Letter Sequence Other |
|---|
TAC:MD8314, Elimination of Requirements for a Post Accident Sampling System (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance...
- Supplement
Results
Other: CNL-14-154, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 12 (TAC No. MD6311), and Status of Generic Communications for Unit 2 - Revision 12, CNL-15-137, Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 13 (TAC No. MD6311) and Status of Generic Communications for Unit 2 - Revision 13, CNL-15-150, Pressurizer PORV Block Valves - Dynamic Testing Alternative, ML080370185, ML081490110, ML081490118, ML082140238, ML082560373, ML082750019, ML101200204, ML101260469, ML101600477, ML101680561, ML101760222, ML102170077, ML102700527, ML103010299, ML110210486, ML11145A085, ML11213A130, ML112940645, ML11362A056, ML12234A688, ML13023A315, ML13213A194
|
MONTHYEARML0733900862007-12-0404 December 2007 Risk Informed Inservice Inspection Program Project stage: Request ML0803204432008-01-29029 January 2008 Regulatory Framework for the Completion of Construction and Licensing Activities Project stage: Request ML0803701852008-02-0101 February 2008 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-520-2, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction Project stage: Other ML0813008092008-05-22022 May 2008 Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants Project stage: RAI ML0814901102008-05-28028 May 2008 Status of Generic Communications for Review (Tac No. MD8314) Project stage: Other ML0814901182008-05-28028 May 2008 NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 Project stage: Other ML0818504592008-07-0202 July 2008 Response to Request for Additional Information Project stage: Response to RAI ML0821402382008-07-29029 July 2008 Generic Communications Status, Revision 1 Project stage: Other ML0827500192008-09-26026 September 2008 Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues Project stage: Other ML0825603732008-10-0202 October 2008 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates Project stage: Other ML1012002042010-04-20020 April 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1012604692010-04-29029 April 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 2, and Status of Generic Communications for Unit 2 - Revision 2 Project stage: Other ML1015903722010-06-0303 June 2010 Information Regarding Buried Piping/Cable Project stage: Request ML1016004772010-06-0303 June 2010 Final Safety Analysis Report (FSAR) - Response to Preliminary Requests for Additional Information Project stage: Other ML1016805612010-06-17017 June 2010 Preservice Inspection Program Plan and Additional Information Project stage: Other ML1017602222010-06-25025 June 2010 Request to Use ASME Boiler and Pressure Vessel Code, Code Case N-520-3, Alternative Rules for Renewal of Active or Expired N-Type Certificates for Plants Not in Active Construction, Section III, Division 1 Project stage: Other ML1020404822010-06-30030 June 2010 WNA-DS-01667-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - Design Specification Project stage: Request ML1020404842010-06-30030 June 2010 Enclosure 5, WNA-DS-01617-WBT-NP, Rev. 1, Rras Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification Project stage: Request ML1021700772010-07-30030 July 2010 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 Project stage: Other ML1022403822010-08-11011 August 2010 NRC August 3-4, 2010 Instrumentation and Controls Meeting - Request for Additional Information Project stage: Meeting ML1022900752010-08-16016 August 2010 Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies Project stage: Request ML1022801282010-08-16016 August 2010 OL - FW: 7-30-10_GL 95-07 RAI Response to NRC Project stage: Request ML1027005272010-09-29029 September 2010 Request for Relief Regarding Alternative Rules for Renewal of Active or Expired N-Type Certification Project stage: Other ML1027404372010-10-12012 October 2010 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Responses to the NRC Requests for Additional Information (Rais) for General Letter 2004-02 Project stage: RAI ML1030102992010-10-28028 October 2010 – Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 4, and Status of Generic Communications for Unit 2 - Revision 4 Project stage: Other ML1032100192010-10-31031 October 2010 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System (Nonproprietary), WNA-AR-001 80-WBT-NP, Revision 0, Dated October 2010. Attachment 2 Project stage: Request ML1031403142010-11-0101 November 2010 OL - TVA Letter to NRC_10-29-10_WBN U2 FSAR 101 Project stage: Request ML1032001462010-11-0909 November 2010 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1032106442010-11-17017 November 2010 Revision of Commitment for Implementation of the Maintenance Rule Project stage: Request ML1106910592010-12-16016 December 2010 Request for Comments Project stage: Request ML1035405602010-12-17017 December 2010 Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information Project stage: Supplement ML1106806302011-01-12012 January 2011 OL - FW: RAI 15.5-1 Response Needed to Complete Draft SE Project stage: Request ML1102104862011-01-21021 January 2011 Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5 Project stage: Other ML1104504952011-02-10010 February 2011 Submittal of Pre-op Test Instructions Project stage: Request ML1106806242011-02-11011 February 2011 OL - FW: Updated OI List Project stage: Request ML1104702722011-02-11011 February 2011 Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information Project stage: Response to RAI ML1104202282011-02-11011 February 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 7 Instrumentation and Control Project stage: Request ML1106806252011-02-11011 February 2011 OL - NRC I&C RAI Metrics Project stage: Request ML1106806262011-02-15015 February 2011 OL - FW: 20110211 Open Item List Master TVA Update 02-14-11.docx Project stage: Request ML1106806532011-02-16016 February 2011 OL - TVA Letter to NRC_02-16-11_TS-TS Bases Supplemental Info Project stage: Request ML1106806522011-02-16016 February 2011 OL - 02-16-11_2-PTI-063-05-A & 2-PTI-063-05-B Transmittal to NRC Project stage: Request ML1104904372011-02-16016 February 2011 Submittal of Pre-op Test Instructions Project stage: Request ML1104905702011-02-16016 February 2011 Supplemental Information for Review of Developmental Revision a of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases) Project stage: Request ML1106806282011-02-18018 February 2011 OL - FW: Updated OI List Project stage: Request ML1104808172011-02-18018 February 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Submittals Related to Section 7 Instrumentation and Control Project stage: Request ML1104807512011-02-18018 February 2011 Notice of Meeting with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant, Unit 2, Final Safety Analysis Report Related to Section 15 Accident Analyses Project stage: Request ML1105506522011-02-22022 February 2011 Response to Antitrust Clarification Questions Project stage: Request ML1106806552011-02-22022 February 2011 OL - TVA Letter to NRC_02-22-2011_Response to Anti-Trust Clarification Questions Project stage: Request ML1106806292011-02-22022 February 2011 OL - NRC Bucket List Project stage: Request ML1106806572011-02-23023 February 2011 OL - TVA Letter to NRC_02-22-11_PTI 2-PTI-065-01 Transmittal to NRC Project stage: Request 2010-04-20
[Table View] |
Text
George H. Gellrich Calvert Cliffs Nuclear Power Plant, LLC Vice President 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax CENG a joint venture of ConstelLaeon eDF CALVERT CLIFFS NUCLEAR POWER PLANT May 18, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Application of Limiting Condition for Operation 3.0.5
REFERENCE:
(a)
Letter from Mr. G. H. Gellrich (CCNPP) to Document Control Desk (NRC), dated October 25, 2010, License Amendment Request: Revision of Limiting Condition for Operation 3.0.5 Calvert Cliffs Nuclear Power Plant, LLC (CCNPP) submitted a licensee amendment request (Reference a) requesting a change to the words in Limiting Condition for Operation (LCO) 3.0.5 to clarify the conditions under which LCO 3.0.5 can be used.
Limiting Condition for Operation 3.0.5 states "Equipment removed from service or declared inoperable to comply with ACTIONs may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment.
" However, there are LCOs where the steps taken to comply with ACTIONs do not involve removing equipment from service or declaring equipment inoperable.
Instead the steps taken to comply with ACTIONs include placing a different train into service, repositioning of equipment and other steps that do not match the exact wording of LCO 3.0.5.
Listed below are several CCNPP Technical Specifications that do not involve equipment removed from service or declared inoperable in order to comply with ACTIONs.
TS 3.3.7 (Containment Radiation Signal)
CONDITION B:
One required Manual Actuation channel or Actuation Logic channel inoperable.
REQUIRED ACTION:
Place and maintain containment purge and exhaust valves in closed position.
Document Control Desk May 18, 2011 Page 2 TS 3.3.8 (Control Room Recirculation Signal)
CONDITION A:
CRRS trip circuit or measurement channel inoperable in MODES 1, 2, 3, or 4.
REQUIRED ACTION:
Place one Control Room Emergency Ventilation System train in recirculation mode with the post-loss-of-coolant incident filter fan in service.
TS 3.4.11 (Pressurizer Power-Operated Relief Valves)
CONDITION A:
One or two PORVs inoperable and capable of being manually cycled.
REQUIRED ACTION:
Close and maintain power to the associated block valve.
CONDITION C:
One block valve inoperable.
REQUIRED ACTION:
Place associated PORV in override closed.
TS 3.7.3 (Auxiliary Feedwater System)
CONDITION A:
One steam-driven AFW pump inoperable.
REQUIRED ACTION:
Align remaining OPERABLE steam-driven pump to automatic initiating status.
TS 3.7.8 (Control Room Emergency Ventilation System)
CONDITION A:
One or more ducts with one outside air intake isolation valve inoperable in MODE 1, 2, 3, or 4.
REQUIRED ACTION:
Close the OPERABLE outside air intake valve in each affected duct.
Reference (a) proposed to modify the words in LCO 3.0.5 to encompass the steps taken in these ACTIONs and other similar situations. Following discussions with the Nuclear Regulatory Commission (NRC), CCNPP now requests a written interpretation from the NRC as to whether the current wording of LCO 3.0.5 addresses the conditions listed above and other similar situations. Upon receipt of a written interpretation, CCNPP will consider withdrawing Reference (a) from NRC review.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
Very truly yours, GHG/KLG/bjd cc:
D. V. Pickett, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR