FSAR Amendment 103 1 TVA/WEC Open LPMS Qualification Documents (A. Drake/B. Solich) 19 TVA/WEC Open Common Q (A. Drake/B. Solich/M. Merten) 360 Total I&C RAI Matrix Items
- Regards, Steve Steve Clark Bechtel Power Corp.
Control Systems Watts Bar 2 Completion Project Phone: 423.365.1664 e-mail: msclark0@tva.gov
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
276 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF1B360D1E)
Subject:
RE: NRC I&C RAI metrics Sent Date:
2/11/2011 7:23:52 AM Received Date:
2/11/2011 7:23:59 AM From:
Clark, Mark Steven Created By:
msclark0@tva.gov Recipients:
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "McNeil, Douglas Ray" <drmcneil@tva.gov>
Tracking Status: None "Merten, Mathew Arthur" <mamerten@tva.gov>
Tracking Status: None "Knuettel, Edward Terry" <etknuettel@tva.gov>
Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov>
Tracking Status: None "Mather, Dale C" <dcmathe0@tva.gov>
Tracking Status: None "Temples, Joe T Jr" <jttemples@tva.gov>
Tracking Status: None "Kepler, Jeffrey T" <jtkepler@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "Raley, Thomas R" <trraley@tva.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None "Smith, Roger Edward" <resmith3@tva.gov>
Tracking Status: None "Stockton, Rickey A" <rastockton@tva.gov>
Tracking Status: None "Drake, Andrew P." <drake1ap@westinghouse.com>
Tracking Status: None "Solich, Benjamin D" <solichbd@westinghouse.com>
Tracking Status: None "Enis, Robert O" <roenis@tva.gov>
Tracking Status: None "Brown, Robert G" <rgbrown0@tva.gov>
Tracking Status: None "Morgan, Christopher E." <morgance@westinghouse.com>
Tracking Status: None "Berner, Paul" <Paul.Berner@ga-esi.com>
Tracking Status: None Post Office:
TVANUCXVS2.main.tva.gov
Files Size Date & Time MESSAGE 1148 2/11/2011 7:23:59 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: